lasbela Water Supply Scheme

Status of Departmental Non-Functional Water Supply Schemes In Respect of the PHE Division Lasbela
S. no
1
1
Name of Water Supply
Scheme
Status of Departmental
Water Supply Scheme
2
3
WSS Ghulam Muhammad Non-Functional Science 2 Years
Gador Kund Gaddani
Reason Non-Functional
If Non-Function
Components to be
Required
4
5
1-Burning of Transformer 1-Repaire of Pmt.
50 KVA
2-Damage of Main Pipe 2-Three Phase Cable 100
Line due to Sea Intrusion
Rft
3-R\Replacement
Line i\c Specials.
2
WSS Sukhan Tehsil Uthal
Partial Functional
Acute Low Voltage Since
Past 4 Years
Cost
Required
Rs. In
Million
6
0.250
0.040
Pipe
0.700
4-Repaire of Community
Tanks 8-Nos
0.500
Total R.s
10490
1-S/Inst. Of 40 KVA DG
Set 2-Nos.
Pump 1-No.
2.900
2-S\Inst. Of Submersible
0.600
3-Repaire of Main Pipeline
0.300
Total R.s
3.800
Status of Community Based Non-Functional Water Supply Schemes In Respect of the PHE Division Lasbela
S. no
1
1
Name of Water Supply
Scheme
2
WSS Sakran-2 Hub
Status of Departmental
Water Supply Scheme
3
Non-Functional Science Many
Years
Reason Non-Functional
If Non-Function
Components to be
Required
4
5
Community Not Willing 1-Repaire of Pmt.
To Operate The Scheme.
Therefore Rehabilitation; 2-Three Phase Cable 100
not feasible.
Rft
3-R\Replacement
Line i\c Specials.
2
WSS Changlani Bela
Non-Functional Science Many
Years
Community Not Willing
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
Cost
Required
Rs. In
Million
6
0.250
0.040
Pipe
0.700
4-Repaire of Community
Tanks 8-Nos
0.500
Total R.s
10490
S. no
Name of Water Supply
Scheme
Status of Departmental
Water Supply Scheme
1
3
2
WSS Abdul Rehman Dawn
Bela
3
Partial Functional
4
WSS Wayaro Uthal
Non-Functional Science Many
Years.
Reason Non-Functional
If Non-Function
Components to be
Required
4
5
Casing Pipe Of T/Well 1-Tube Well.
Damaged
Due
to
Lightening .Therefore New 2-Pupm House 14’ x 16’.
Tube Well Required
Community Not Willing
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
Cost
Required
Rs. In
Million
6
2.000
0.445
3-Linking Of Pipeline
0.100
R/O Machinery D.G 25KVA & Subm:/Pump.
0.300
Total R.s
2.845
S. no
1
5
6
78-
9-
Name of Water Supply
Scheme
Status of Departmental
Water Supply Scheme
Reason Non-Functional
If Non-Function
Components to be
Required
2
3
WSS Khair Muhammad Iban Non-Functional Science Many
Winder
Years.
4
5
Community Not Willing
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
WSS Essa Makora Sonmiani Scheme Non-Functional Science Tube Well Collapse Due 1-Resistivity Survey For
2-Years.
To Corrosion.
G.I4-Probes 3-Points
2-DD of Tube well Bore
600 Rft Deep.
3-Const Of Pump House
Size 14’ x 16’.
4-S/L/J of PVC Pipeline 4’
dia 2000 Rft In Length.
5-S/Inst.25 KVC DG Set
With 20-HP S/Pump.
Total R.s
WSS Goth Esa Danda Bela
Non-Functional Science 2-Years Turbine Pump Damaged & 1-Supply & Installation
Irreparable.
Submersible Pump.
WSS
Yaqoob
Bijrani
Scheme Non-Functional
Community Not Willing
Gaddani
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
WSS Usman Jamali Lohi OSW Drayed In the Year 2003 Tube Well Exist. Other 1-S/Inst.25 KVC DG Set
Dureji
Science then Scheme Non- Components Required.
With Submersible Pump.
Functional New Tube Well
Drilled During 2004-05.
2- Pump House Size 14’ x
16’.
3- S/L & Joining PVC
Pipeline
3’ dia 2000 Rft.
Total R.s
Cost
Required
Rs. In
Million
6
0.100
2.150
0.345
0.400
1.500
4.495
0.600
1.500
0.345
0.250
0.250
2.345
S. no
Name of Water Supply
Scheme
Status of Departmental
Water Supply Scheme
Reason Non-Functional
If Non-Function
Components to be
Required
5
1
10
2
WSS Saleh Safar Winder
3
Scheme Non-Functional
4
Community Not Willing
To Operate The Scheme.
11
WSS Awaro Uthal
Scheme Non-Functional
Community Not Willing
To Operate The Scheme.
12
WSS Kanraj Thana
Scheme Non-Functional
Machinery
Ceased
Pipeline Damaged.
13
WSS
Yaqoob
Gaddani
14-
WSS Pir Goth Uthal
Bijrani
Scheme Non-Functional
Scheme Non-Functional
& 1-Repare
Of
Diesel
Engine.
2-Pipeline Damaged 14’ x
16’.
3- Improvement of O.S.W.
4-Repare of Community
Tank.
5-Repaire of Pump House.
Total R.s
Community Not Willing
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
Community Not Willing
To Operate The Scheme.
Therefore Rehabilitation;
not feasible.
Cost
Required
Rs. In
Million
6
0.175
0.375
0.100
0.250
0.075
0.975
S. no
1
15
Name of Water Supply
Scheme
2
WSS Saleh Safar Winder
Status of Departmental
Water Supply Scheme
Reason Non-Functional
3
Scheme Non-Functional
4
5
Machinery
Damaged 1-S/I
Of
10-HP
Repair Required.
Submersible Pump.
2-Repaire of 25-KVA D.G
Set.
Total R.s
16
WSS Noor Muhammad
Makora Uthal
Scheme Non-Functional
Community Not Willing
To Operate The Scheme.
17
WSS Allah Bux Siahpad
Sakran Hub.
Scheme Non-Functional
Community Not Willing
To Operate The Scheme.
18
WSS Hishoo Bhit Sakran.
19-
WSS Goth Ibrahim Shaik
Hub.
Scheme Non-Functional Since
6- Years.
Scheme Non-Functional Since
3- Years.
If Non-Function
Components to be
Required
Drying of O.S.W New 1-S/L & Joining PVC Pipe
Schemes of Water From 6” dia 5000 Rft & 4” dia
Lasbela Canal Proposed.
2000 Rft.
2-Raw Water Tank 25000
G/Capacity.
3-Insst:of
lectric
Connection i/c 50-KVA
PMT.
4-S/Instt:
of
E/A
Centrifugal Pump.
Total R.s
Due To Chocking Of Tube 1-Open Surface Well.
well New Source Required.
2-S/L Pipe 4” dia 1500 Rft.
3-R/O Machinery
Cost
Required
Rs. In
Million
6
0.275
0.075
0.350
2.122
1.500
0.600
0.250
4.472
0.178
0.381
0.080
Total R.s
0.639
S. no
Name of Water Supply
Scheme
Status of Departmental
Water Supply Scheme
Reason Non-Functional
If Non-Function
Components to be
Required
5
Cost
Required
Rs. In
Million
6
1
20
2
WSS Rana Bit Winder
3
Scheme Non-Functional Since
6- Years.
4
Due To Increase Salinatery
of Water Sweet Water Not
Exist In The Area.
21
WSS Goth Ali Murad
Winder
Scheme Non-Functional Since
1- Years.
Submersible Damage
Irreparable.
& 1-S/Inst
Pump.
of
Submersible
0.600
22
WSS Gugan Goth Winder
Scheme Non-Functional Since
6- Years.
Submersible Damage
Irreparable
& 1-S/Inst
Pump.
of
Submersible
0.600
23
WSS Wasla Bala Winder
Scheme Non-Functional Since
3- Years.
Tube Well Casing Damage 1-DD Of Tube Well Bore.
Due To Corrosion. New 2-Linking OF Existing
Tube Well Required.
Source.
Total R.s
1.500
0.100
1.600