S E G M E N T P R O D U C T I O N L I K E A W O R L D C H AM P I O N . Segment Production Line 4: Consortium CL4S consisting of Ode- Contractor: brecht, Queiroz Galvão und Carioca Engenharia Photo: FVD Studio ID / OD / segment width: 10,330 / 11,130 / 1,800 [mm] Ring configuration / type: 7+1 / universal Tunnelling: Herrenknecht multi-mode TBM Total number of concrete segments: 22,032 Type of production: Carousel plant with 5 sets of moulds Top daily performance 114 segments in 16 h (Ø cycle time of 8.5 min) Top monthly performance: 2,240 segments Ø approx. 100 segments per day = Segment production plant for Metro Rio de Janeiro Line 4 Ø approx. 13 rings per day Perfectly positioned. The Consortium CL4S managed to establish a Equipment availability > 96% highly professional segment production plant in the center of Rio de Janeiro under massive time pressure. Following design, manufacture of the moulds and pre-assembly of the carousel plant in Schwanau, Germany, assembly and commissioning of the segment production plant in Rio took only two and a half months. An athletic performance, taking into consideration the scope of supply including 5 sets of segment moulds, carousel plant, reinforcement supply, concreting system, curing tunnel and a large package of handling equipment. Strong team performance. In spite of restricted and difficult space conditions, the production concept elaborated with Herrenknecht Formwork proved its worth and has been implemented consistently. Photo: FVD Studio Working line and segment pre-storage – state-of-the-art technology in a very confined space in the segment production factory. The carousel system with 40 moulds moving on a production line and three curing lines has been continuously adapted to the tunnelling speed of the TBM and the resulting daily concrete segment requirement. Smooth segment production has also been supported by the tailor-made concrete supply system with longitudinal and transversal displacement of the concreting bucket as well as the automated finishing line. With 19,000 segments already produced and an equipment availability of 96% it is obvious that this team really deserves the title of world champion in producing concrete segments. For further information please contact Dipl.-Ing. (FH) Stefan Medel, Phone +49 7824 302 1401, [email protected]
© Copyright 2026 Paperzz