1. Module 3: Quantity Takeoff

Course 3: Module 3
1. Module 3: Quantity Takeoff
1.1 Module 3: Introduction
Notes:

Add a period at the end of each of the three objectives. KS: Fixed

Again, if the purpose of the page numbers is to help us locate the source of the
KS: Fixed(20-4-17)
feedback, then I would suggest changing the instruction to read, “Throughout the
course, there are feedback icons in the lower left corner of your screen. By clicking on
them, a dialog box will appear that allows you to provide feedback to the Training
Committee on that page. Along with your feedback, please include the number of the
page being referenced. At the end of the last module, there will also be an
opportunity to provide feedback on the entire course.” Remove the quotation marks
when adding to the course. KS: We have changed the functionality, page number
itself appears in feedback. No need to change the instruction.
KS: We have changed
the functionality, page number itself appears in feedback. No need to change the
instruction.(20-04-17)
1
1.2 What Quantity Takeoff Means
Notes:
1.3 Evolution of Project Quantification
Notes:

Add a period at the end of the first, second, third and fifth sentence/bullet point. KS:
Fixed
KS: Fixed(20-4-17)
2
1.4 Assignment of Quantity Takeoff Responsibilities
Notes:

Add a period at the end of item #1 and at the end of the second sentence of item #2. KS:
Fixed
KS: Fixed(20-4-17)
1.5 The Quantity Takeoff Form
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed
3
KS: Fixed(20-4-17)
1.6 Completing the Quantity Takeoff Form
Notes:
1.7 Completing the Quantity Takeoff Form (cont’d)
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed
4
KS: Fixed(20-4-17)
1.8 Completing the Quantity Takeoff Form (cont’d)
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed
1.9 Degree of Complexity
Notes:
5
KS: Fixed(20-4-17)
1.10 Elements of A Complete Description
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed(20-4-17)
1.11 Quantity Takeoff by Specification Division
Notes:

Add a period at the end of each sentence/bullet point except for the third one.
KS: Fixed
KS: Fixed(20-4-17)
6
1.12 Division 01000: General Requirements
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed
KS: Fixed(20-4-17)
1.13 Division 01000: General Requirements (cont’d)
(FYI. This section was left out of your original document.)
Notes:

Add a period at the end of each of the three sentences/bullet points. KS: Fixed KS:
Fixed(20-4-17)
7
1.13 Division 02000: Sitework
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed(20-4-17)
1.14 Division 03000: Concrete
Notes:

Add a period at the end of only the very last complete sentence. KS: Fixed KS:
Fixed(20-4-17)
8
1.15 Division 04000: Masonry
Notes:
1.16 Division 05000: Metals
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed
9
KS: Fixed (20-4-17)
1.17 Division 06000: Wood and Plastics
Notes:
1.18 Division 07000: Thermal and Moisture Protection
Notes:
10
1.19 Division 08000: Doors and Windows
Notes:
1.20 Division 09000: Finishes
Notes:

Add a period at the end of the second sentence/bullet point. KS: Fixed KS: Fixed (204-17)
11
1.21 Division 10000: Specialties
Notes:
1.22 Division 11000: Equipment
Notes:
12
1.23 Division 12000: Furniture
Notes:
1.24 Note Regarding Architectural-Related Specification Divisions
Notes:

Add a period at the end of the first, second, fourth and fifth sentences/bullet points.
KS: Fixed KS: Fixed (20-4-17)
13
1.25 Division 13000: Special Construction
Notes:

Add a period at the end of the first and second sentences/bullet points. KS: Fixed KS:
Fixed (20-4-17)
1.26 Division 14000: Conveyance
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17)
14
1.27 Division 15000: Plumbing and Mechanical
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17)
1.28 Division 16000: Electrical
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17)
15
1.29 Division 17000: Instrumentation & Control
Notes:

Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17)
1.31 Module Summary
Notes:
General Comments on Review Questions
Note:

Good fix on deleting the instruction that the learner could advance without answering
a question. However, is it possible to keep the little pop-up screen that tells you that
16
you have either answered correctly or incorrectly? KS: Fixed (20-4-
17)
1.32 Review
(Multiple Choice, 3 points, 1 attempt permitted)
Correct
Choice
Cost Estimating Template
X
Quantity Survey
Takeoff Template
Quantity Estimate
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
17
Notes:
Correct (Slide Layer)
Incorrect (Slide Layer)
1.33 Review
(True/False, 3 points, 1 attempt permitted)
18
Correct
Choice
X
True
False
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
Notes:
19
Correct (Slide Layer)
Incorrect (Slide Layer)
1.34 Review
(Multiple Choice, 3 points, 1 attempt permitted)
20
Correct
Choice
Unit Cost Development form
Detailed Cost Estimate
Cost Estimating Reference Manual
X
Project Manager
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
Notes:
Correct (Slide Layer)
21
Incorrect (Slide Layer)
1.35 Review
(True/False, 3 points, 1 attempt permitted)
Correct
Choice
True
X
False
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
22
Notes:
Correct (Slide Layer)
Incorrect (Slide Layer)
1.36 Review
(Multiple Choice, 3 points, 1 attempt permitted)
23
Correct
Choice
X
Division 11000: Equipment
Division 10000: Specialties
Division 13000: Special Construction
Division 15000: Plumbing & Mechanical
Division 02000: Sitework
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
Notes:
24
Correct (Slide Layer)
Incorrect (Slide Layer)
1.37 Review
(Multiple Choice, 3 points, 1 attempt permitted)
25
Correct
Choice
Recap Matrix
Unit Cost Development form
X
Detailed Cost Estimate
Project Summary
Unit Cost Development form and Detailed Cost Estimate
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
Notes:
Correct (Slide Layer)
26
Incorrect (Slide Layer)
1.38 Review
(True/False, 3 points, 1 attempt permitted)
Correct
Choice
X
True
False
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
27
Notes:
Correct (Slide Layer)
Incorrect (Slide Layer)
1.39 Review
(True/False, 3 points, 1 attempt permitted)
28
Correct
Choice
X
True
False
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
Notes:
29
Correct (Slide Layer)
Incorrect (Slide Layer)
1.40 Results Slide
(Results Slide, 0 points, 1 attempt permitted)
30
Results for
1.32 Review
1.33 Review
1.34 Review
1.35 Review
1.36 Review
1.37 Review
1.38 Review
1.39 Review
Result slide properties
Passing Score
75%
31
Success (Slide Layer)
Failure (Slide Layer)
2. Feedback
2.1 Objective_ Introduction
32
Notes:
2.2 What Quantity Takeoff Means
Notes:
2.3 Evolution of Project Quantification
Notes:
33
2.4 Assignment of Quantity Takeoff Responsibilities
Notes:
2.5 The Quantity Takeoff Form
Notes:
34
2.6 Completing the Quantity Takeoff Form
Notes:
2.7 Completing the Quantity Takeoff Form (cont’d)
Notes:
35
2.8 Completing the Quantity Takeoff Form (cont’d)
Notes:
2.9 Degree of Complexity
Notes:
36
2.10 Elements of A Complete Description
Notes:
2.11 Quantity Takeoff by Specification Division
Notes:
37
2.12 Division 01000: General Requirements
Notes:
2.13 Division 01000: General Requirements (cont’d)
Notes:
38
2.14 Division 02000: Sitework
Notes:
39