Sub-Task 12.4.1: Progress and Plans for Experimental Measurements Nicoleta Baboi, Liangliang Shi, Thomas Wamsat 18. December 2013 Aim > HOM-based beam diagnostics for the European XFEL 1. Beam phase in 1.3 GHz cavities 2. Beam position in 1.3 GHz cavities 3. Beam position in 3.9 GHz cavities > Previous experience and status 1. Proof-of-principle made New electronics from Samer Bou Habib (WUT/DESY) under lab tests Early next year to be tested in FLASH 2. Electronics from SLAC installed at 40 cavities in FLASH Proof-of-Principle; calibrated into beam position But the calibration is unstable → need study 3. Prototype electronics from FNAL has been tested at FLASH (4 cavities) Specs were defined (for FLASH/FNAL and XFEL/DESY electronics) Also calibration unstable → need study Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 2 FLASH European XFEL 1.3 GHz Cavities - Electronics installed in 40 cavities (SLAC/CEA/DESY) - Raw signals used for beam centering - EuCARD2: Unstable calibration (phase or even frequency drifts?) - Electronics under design, based on same frequency as for FLASH (WUT/DESY) 3.9 GHz Cavities Status and Plans for HOM-based Beam Position Monitoring (HOMBPM) - Theoretical and experimental studies (EuCARD: UROS, UMAN, DESY together with FNAL) - Defined specs for HOMBPM electronics (also for XFEL) - Electronics under construction (FNAL), to be installed and tested/commissioned this autumn - EuCARD2: Unstable calibration (same problem as for 1.3 GHz?) - Electronics under design, based on same frequency ranges as for FLASH (DESY) - But much more challenging: Task 12.4.1, DESY | 8 coupled cavities cf. 4 4.5 cf 1 MHz bunch frequency Different orientation of cavities - EuCARD2: Need significant theoretical and experimental studies EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 3 FLASH European XFEL 1.3 GHz Cavities - Proof-Of-Principle made (SLAC/CEA/DESY) - Electronics under design (same as for XFEL HOMBPM, WUT/DESY) - EuCARD2: experimental studies - Same as for FLASH 3.9 GHz Cavities Status and Plans for HOM-phase Beam Phase Monitoring - So far no isolated monopole mode identified, which could be used for phase monitoring - Theoretical (and experimental) studies (lower priority in EuCARD2) Task 12.4.1, DESY | - Same as for FLASH EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 4 Milestones and XFEL Schedule > Milestones Completed characterisation of HOMs in the 8-cavity XFEL 3HC module M24 Maybe delays: 3.9 GHz module expected towards end of 2014 Cold S21 measurements on XFEL modules performed First 1.3 GHz module expected middle of 2014 M24 > FLASH: 2014: only user run -> only parasitical measurements possible > XFEL-Injector commissioning planned to start in Spring 2015 Start measurements with beam (probably only parasitical) Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 5 PhD work > Personal status: September-December 2013: mainly for literature study. Joined two schools: 1. Joint US-CERN-Japan-Russia International Accelerator School at Shizuoka, Japan, October 23-31, 2013.(Mainly focused on general accelerator physics: basic beam dynamics, storage ring, insertion devices etc. ) 2. Eighth International Accelerator School for Linear Colliders, Antalya, Turkey, Dec 4-16,2013.(Mainly focused on accelerator technology: room temperature RF, superconducting RF, LLRF&HPRF etc.) Self study and discussion Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 6 DOOCS Courtesy of DESY Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 7 Plan > To find out the reason for calibration instability Beam Position--taking data at FLASH(1.3 GHz cavity) including 35 cavities at both HOM ports and all BPMs along the linac. 3.9 GHz cavity electronics will come soon from Fermilab. Beam Phase– electronics will be ready soon for 1.3GHz cavity (XFEL) from WUT/DESY. It gives 1.3, 2.4 GHz for beam phase monitoring and 1.7 for position monitoring. For both position and phase measurements, the challenging part is 3.9 module (8 cavities) for XFEL. Data will be analyzed first with SVD method. Spring of 2015, the XFEL will start operation including (5 1.3GHz modules and one 3.9 GHz module) Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 8 Look for calibration instability > Data from ACC1 cavity3, date:18 Nov,2013 Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 9 Distinguished Performance Award at the LC School Task 12.4.1, DESY | EuCARD2 Task12.4 Online-Meeting | 18 Dec. 2013 | Page 10
© Copyright 2026 Paperzz