Status of Departmental Non-Functional Water Supply Schemes In Respect of the PHE Division Lasbela S. no 1 1 Name of Water Supply Scheme Status of Departmental Water Supply Scheme 2 3 WSS Ghulam Muhammad Non-Functional Science 2 Years Gador Kund Gaddani Reason Non-Functional If Non-Function Components to be Required 4 5 1-Burning of Transformer 1-Repaire of Pmt. 50 KVA 2-Damage of Main Pipe 2-Three Phase Cable 100 Line due to Sea Intrusion Rft 3-R\Replacement Line i\c Specials. 2 WSS Sukhan Tehsil Uthal Partial Functional Acute Low Voltage Since Past 4 Years Cost Required Rs. In Million 6 0.250 0.040 Pipe 0.700 4-Repaire of Community Tanks 8-Nos 0.500 Total R.s 10490 1-S/Inst. Of 40 KVA DG Set 2-Nos. Pump 1-No. 2.900 2-S\Inst. Of Submersible 0.600 3-Repaire of Main Pipeline 0.300 Total R.s 3.800 Status of Community Based Non-Functional Water Supply Schemes In Respect of the PHE Division Lasbela S. no 1 1 Name of Water Supply Scheme 2 WSS Sakran-2 Hub Status of Departmental Water Supply Scheme 3 Non-Functional Science Many Years Reason Non-Functional If Non-Function Components to be Required 4 5 Community Not Willing 1-Repaire of Pmt. To Operate The Scheme. Therefore Rehabilitation; 2-Three Phase Cable 100 not feasible. Rft 3-R\Replacement Line i\c Specials. 2 WSS Changlani Bela Non-Functional Science Many Years Community Not Willing To Operate The Scheme. Therefore Rehabilitation; not feasible. Cost Required Rs. In Million 6 0.250 0.040 Pipe 0.700 4-Repaire of Community Tanks 8-Nos 0.500 Total R.s 10490 S. no Name of Water Supply Scheme Status of Departmental Water Supply Scheme 1 3 2 WSS Abdul Rehman Dawn Bela 3 Partial Functional 4 WSS Wayaro Uthal Non-Functional Science Many Years. Reason Non-Functional If Non-Function Components to be Required 4 5 Casing Pipe Of T/Well 1-Tube Well. Damaged Due to Lightening .Therefore New 2-Pupm House 14’ x 16’. Tube Well Required Community Not Willing To Operate The Scheme. Therefore Rehabilitation; not feasible. Cost Required Rs. In Million 6 2.000 0.445 3-Linking Of Pipeline 0.100 R/O Machinery D.G 25KVA & Subm:/Pump. 0.300 Total R.s 2.845 S. no 1 5 6 78- 9- Name of Water Supply Scheme Status of Departmental Water Supply Scheme Reason Non-Functional If Non-Function Components to be Required 2 3 WSS Khair Muhammad Iban Non-Functional Science Many Winder Years. 4 5 Community Not Willing To Operate The Scheme. Therefore Rehabilitation; not feasible. WSS Essa Makora Sonmiani Scheme Non-Functional Science Tube Well Collapse Due 1-Resistivity Survey For 2-Years. To Corrosion. G.I4-Probes 3-Points 2-DD of Tube well Bore 600 Rft Deep. 3-Const Of Pump House Size 14’ x 16’. 4-S/L/J of PVC Pipeline 4’ dia 2000 Rft In Length. 5-S/Inst.25 KVC DG Set With 20-HP S/Pump. Total R.s WSS Goth Esa Danda Bela Non-Functional Science 2-Years Turbine Pump Damaged & 1-Supply & Installation Irreparable. Submersible Pump. WSS Yaqoob Bijrani Scheme Non-Functional Community Not Willing Gaddani To Operate The Scheme. Therefore Rehabilitation; not feasible. WSS Usman Jamali Lohi OSW Drayed In the Year 2003 Tube Well Exist. Other 1-S/Inst.25 KVC DG Set Dureji Science then Scheme Non- Components Required. With Submersible Pump. Functional New Tube Well Drilled During 2004-05. 2- Pump House Size 14’ x 16’. 3- S/L & Joining PVC Pipeline 3’ dia 2000 Rft. Total R.s Cost Required Rs. In Million 6 0.100 2.150 0.345 0.400 1.500 4.495 0.600 1.500 0.345 0.250 0.250 2.345 S. no Name of Water Supply Scheme Status of Departmental Water Supply Scheme Reason Non-Functional If Non-Function Components to be Required 5 1 10 2 WSS Saleh Safar Winder 3 Scheme Non-Functional 4 Community Not Willing To Operate The Scheme. 11 WSS Awaro Uthal Scheme Non-Functional Community Not Willing To Operate The Scheme. 12 WSS Kanraj Thana Scheme Non-Functional Machinery Ceased Pipeline Damaged. 13 WSS Yaqoob Gaddani 14- WSS Pir Goth Uthal Bijrani Scheme Non-Functional Scheme Non-Functional & 1-Repare Of Diesel Engine. 2-Pipeline Damaged 14’ x 16’. 3- Improvement of O.S.W. 4-Repare of Community Tank. 5-Repaire of Pump House. Total R.s Community Not Willing To Operate The Scheme. Therefore Rehabilitation; not feasible. Community Not Willing To Operate The Scheme. Therefore Rehabilitation; not feasible. Cost Required Rs. In Million 6 0.175 0.375 0.100 0.250 0.075 0.975 S. no 1 15 Name of Water Supply Scheme 2 WSS Saleh Safar Winder Status of Departmental Water Supply Scheme Reason Non-Functional 3 Scheme Non-Functional 4 5 Machinery Damaged 1-S/I Of 10-HP Repair Required. Submersible Pump. 2-Repaire of 25-KVA D.G Set. Total R.s 16 WSS Noor Muhammad Makora Uthal Scheme Non-Functional Community Not Willing To Operate The Scheme. 17 WSS Allah Bux Siahpad Sakran Hub. Scheme Non-Functional Community Not Willing To Operate The Scheme. 18 WSS Hishoo Bhit Sakran. 19- WSS Goth Ibrahim Shaik Hub. Scheme Non-Functional Since 6- Years. Scheme Non-Functional Since 3- Years. If Non-Function Components to be Required Drying of O.S.W New 1-S/L & Joining PVC Pipe Schemes of Water From 6” dia 5000 Rft & 4” dia Lasbela Canal Proposed. 2000 Rft. 2-Raw Water Tank 25000 G/Capacity. 3-Insst:of lectric Connection i/c 50-KVA PMT. 4-S/Instt: of E/A Centrifugal Pump. Total R.s Due To Chocking Of Tube 1-Open Surface Well. well New Source Required. 2-S/L Pipe 4” dia 1500 Rft. 3-R/O Machinery Cost Required Rs. In Million 6 0.275 0.075 0.350 2.122 1.500 0.600 0.250 4.472 0.178 0.381 0.080 Total R.s 0.639 S. no Name of Water Supply Scheme Status of Departmental Water Supply Scheme Reason Non-Functional If Non-Function Components to be Required 5 Cost Required Rs. In Million 6 1 20 2 WSS Rana Bit Winder 3 Scheme Non-Functional Since 6- Years. 4 Due To Increase Salinatery of Water Sweet Water Not Exist In The Area. 21 WSS Goth Ali Murad Winder Scheme Non-Functional Since 1- Years. Submersible Damage Irreparable. & 1-S/Inst Pump. of Submersible 0.600 22 WSS Gugan Goth Winder Scheme Non-Functional Since 6- Years. Submersible Damage Irreparable & 1-S/Inst Pump. of Submersible 0.600 23 WSS Wasla Bala Winder Scheme Non-Functional Since 3- Years. Tube Well Casing Damage 1-DD Of Tube Well Bore. Due To Corrosion. New 2-Linking OF Existing Tube Well Required. Source. Total R.s 1.500 0.100 1.600
© Copyright 2026 Paperzz