Agenda Item No. 13 CABINET DATE - 14th February 2005 REPORT OF - Executive Director of Services SUBJECT - Towards a Procurement Strategy – a consultation document on the future of procurement. STATUS - Open FORWARD PLAN REF NO. - CS 02/05/4 Corporate EXECUTIVE SUMMARY All of the Council’s £180M budget is subject to procurement. Improving services and delivering efficiencies requires the Council to consider alternative ways of delivering its services. This is not just buildings, resources, goods and services but also collaboration and partnerships with other public sector agencies and private sector businesses. This is known as strategic procurement. It is a big change from when procurement was simply about ‘buying things’. To make the most of the potential for service improvement and efficiencies, whilst avoiding entering into contracts that are poorly structured and potentially expensive in the long term, requires the Council to take a considered strategic approach. Proposals in the report set out an approach to strategic procurement and implement the National Procurement Strategy to delivery efficiency improvements in local services through procurement, partnering and collaboration (Gershon). RECOMMENDATIONS STRATEGIC PROCUREMENT 1. That the approach to strategic procurement is approved (paragraphs 4.3, 4.4, Appendix 1 and Appendix 2) 2. That the response to the RCE strategic procurement mapping exercise is noted (Appendix 3) 3. That a moratorium on starting new procurements likely to be influenced by the outcomes of the service review (paragraph 4.9) is implemented subject to any exemptions agreed with the Executive Director Corporate Services and the Chief Executive. 4. That all Elected Members receive training on the National Procurement Strategy and the implications of the Gershon Review. NATIONAL PROCUREMENT STRATEGY 5. The actions responding to the fitness check are approved (Paragraph 5.27) 6. The role and terms of reference of the Efficiency Board is approved (Appendix 5); RESOURCES 7. Funding the development of the strategic review and outline business case from the ODPM capacity building funding allocated to procurement (£135,000) is approved (Paragraph 6.2) 8. The approach to demonstrating that the Procurement Consultancy provides value for money is approved (paragraph 6.5) 9. That the intention to conduct a future review of the Council’s procurement capacity and other resources involved in procurement is approved (paragraphs 6.6 and 1.19) GERSHON 10. That a further report with a corporate approach incorporating the remaining different strands of Gershon be presented to Cabinet. (Target date 4th April 2005). REASONS FOR DECISION The Council has a requirement by the ODPM to implement the National Procurement Strategy and achieve 2½ % annual efficiency savings. 1. BACKGROUND AND CONTEXT 1.1 During 2004 Sir Peter Gershon concluded his review into Public Sector Efficiency. In doing so he sought to establish that local government could be more efficient. Savings realised through greater efficiency in the four key areas of procurement, corporate services (back office functions) productive time and transactions would save local Government £6.45 billion or 2.5% per annum. This money could (in part) be released to support front line services. 1.2 In particular he felt that the quality of services ought to be a feature of service improvements, not overly simplistic baseline costs. HM Government has now issued guidance to Council Leaders and Chief Executives entitled ‘Delivering Efficiency in Local Services’ and an ‘Efficiency Technical Note’ (ETN) to establish ways in which efficiency will be measured and accounted for within local authorities. These efficiencies will be split into 2 categories, cashable and non-cashable. 1.3 Council Leaders and Chief Executives will have to sign an Annual Efficiency Statement on how they will achieve the gains. Additionally, they will have to submit an annual return stating whether the gains were in fact achieved and audited as such. 1.4 The efficiency gains will be manifested in: Reduced prices (procurement, labour costs, etc) for same outputs; Additional outputs or improved quality (extra service, productivity, etc) for same inputs; Improved ratios of costs / output (unit costs etc.) 1.5 Gershon asserts that these gains will only be achieved through aggregation (economy of scales) and collaborative arrangements between local authorities and a range of public/private sector partners. 1.6 Running in parallel to Gershon, is the National Procurement Strategy (NPS). This Strategy seeks to achieve improved services through reducing procurement costs and improving procurement standards and processes. 1.7 The milestones for the NPS are spread over 3 years, with full compliance being required by the end of 2006. The milestones for the 3 years of the NPS are based on the following main elements: Providing Leadership and Building Capacity; Partnering & Collaboration; Doing Business Electronically (e-procurement); Stimulating Markets & Achieving Community Benefits; Analysis and Performance Targets; Procurement Policy and Processes. 1.8 It is most important to recognise that the development and implementation of the NPS and strategic procurement is not merely a “bolt-on” which is done in isolation from the rest of the Authority. 1.9 The NPS and strategic procurement will together be the effective mechanism to help define the future style and delivery of services for the Authority. In order to succeed, it must be owned by the political and officer executives, and incorporated into the Council's business and service planning processes. 1.10 Nine centres of procurement excellence were established by the ODPM/LGA to co-ordinate NPS activities on a regional basis 1.11 The Gershon and Strategy Initiatives have their discrete elements, but substantially coincide in respect of delivering efficiency gains through partnership working. 1.12 The centres of procurement excellence have been redesignated as Regional Centres of Excellence (RCE) and their remit widened in order to co-ordinate activity on Gershon and not just procurement. This Council falls under the Yorkshire and Humber Centre, which is based at Leeds City Council. 1.13 In order to establish a base line position, the RCE is undertaking a mapping exercise to identify the potential for collaboration and joint delivery of services across the area. 1.14 During September 2004, the IDeA undertook a “fitness check” of the Council’s preparedness for compliance with the National Procurement Strategy. Following on from a draft report, a meeting was held with the IDeA and the RCE in respect of incorporating elements of Gershon into a revised report. 1.15 The Council established a corporate procurement function in 1997 to identify and effect opportunities for corporate contracts, to assist in high value one-off procurement exercises and to advise the Authority on purchasing issues and good practice. 1.16 During late 2000, a Corporate Working Group was established with the objective of devising a new Procurement Strategy. The Strategy was adopted by the Council in October 2001. This Strategy has achieved tactical control of purchasing and procurement operations within the Authority, but now needs to be refocused in order to deliver strategic procurement. 1.17 The Procurement Consultancy has established and maintains a Corporate Contracts Catalogue (CCC) of 34 individual contracts representing a spend of £6 million pa. Additionally, and more significantly, the Consultancy has supported a number of procurement exercises over the past 8 years, which has further increased the mixed economy of providers. This has included the outsourcing of Leisure Services, the Auditorium, Heating Maintenance Services and a project team approach to a number of other services and supply contracts. The Consultancy has an ongoing and substantial work programme for 2005/06. 1.18 The Consultancy has undertaken a significant amount of project work over its lifetime, including 60 OJEU European tendering exercises, including 6 by way of the Negotiated Procedure. It handles over 100 individual requests for service annually. Additionally, it maintains an Intranet and Internet facility, and has held 3 market development events in 2004. The Consultancy undertakes regular customer satisfaction monitoring and is currently achieving satisfaction levels of 93%. 1.19 The dedicated procurement/commissioner establishment for the Authority currently includes: Procurement Consultancy – Corporate Services; 6 FTE Business Development Unit – Community Care; 4 FTE Business Support – Learning & Child Care; 2 FTE Supporting People – Community Care. 2 FTE Additionally, there are purchasing/contracting elements within Engineering, Architects and I.T. 2. DRIVERS FOR CHANGE 2.1 There are many drivers for change in how goods and services are procured. These include; Local Strategic Partnerships, CPA outcomes, Government Modernisation, capital investment, cost reductions, Gershon, Risk Transfer, Best Value, failing services and systems. Many of these may lead to more partnering and private sector involvement in Council services. 2.2 The Council has to decide how the services it provides will be delivered and procured. Potential service delivery options, include: Partnership and partnering, with public, private and voluntary sectors Mixed service provision (with other providers delivering part of the service under contract) Long term contracts and major joint ventures such as PPP/PFI and outsourcing Delivering services in-house 2.3 Partnering, collaboration and private sector involvement to deliver improvement can have a profound impact on how the Council is structured. The options range from a ‘thin’ Council that is effectively a strategic, policy and commissioning body with services delivered by other partners and a ‘fat’ Council that delivers everything in-house. 2.4 The fat council is probably not a viable option taking into account the Council’s financial position and the requirement to continually improve performance and efficiency. In practice; a mixed economy is most likely to deliver better and more efficient services. This approach plays to the Council’s strengths and applies investment, capacity and expertise that Councils may not be able to apply themselves. 2.5 The Council already operates a mixed market. However it is important to corporately review all services and contracts and take a strategic approach to considering partnerships and collaboration. This will maximise the potential to improve services and ensure the resultant changes and improvements are achievable, can be delivered and managed effectively. 2.6 Implementing partnership arrangements is a lengthy and expensive process. In the short term we can continue to trim away at budgets. However, the efficiencies required by Gershon will become difficult to achieve in years 3, 4 and 5 if action is not taken now to consider and begin to implement new delivery arrangements. 2.7 Currently there is a significant amount of partnering activity between the public and private sector driven by Government. The Council needs to recognise this is not necessarily a buyer’s market. This means the Authority’s approach, packaging and timing of partnering options is important. An early start will give the Council the most freedom in developing options with partners. 2.8 If the Council takes no action, the opportunity to influence and set the direction of partnerships will reduce. As time elapses and partnerships and collaborations develop, the Council may be obliged to join other existing partnerships whose direction is already set. It is also vital that the Council recognises the importance of being a good client and partner. This involves making decisions rapidly, avoiding bureaucracy, responding positively to innovation, and having realistic commercial awareness. 3. PRIORITIES 3.1 The priorities in dealing with these issues are; a) Develop and implement a strategic procurement strategy b) Implement the National Procurement Strategy c) Secure resources to deliver the strategies The report considers these priorities in turn. 4. STRATEGIC PROCUREMENT 4.1 The RCE is undertaking a mapping exercise in order to identify the potential for collaboration and joint delivery of services across the Yorkshire and Humberside. The mapping exercise asks authorities to consider whether it wishes to: provide services in whole or in part for another Council; transfer the services in whole or in part to another Council; collaborate or jointly providing the services; not take up any of the above. 4.2 The Council has been asked to submit its response by the end of January 2005. The Council’s response is included at Appendix 3. This exercise is merely an early indication of the potential areas for collaboration, etc but much more detailed work and analysis needs to be undertaken before the Council is in an informed position. 4.3 To achieve this informed position, the Council needs a more “scientific” approach. The objectives of the approach must be to; Determine how services should be delivered given the Council’s present performance, its capacity to improve and its aspirations for the future. Produce a robust business case that demonstrates the viability of the proposed options and ensure decision making is based on a business case and risk analysis. Quantify and identify the performance improvements and efficiencies that that will be realised as a result of implementing the proposed options. Prepare procurement, project and change management plans. Secure the necessary resources to implement the proposed options. Seek a decision to implement the preferred options. 4.4 An outline approach which develops from the RCE mapping exercise is proposed. The proposed approach is made up of the following key stages: A process to assess all Council services against pre-determined criteria to identify appropriate service delivery options, assess risk and select the option(s) most likely to deliver improvement and efficiencies. This will populate the matrix shown at Appendix 1. Engage in a dialogue with potential private and public sector partners to ensure the options are based on facts and are achievable. Develop a programme to facilitate and deliver the early phases of the programme using external resources. Transfer skills from the early phases to develop in house capacity to deliver later phases of the programme and to act as an intelligent client. Where the Council retains control over the delivery of services, an Efficiency and Innovation partner could be engaged to share the risk of delivering performance improvement and efficiency gains. Establish robust change and project management arrangements. 4.5 An outline action plan for implementing the approach is shown in Appendix 2 and incorporates the 4Ps gateway review process. The action plan also identifies internal and external resources required to deliver the methodology and subsequent programme. 4.6 The most significant external resource required is that of a strategic procurement project manager. The Council needs to engage a suitably skilled and experienced manager in order to further develop the methodology and devise the programme. It is envisaged that an initial strategic review will take up to three months and the development of an outline business case a further three months. 4.7 Initial discussions have been held with the RCE and OGC in respect of potential candidates. It is likely that such a consultant may be available on 1 of the OGC framework arrangements, therefore negating the need for a formal procurement exercise. This is set out in more detail in Section 5 Resources. 4.8 Notwithstanding this initial work, the subsequent programme for establishing the collaborative partnerships is likely to be 3 years. Therefore, capacity for implementation and contract management of a corporate strategic procurement programme needs to be established. Options for this will be developed as part of the scope of the initial programme development work. 4.9 Although the Annual Procurement Plan for 2005/06 has not as yet been established, a number of tactical procurement exercises have been advised to the Procurement Consultancy Manager. It is proposed that there is a moratorium on all procurement exercises, which may be affected by the outcome to this strategic procurement review. This is to ensure that a strategic approach is used to package potential partnership and collaboration projects. 5. NATIONAL PROCUREMENT STRATEGY (NPS) 5.1 This section of the report summarises the actions proposed to implement the National Procurement Strategy milestones and summarises the priorities identified by the IDeA fitness check report. 5.2 Providing Leadership and Building Capacity; One of the key leadership tasks is to build the capacity and capability of the Council for a modern, strategic approach to procurement. This means ensuring that a corporate procurement strategy and the necessary people, processes and technology are in place and are making a difference. 5.3 The IDeA have highlighted in their publication “Procurement Best Practice Guidance”, the need for Member involvement. However, it recogniss the need to balance executive decision making and scrutiny roles, with the concern that Members should not be involved in detailed procurement activities. 5.4 The Council has developed “Common Standards for the Involvement of Members within the Procurement Process”. The standards have also been incorporated into the Council’s CPRs. These standards need to be revised in order to incorporate a gateway review process. This is particularly relating to the role of scrutiny in ensuring projects deliver against business cases and through to contract/contractor performance 5.5 It is important that Members have a level of skill and competency commensurate with their role within the procurement process. The 4P's and IDeA are offering a training module in their Member development package, which the Council will pursue in this regard. This is in addition to the internal and external training that Members have already undertaken. Additional training will be devised and delivered in respect of key Portfolio Holders and Chairs of Scrutiny equally, as will the Member Champion, currently Councillor Brookes. 5.6 The CMT Procurement Champion is John Harrison. A role of CMT is to recognise the strategic importance of procurement and ensure that the Corporate Procurement Strategy is incorporated in to strategic and corporate planning processes. This means that effective procurement is a corporate responsibility. 5.7 The Efficiency Board, already approved by CMT, will provide significant input into supporting CMT with the strategic direction and implementation of procurement and other efficiency issues. The draft terms of reference for the Efficiency Board are attached as appendix 5. The first meeting is arranged for February 4th. 5.8 Partnering & Collaboration; The strategic procurement approach in section 4 will identify opportunities for services to partner and collaborate. The IDeA report notes that NELC already includes a number of regional and national contracts within its own Corporate Contracts Catalogue (CCC). The report goes on to encourage the Council to check that such arrangements continue to provide best value for money. 5.9 In addition to this, the Leaders of the 4 unitary Councils comprising this subregion have agreed to explore the potential for efficiencies, with the initial focus being on the CCC and a joint/collaborative procurement function. The East Riding of Yorkshire Council has put itself forward to take the operational lead in respect of this work. An initial meeting to develop possible options is scheduled for January 28th 2005. 5.10 It is likely that only a limited catalogue of goods and services could best be achieved on a sub-regional basis. There are a number of purchasing consortia (such as YPO, ESPO, OGC) already operating both at a regional and national level, which recognise substantially more “buying power” and “leverage”. The RCE will also identify other collaboration opportunities and there may be merit in considering collaboration with Lincolnshire County Council, its associated District Councils, and the East Midlands RCE. 5.11 Before any future collaborative arrangements are agreed, it is essential that the full range of options is taken into account. A business case should be developed to quantify the potential benefits of such an arrangement and set out how the benefits would be achieved and accounted for. It will also be essential to obtain clarity on how a collaboration would be resourced and managed. An impact analysis will assess the implications on the capacity to manage and deliver strategic and operational procurement needs if capacity/capability were to be ‘transferred’. 5.12 Doing Business Electronically (e-procurement); The Council has not engaged with this agenda as yet. The National e-Procurement Project (NEPP) and Pathfinder Projects, will give a substantial short cut to the Council’s ultimate decisions as to which e-procurement solution it chooses. 5.13 The NPS identifies the benefits of e-Procurement solutions in the pursuit of business efficiency through such tools as: Purchase to Pay e-auction e-tendering Marketplace & e-procurement software Purchasing Cards 5.14 The pursuit of e-procurement forms part of the IDeA action plan, but is complementary to work already being undertaken in respect of the Consultancy Commission into IT and e-government, and also the work being undertaken by Finance in respect of Purchase Order Processing (POP). The Council has requested support from the IDeA e-government Implementation Support Unit to assist developing a strategy and business case for egovernment. 5.15 Stimulating Markets & Achieving Community Benefits; Under the Local Government Act 2000, Councils are required to prepare a community plan (Community Strategy as defined in the Act) and have powers to promote the economic, social and environmental well-being of their communities. Provided that there is compliance with EC public procurement regulations and Best Value, Councils can work with suppliers to realise “community benefits” of this kind through their procurement activities. 5.16 Councils need to encourage a mixed range of suppliers to help stimulate a varied and competitive market place. This includes understanding the supplier’s perspective and marketing the Council to suppliers. Councils also need a diverse and competitive supply base to help improve value for money and to develop suppliers to meet new or emerging requirements. 5.17 Collectively, Council’s have significant buying power. They can use that buying power creatively to stimulate innovation. By working with suppliers, Councils can encourage the best to gear their business planning and research and development efforts to the needs of local government. 5.18 The Procurement Strategy will take into account the social, economic and environmental impact on the region. It may not be desirable to see a configuration of partnerships that leads to a net export of jobs out of the area. The Council leading a partnership or collaboration, regardless of whether it be public or private, could result in a net import of jobs with the consequent benefits. 5.19 Analysis and Performance Targets; The Council is currently undertaking an analysis of its purchasing spend. This information will fundamentally set out on a Council and individual Directorate basis, how much the Council spends, with whom and on what. 5.20 This information will allow the Council to understand its procurement spend, in order to identify opportunities for targeted savings and for the achievement of economies of scale, through collaboration. The information also allows for the tracking of spend with local and SME businesses. 5.21 Currently there are no national performance Indicators in respect of procurement. However the IDeA, in conjunction with the Audit Commission, have devised 34 local performance indicators (LPIs). 5.22 The RCE are in the process of selecting 10 of these LPIs by which the 22 Local Authorities in the area can measure and compare their performance. 5.23 The Council has proposed the following 10 indicators for consideration by the RCE. No. LIB/P1 Title Strategy Implementation LIB/P3 Best Practice LIB/P4 Aggregation 1 LIB/P5 Aggregation 2 LIB/P6 Project Management LIB/P7 Gateway Reviews LIB/P12 Satisfaction with corporate procurement function Predictability – time to procure LIB/P14 LIB/P20 LIB/P22 Commodity goods price comparison Average Invoice Value Description Percentage of milestones activities completed in the National Procurement Strategy for Local Government Percentage of the value of contracts awarded that commence in the financial year in accordance with standing orders aligned with procurement best practice Percentage of corporate spend aggregated through corporate framework arrangements and corporate contracts Percentage of corporate spend aggregated through collaboration with other public sector organisations Percentage of medium and high-risk projects managed under a structured project management method Percentage of medium and high-risk projects to which the 4P's Gateway Review Process is applied Average time from publication of Official Journal of the European Union (OJEU) notice (Gate 2) to contract signature (Gate 3) as percentage of time allotted in any approved business case A “shopping basket” of 10 commodity goods Corporate spend divided by total number of invoices 5.24 The purchasing analysis and performance indicators will provide a baseline of information against which future performance can be compared. Additionally, the baseline information will allow for target setting both in terms of savings and increased performance. 5.25 Procurement Policy and Processes. The Council has a number of existing Policies and Procedures in respect of procurement. They are as follows; Procurement Strategy, Contract Procure Rules, Common Standards for the involvement of Members and Unions and Procurement Consultancy Procedures Manual. These documents recognise the need for accountability, but also take account of commercial reality. 5.26 The processes and policies are substantially modern and already incorporate good procurement practice. However, all of them will need to be revised to take account of this new strategic procurement strategy. They need to be reinforced in the areas of business case, gateway review, sustainable procurement and incorporation of the guidance of the commission for racial equality. 5.27 IDeA Fitness Check The Council’s preparedness for compliance with the NPS was evaluated by the IDeA. The report, attached at Appendix 4, assesses where the Council has achieved the milestones of the NPS and sets out recommendations where the Council has still to achieve them. The Fitness Check Team concluded that the priorities for action are: a) Develop an efficiency strategy based on a baseline assessment of current service provision in terms of cost and performance, prioritise the number of strategic procurement projects based on the capacity of the Council and then project manage each of the projects using a project management methodology such as Prince 2;. Delivered by the strategic procurement approach (Recommendation 1) b) Adopt a strategic procurement management approach including clarifying further the respective roles and responsibilities of executive, scrutiny and officers in the procurement process (including, for example, definition of outcomes, robust options appraisal, scrutiny of business cases, contract management and gateway reviews); Delivered by the strategic procurement approach (Recommendation 1) c) Review systems to ensure compliance with internal and external procurement rules and regulations e.g. EC Procurement Directives; Delivered by the Procurement Consultancy Business Plan 2005/2006 (paragraph 7.2). d) Develop an appropriate organisational structure to reflect the Council’s procurement needs and create a method of sharing procurement know-how throughout the Council with a centre of expertise and also sharing of knowledge and best practice; Delivered by the approach to reviewing the organisation structure as set out in paragraph 6.6 (Recommendation 3) e) Develop the Procurement Strategy to align with corporate objectives and the National Procurement Strategy. In addition, develop an e- f) g) h) i) procurement business case and strategy and consider the full range of options; Delivered by the Procurement Consultancy Business Plan 2005/2006 (paragraph 7.2). Support to develop an e-procurement strategy has been requested from IDeA e-government Implementation Support Unit. Update the current review guidance in order that there is a more rigorous and robust approach to options appraisal during strategic reviews; Delivered by the Procurement Consultancy Business Plan 2005/2006 (paragraph 7.2) and delivered by strategic procurement approach (Recommendation 1) Explore further options for collaboration with other councils, other public sector bodies, and the Regional Centre of Excellence in order to benefit from economies of scale; Delivered by the strategic procurement approach and sub regional procurement initiative in paragraph 5.9 (Recommendations 1 and 5) Undertake a procurement skills analysis for Members and officers and develop appropriate procurement training programmes; Delivered by the Procurement Consultancy Business Plan 2005/2006 (paragraph 7.2). Develop a performance measurement system for procurement. Delivered by the approach to performance management proposed in paragraph 5.23 (Recommendation 5) 6. RESOURCES 6.1 As set out above, the Council’s future procurement strategy is a combination of achieving strategic procurement and compliance with the National Procurement Strategy. 6.2 Strategic procurement it is proposed that the strategic options review and development of the outline business case is funded from the ODPM Capacity Building Grant allocated to procurement. Project Manager £ 77,000 External legal advice £ 25,000 External Financial advice £ 20,000 Other costs £ 13,000 Total £135,000 6.3 Procurement Consultancy The existing capacity of the procurement consultancy will Support the development and delivery of a strategic procurement programme; Lead and support the implementation of the National Procurement Strategy; Deliver the current workplan (including updating the Procurement Strategy and developing the Annual Procurement Plan) Deliver the Annual Procurement Plan 6.4 It is vital that the procurement function delivers real and measurable outcomes. The budget for 2005/2006 determined that the consultancy should be self financing (i.e. the worth of the consultancy is greater than its cost.) 6.5 It is proposed that this self financing be accounted for on the following basis: That the Consultancy delivers accountable cashable and non cashable efficiencies in accordance with the Audit Commission efficiency technical note (due Jan/Feb 2005); That a cash value is given to the delivery of the National Procurement Milestones funded from the savings identified from the introduction of eprocurement; That for any strategic partnering exercise in which the consultancy is involved, a project fee included within the Business Case is agreed as a part of the procurement costs payable by the commissioning Directorate. 6.6 The future role of the Procurement Consultancy and other resources involved in procurement across the Council will be reviewed when the strategic options review is complete. This will take into account the corporate and service requirements for ‘intelligent client’ capacity. 6.7 Internal Resources The implementation of these proposals will require substantial input from all directorates. This has not been quantified at this early stage, but it can be anticipated that ; Policy, Performance & Development (PPD) would be involved early on shaping the performance elements of the assessment criteria and the provision of baselining data. PPD would be involved in the development of a change management programme. Finance would be involved in the provision of baselining data and the business case. Directorates will be required to provide information, engage in market dialogue and lead projects at a later stage. 6.8 The philosophy behind the strategic procurement approach is to build the options matrix where possible from existing data. However it is likely that the input required will be difficult to deliver. It is important that the organisation considers the priority it attaches to this project so that the resources and timescales can be negotiated accordingly. 6.9 External resources The implementation of these proposals will be supported where possible by relevant external support. This includes; IDeA – an initial 12 days procurement support RCE –Mentoring and access to capacity building resources and funds. The RCE have expressed an interest in supporting the development of the approach to strategic procurement. E-government Implementation Support Unit – for assistance with eprocurement 4Ps - Member Development & Training (This training is provided at the rate of £600 and can be met from existing budget) 7. WHAT HAPPENS NEXT? 7.1 The approach will be developed into a more detailed programme setting out roles and responsibilities, plans and draft criteria for assessing service delivery options for consideration by CMT. A project manager will be identified. (Target date 2nd March 2005) 7.2 Procurement Consultancy Business Plan developed to incorporate performance management framework and targets, annual procurement plan 2005/6 (including a specific efficiency/savings and funding schedule), and revised Procurement Strategy. (Target date; end of March 2005) 7.3 The Efficiency Board will report to CMT with a corporate approach that incorporates the different strands of Gershon. A further Report will be presented to Cabinet, via Overview and Scrutiny Board, setting out this corporate approach and seeking approval for its implementation. (Target date April 2005). 8. OTHER OPTIONS CONSIDERED 8.1 The report considers the methodology and resources required to develop options, as opposed to recommending a solution. The option of not complying with either the NPS or Gershon is not open to the Authority. By being an early adopter, the Council will have a great range of options and choice, than were it to take a “wait and see approach. 9. CONSULTATION WITH SCRUTINY 9.1 The Report emphasises, at paragraph 5.5, the importance of including Scrutiny in the procurement process. The role of Scrutiny is at its most influential level to scrutinise procurement strategy, and secondly to undertake gateway reviews of the procurement programme consequent of the strategy. 10. FINANCIAL IMPLICATIONS 10.1 The immediate external costs of £135,000 are as set out at paragraph 6.2. These costs will be met by ODPM grant. There will also be significant in put from other agencies without charge as set out at section 3 of appendix 2. However, that same section also highlights the considerable input required from across the Council in terms of as yet unquantifiable staff time. 10.2 These costs can be compared to the potential pay back. Including capital, the Council's gross spending on services is some £300m per year. Achieving a target of 2.5% efficiency saving equates to £7m per annum of cash and non cash savings. These sums are well in excess of the future savings required by the Medium Term Financial Strategy. 11. LEGAL IMPLICATIONS 11.1 Decisions taken in respect of the Council's approach to procurement may necessitate a review of the Contract Procedure Rules (or Contract Standing Orders). 12. HUMAN RESOURCES IMPLICATIONS 12.1 With some procurement projects there will be significant HR implications. Strategic procurement may impact on skills (new technology), structures (integrated services) and conditions of service (flexible delivery). The Council must also ensure that we follow TUPE and ODPM guidance in terms of the workforce’. 13. WARD IMPLICATIONS Impacts on all Wards. 14. BACKGROUND PAPERS Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 15. Service Delivery Options Matrix Strategic procurement action plan RCE strategic procurement mapping exercise IDEA Fitness Check report Efficiency Board – Terms of Reference (draft) Procurement Consultancy Work Plan CONTACT OFFICERS Dave Shaw Deputy Director Strategic Business Support 01472 373871 John Carr Procurement Consultancy Manager 01472 324127 JOHN HARRISON EXECUTIVE DIRECTOR CORPORATE SERVICES
© Copyright 2026 Paperzz