Course 3: Module 3 1. Module 3: Quantity Takeoff 1.1 Module 3: Introduction Notes: Add a period at the end of each of the three objectives. KS: Fixed Again, if the purpose of the page numbers is to help us locate the source of the KS: Fixed(20-4-17) feedback, then I would suggest changing the instruction to read, “Throughout the course, there are feedback icons in the lower left corner of your screen. By clicking on them, a dialog box will appear that allows you to provide feedback to the Training Committee on that page. Along with your feedback, please include the number of the page being referenced. At the end of the last module, there will also be an opportunity to provide feedback on the entire course.” Remove the quotation marks when adding to the course. KS: We have changed the functionality, page number itself appears in feedback. No need to change the instruction. KS: We have changed the functionality, page number itself appears in feedback. No need to change the instruction.(20-04-17) 1 1.2 What Quantity Takeoff Means Notes: 1.3 Evolution of Project Quantification Notes: Add a period at the end of the first, second, third and fifth sentence/bullet point. KS: Fixed KS: Fixed(20-4-17) 2 1.4 Assignment of Quantity Takeoff Responsibilities Notes: Add a period at the end of item #1 and at the end of the second sentence of item #2. KS: Fixed KS: Fixed(20-4-17) 1.5 The Quantity Takeoff Form Notes: Add a period at the end of each sentence/bullet point. KS: Fixed 3 KS: Fixed(20-4-17) 1.6 Completing the Quantity Takeoff Form Notes: 1.7 Completing the Quantity Takeoff Form (cont’d) Notes: Add a period at the end of each sentence/bullet point. KS: Fixed 4 KS: Fixed(20-4-17) 1.8 Completing the Quantity Takeoff Form (cont’d) Notes: Add a period at the end of each sentence/bullet point. KS: Fixed 1.9 Degree of Complexity Notes: 5 KS: Fixed(20-4-17) 1.10 Elements of A Complete Description Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed(20-4-17) 1.11 Quantity Takeoff by Specification Division Notes: Add a period at the end of each sentence/bullet point except for the third one. KS: Fixed KS: Fixed(20-4-17) 6 1.12 Division 01000: General Requirements Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed(20-4-17) 1.13 Division 01000: General Requirements (cont’d) (FYI. This section was left out of your original document.) Notes: Add a period at the end of each of the three sentences/bullet points. KS: Fixed KS: Fixed(20-4-17) 7 1.13 Division 02000: Sitework Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed(20-4-17) 1.14 Division 03000: Concrete Notes: Add a period at the end of only the very last complete sentence. KS: Fixed KS: Fixed(20-4-17) 8 1.15 Division 04000: Masonry Notes: 1.16 Division 05000: Metals Notes: Add a period at the end of each sentence/bullet point. KS: Fixed 9 KS: Fixed (20-4-17) 1.17 Division 06000: Wood and Plastics Notes: 1.18 Division 07000: Thermal and Moisture Protection Notes: 10 1.19 Division 08000: Doors and Windows Notes: 1.20 Division 09000: Finishes Notes: Add a period at the end of the second sentence/bullet point. KS: Fixed KS: Fixed (204-17) 11 1.21 Division 10000: Specialties Notes: 1.22 Division 11000: Equipment Notes: 12 1.23 Division 12000: Furniture Notes: 1.24 Note Regarding Architectural-Related Specification Divisions Notes: Add a period at the end of the first, second, fourth and fifth sentences/bullet points. KS: Fixed KS: Fixed (20-4-17) 13 1.25 Division 13000: Special Construction Notes: Add a period at the end of the first and second sentences/bullet points. KS: Fixed KS: Fixed (20-4-17) 1.26 Division 14000: Conveyance Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17) 14 1.27 Division 15000: Plumbing and Mechanical Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17) 1.28 Division 16000: Electrical Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17) 15 1.29 Division 17000: Instrumentation & Control Notes: Add a period at the end of each sentence/bullet point. KS: Fixed KS: Fixed (20-4-17) 1.31 Module Summary Notes: General Comments on Review Questions Note: Good fix on deleting the instruction that the learner could advance without answering a question. However, is it possible to keep the little pop-up screen that tells you that 16 you have either answered correctly or incorrectly? KS: Fixed (20-4- 17) 1.32 Review (Multiple Choice, 3 points, 1 attempt permitted) Correct Choice Cost Estimating Template X Quantity Survey Takeoff Template Quantity Estimate Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. 17 Notes: Correct (Slide Layer) Incorrect (Slide Layer) 1.33 Review (True/False, 3 points, 1 attempt permitted) 18 Correct Choice X True False Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. Notes: 19 Correct (Slide Layer) Incorrect (Slide Layer) 1.34 Review (Multiple Choice, 3 points, 1 attempt permitted) 20 Correct Choice Unit Cost Development form Detailed Cost Estimate Cost Estimating Reference Manual X Project Manager Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. Notes: Correct (Slide Layer) 21 Incorrect (Slide Layer) 1.35 Review (True/False, 3 points, 1 attempt permitted) Correct Choice True X False Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. 22 Notes: Correct (Slide Layer) Incorrect (Slide Layer) 1.36 Review (Multiple Choice, 3 points, 1 attempt permitted) 23 Correct Choice X Division 11000: Equipment Division 10000: Specialties Division 13000: Special Construction Division 15000: Plumbing & Mechanical Division 02000: Sitework Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. Notes: 24 Correct (Slide Layer) Incorrect (Slide Layer) 1.37 Review (Multiple Choice, 3 points, 1 attempt permitted) 25 Correct Choice Recap Matrix Unit Cost Development form X Detailed Cost Estimate Project Summary Unit Cost Development form and Detailed Cost Estimate Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. Notes: Correct (Slide Layer) 26 Incorrect (Slide Layer) 1.38 Review (True/False, 3 points, 1 attempt permitted) Correct Choice X True False Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. 27 Notes: Correct (Slide Layer) Incorrect (Slide Layer) 1.39 Review (True/False, 3 points, 1 attempt permitted) 28 Correct Choice X True False Feedback when correct: That's right! You selected the correct response. Feedback when incorrect: You did not select the correct response. Notes: 29 Correct (Slide Layer) Incorrect (Slide Layer) 1.40 Results Slide (Results Slide, 0 points, 1 attempt permitted) 30 Results for 1.32 Review 1.33 Review 1.34 Review 1.35 Review 1.36 Review 1.37 Review 1.38 Review 1.39 Review Result slide properties Passing Score 75% 31 Success (Slide Layer) Failure (Slide Layer) 2. Feedback 2.1 Objective_ Introduction 32 Notes: 2.2 What Quantity Takeoff Means Notes: 2.3 Evolution of Project Quantification Notes: 33 2.4 Assignment of Quantity Takeoff Responsibilities Notes: 2.5 The Quantity Takeoff Form Notes: 34 2.6 Completing the Quantity Takeoff Form Notes: 2.7 Completing the Quantity Takeoff Form (cont’d) Notes: 35 2.8 Completing the Quantity Takeoff Form (cont’d) Notes: 2.9 Degree of Complexity Notes: 36 2.10 Elements of A Complete Description Notes: 2.11 Quantity Takeoff by Specification Division Notes: 37 2.12 Division 01000: General Requirements Notes: 2.13 Division 01000: General Requirements (cont’d) Notes: 38 2.14 Division 02000: Sitework Notes: 39
© Copyright 2026 Paperzz