Update on MDs for wideband feedback system K. Li with contributions from H. Bartosik, J. Fox, W. Hofle, C. Rivetta, B. Salvant, O. Turgut LIU-SPS Coordination Meeting, 20 July, CERN MDs on wideband feedback system Summary: With the latest upgrades including increased kicker power and new firmware for multi bunch treatment the first 2 week MD was scheduled to set up and to test the new system. Studies were foreseen in single bunch and in multi bunch mode to demonstrate the capabilities of the wideband feedback system. Content: 1. Status 2. MD plans and accomplishments 3. Next steps 21/06/2016 LIU-SPS Coordination Meeting Status of the wideband feedback system 2 stripline kickers + 2 x 2 power amplifiers (250 W, 5 – 1000 MHz) 21/06/2016 “The Box” • 4 Gs/s digital processing system • Firmware for independent control of up to 64 bunches in any configuration (e.g. 32 doublets) LIU-SPS Coordination Meeting MD plans Stabilisation of e-cloud instability on multiple bunches of the high intensity scrubbing beam (4 batches) Stabilisation of TMCI-like instability on a single bunch Excite and damp measurements with intra-bunch motion • Weeks 25 & 26: • 2 dedicated MDs on bunch train (scrubbing beam Q20) • Several parallel MDs on single bunches (Q26) • Availability was not 100% 21/06/2016 LIU-SPS Coordination Meeting MD accomplishments • On the feedback side: • On the machine side: • Calibration and time alignment • Open loop measurements Mo 21/06/2016 We • Setting up the single beam for reproducible and controllable instabilities (Q26) Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • • • • • • On the machine side: Calibration and time alignment Open loop measurements Testing the multi-bunch firmware Discovering a bug in the firmware Being frustrated • Setting up the single beam for reproducible and controllable instabilities (Q26) • Tuning chromaticity, trying to linearize machine, optimizing transverse damper, reducing space charge… no reproducible instabilities • Being frustrated Headtail monitor was not working reliably Mo 21/06/2016 We Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • • • • • • • On the machine side: Calibration and time alignment Open loop measurements Testing the multi-bunch firmware Discovering a bug in the firmware Being frustrated Firmware operational for multi bunch treatment • First application of the wideband feedback system on a single batch of 72 bunches – successfully stabilized individual bunches Mo 21/06/2016 We • Setting up the single beam for reproducible and controllable instabilities (Q26) • Tuning chromaticity, trying to linearize machine, optimizing transverse damper, reducing space charge… no reproducible instabilities • Being frustrated Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • 4 batches of 72 bunches • Successful stabilization of last bunches in 4th batch Mo 21/06/2016 We • On the machine side: • Setting up the high intensity scrubbing beam for reproducible and controllable instabilities (Q20) • Tuning chromaticity resulted in vertical instability – however not e-cloud like, i.e. rather coupled bunch like Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • 4 batches of 72 bunches • Successful stabilization of last bunches in 4th batch Mo 21/06/2016 We • On the machine side: • Setting up the high intensity scrubbing beam for reproducible and controllable instabilities • Tuning chromaticity resulted in vertical instability – however not e-cloud like, i.e. rather coupled bunch like Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • On the machine side: • On Thursday night during the Poland-Portugal game we lowered the RF voltage fast and reproducible instability (Q26) • We left the beam for the feedback experts to perform open and closed-loop studies Headtail monitor operational Mo 21/06/2016 We Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • On the machine side: • On Thursday night during the Poland-Portugal game we lowered the RF voltage fast and reproducible instability (Q26) • We left the beam for the feedback experts to perform open and closed-loop studies Mo 21/06/2016 We Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • On the machine side: • Transients after injection saturate the feedback • We use the transverse damper to quickly remove the centroid motion • We are left with a mode-1 like pattern – rise time still too fast to handle by the system • Chroma and voltage were adjusted to lower the rise time successful mitigation of instability in presence transverse damper Mo 21/06/2016 We • On Thursday night during the Poland-Portugal game we lowered the RF voltage fast and reproducible instability (Q26) • We left the beam for the feedback experts to perform open and closed-loop studies Mo LIU-SPS Coordination Meeting Fr MD accomplishments • On the feedback side: • On the machine side: • Transients after injection saturate the feedback • We use the transverse damper to quickly remove the centroid motion • We are left with a mode-1 like pattern – rise time still too fast to handle by the system • Chroma and voltage were adjusted to lower the rise time successful mitigation of instability in presence transverse damper Mo 21/06/2016 We • On Thursday night during the Poland-Portugal game we lowered the RF voltage fast and reproducible instability • We left the beam for the feedback experts to perform open and closed-loop studies Mo LIU-SPS Coordination Meeting Fr Instrumentation • The Headtail Monitor is absolutely essential but most of the time was not fully operational (did not trigger, record, auto-load, read terminal input,…) – Who are we officially supposed to contact for support? • The LHC BPMs are important and needed for the multi-bunch studies • The transverse BQM was not used so far 21/06/2016 LIU-SPS Coordination Meeting Next steps • Bring data together • Schedule dedicated MDs to learn how to create the e-cloud instability • Schedule parallel MDs to better characterize and understand the nature of the observed bunch instability • Optimisation of the transverse damper • Other suggestions? 21/06/2016 LIU-SPS Coordination Meeting
© Copyright 2026 Paperzz