observe challenges faced and best practices for the team

R-CDTA 8243: Statistical Capacity Development for Social Inclusion and
Gender Equality
Regional Workshop on Post-Fieldwork Discussion on the Pilot Surveys on Asset
Ownership and Entrepreneurship from a Gender Perspective
14–16 December 2015, Bangkok, Thailand
Status of Progress of Pilot Survey in
Mongolia
/Field Work Experience – A3/
SURVEY TEAM
NSO, MONGOLIA
14 December 2015
1
Basic organization of field operations
• Date and duration
• 18 September – 15 November 2015
• 9 aimags and UB
• Team composition
• 5 members: 1 supervisor and 4 enumerator
• Total 9 teams
• 1-2 male member(s) per team
• Workload
• 2 days per PSU
• Transportation
• Every team used 2 cars
Data quality
• Objectives of the monitoring
• observe challenges faced and best practices for the team; visit the
selected households with enumerators in order to observe their
interviewing, approaching the household members and check all
completed questionnaires perfectly; provide recommendations based
on observation and status of completed questionnaires on the site
• Monitoring Team
oMs.B.Saranchimeg, Team member
oMs.M.Oyuntsetseg, Team member
oMs.B.Ankhzaya, Team member
oMs.J.Tsogzolmaa, Team member
oMs.Z.Khuslen, Team member
oMr.B.Tamir, Team member
o Mr. Ch. Khurelbaatar, Head of the Financial Division, NSO
o Mr. D. Davaajargal, Officer of Census and Registration Department, NSO
o Mr. B. Ulambadrakh, Officer of Census and Registration Department, NSO
o Ms. Altantulkhuur, Officer of Population and Social Statistics Department, NSO
o Ms. E. Myagmarkhand, Officer of Population and Social Statistics Department,
NSO
Monitoring Team
Ms. Myagmarkhand,
NSOM
Mr. K. Joshi, ADB
Ms.B.Saranchimeg,
NSOM
Mr. D. Davaajargal
Ms. Z. Khuslen,
NSOM
Ms. B. Saranchimeg
Mr. B. Ulambadrakh,
NSOM
Mr. D. Davaajargal
, NSOM
Ms. B. Saranchimeg
NSOM
Mr. Ch. Khurelbaatar
Ms. N. Altantulkhuur,
NSOM
oMs.B.Saranchimeg, Team member
oMs.M.Oyuntsetseg, Team member
oMs.B.Ankhzaya, Team member
oMs.J.Tsogzolmaa, Team member
oMs.Z.Khuslen, Team member
oMr.B.Tamir, Team member
Recommendations
Monitoringreport_EDGE.pdf
Conclusion
• Participation of ADB was very useful and timely to start data collection
without any mistakes, be same understanding the survey questions,
item responses and concepts, and understand the situation and
challenges faced for fieldwork and country context.
• After this work, we prepared recommendation based on observations of
this monitoring and sent to all teams thru email to strictly follow this and
the instructions provided by the training and in the survey manual.
• We prepared a brochure and delivered to all teams again.
• Finally, it can be concluded that the monitoring held in all selected
aimags and UB was very timely and important event for data collection,
providing data quality and observing the challenges faced and best
practices for the fieldwork and attitudes of the respondents for the
survey.
Thank you for your attention
The Government Building III
Baga Toiruu-44
Ulaanbaatar-20а, Мongolia
Tel: (976)-11-329125
Fax: (976)-11-324518
E-mail: [email protected]
www.nso.mn
www.1212.mn