Case Study Trican Completion Solutions 3 Stage (12 Sleeve) i-Frac Cemented Completion Business Needs Trican was approached by our customer for a multistage fracturing installation. We presented a comprehensive service package with completion tools, cementing, fracture stimulation and coiled tubing. The job included a hybrid completion strategy, using Trican’s i-Frac sleeve (ball drop) technology for part of the job, and conventional plug-and-perf for the remainder, allowing for a comparison of the techniques. Trican Solution Trican’s i-Frac is a cost-effective, cemented in, ball drop activated, multistage frac sleeve solution. i-Frac’s unique design allows the operator to install multiple frac sleeves per stage for optimal stimulation, simulating a plug-and-perf operation. The i-Frac sleeves were used in the first three stages of the multistage frac, installed in a seven stage hybrid completion design. The job required 12 i-Frac sleeves run in hole, positioned in the target area of the formation, and cemented in. Trican’s i-Frac technology allows the operator to install multiple frac valves per stage for optimal stimulation, simulating a plug-and-perf operation, but with greater efficiency. During the fracture treatment, pressure was applied to activate the rupture disk sleeve installed at the toe of the wellbore, thereby establishing injection into the formation. For each sliding sleeve stage, a single activation (frac) ball was dropped to shift the i-Frac sleeve. Each i-Frac sleeve had the ports/nozzles sized to provide the desired limited entry effect for that particular stage. Pressure signatures on surface during the i-Frac stages indicated the frac balls had landed successfully, and the sleeves were activated to open, allowing stimulation fluid to enter the formation and initiate a fracture. The frac ball seating rate was approximately 2.4 m3/min, with acid pumped into the wellbore to significantly reduce the initiation pressure. Each stage had an average proppant pump rate of 12 m3/min (75 bpm), with a maximum rate of 13.2 m3/min (83 bpm) for the stages using i-Frac technology. A total of 130 tonnes (286,000 lb) of proppant were pumped for each stage, with no indication of erosion on the seats above. Once one stage was completed, the process was repeated with a larger frac ball for each subsequent stage. The use of the hybrid completion method provided a comparison of Trican’s i-Frac technology relative to the plug-and-perf method, and demonstrated the advantages offered by i-Frac. The stages completed with the i-Frac sleeves were pumped in nine hours, allowing for increased efficiency in comparison to the plug-and-perf method, which took a total of four days (one day for each stage). In addition to the increased efficiency, i-Frac’s reduced need for dedicated wireline and coiled tubing personnel, combined with a decrease in water required for the pump down of plugs, provided the customer with significant cost savings. Montney Limited Entry Ball Shifts Stage 1 70000 14 Slurry Rate (m3/min) 4 sleeves shifted open with 1 ball 60000 3 Pressure (kPa) 12 4 10 50000 40000 8 30000 6 20000 4 10000 2 0 55 56 57 58 59 60 61 62 63 64 Slurry Rate Pressure (kPa) 2 1 0 65 Time (min) Case Study Snapshot Date: February/March 2013 Project Area: Montney Formation, B.C. Canada Challenges: Multistage fracturing installation Trican Solution: Hybrid completion method using Trican’s i-Frac technology and plug-and-perf methods Results: Increased efficiency with more stages completed in less time using i-Frac technology Less water required for the pump down of plugs using the i-Frac technology, providing a cost saving to the customer Decreased need for dedicated wireline and coiled tubing personnel (normally associated with plug-and-perf operations), providing a cost saving to the customer Corporate Head Office Suite 2900, 645-7th Ave SW Calgary, AB, Canada T2P 4G8 P+1.403.266.0202 WTricanWellService.com Houston Office 7614 Bluff Point Drive Houston, TX, U.S. 77086 P+1.281.716.9194 WTricanWellService.com Norway Office Fabrikkveien 28 4033 Stavanger, Norway P +47 908 66 888 WTricanWellService.com 522/012015
© Copyright 2025 Paperzz