SECTION 01771 CONTRACT RECORD DOCUMENTS The following language shall be included minimally in this specification section and supplemental to language normally supplied by the architect. The architect is to modify and/or expand the language as appropriate to the project. 01771 CONTRACT RECORD DOCUMENTS PART 1 – GENERAL 1.1 SUMMARY A. This Section includes requirements for Contract Record Documents required prior to closeout, including, but not limited to, the following: 1. As-Built/Mark-Up Documents. 2. Operation and Maintenance Manual. 3. Guarantee 1.2 AS-BUILT/MARK-UP RECORD DOCUMENTS A. As-Built/Mark-Up Drawings: Maintain one set of full size hard copy set of Contract Plans at the site dedicated for use as an As-Built/Mark-Up Set. Produce and deliver one hard copy and one set of CAD files of As-Built/Mark-Up Drawings for the Owner’s review and approval. Submit final approved hard copy and CAD files of As-Built/Mark-Up record documents at substantial completion. CAD files shall conform to the Brown University CAD Deliverable Guidelines. Survey work shall conform to Brown University Survey Control Standards. Brown University Survey Control Standards and CAD deliverable Guidelines are available on-line as part of the Brown Construction Standards/General Requirements at www.brown.edu/Facilities/Facilities_Management. 1. Mark up plans as construction progresses and maintain continuously during the project. 2. Maintain the As-Built/Mark-Up Set available for review by the Architect, Owner, and Owner’s representatives. 3. Failure to maintain accurate as-built mark-ups will constitute sufficient justification for withholding payments to the Contractor. 4. The corrections on the As-Built/Mark-Up set shall be incorporated into original contract plan CAD files for final delivery to the Owner. 5. The plans shall be marked to show deviations in actual construction from the contract drawings. Deviations shall be shown in the same general detail utilized in the contract drawings. The drawings shall show the following information, but not be limited to: BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 1 SECTION 01771 CONTRACT RECORD DOCUMENTS a. Locations and descriptions of any utilities constructed or located within the construction limits. Provide survey point numbers on the plans for reference. b. Locations and dimensions of changes within the facility. c. Changes in grade, alignment, location, elevations, details, and dimensions of all work including facilities, structures, roads and utilities. d. Incorporate approved sketch (SK) drawings. e. Where the contract drawings show options, show only the option used in construction 1.3 OPERATION AND MAINTENANCE MANUAL A. Assemble a complete set of Operation and Maintenance (O&M) Manual indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. The O&M Manual shall be submitted in threering binders with type written labels, table of contents, and section dividers. Manual shall be organized sequentially utilizing the Construction Specification Institute (CSI) 16 Division numbering/schedule. B. Produce and submit one draft O&M Manual to the Maintenance Programs Manager four (4) weeks before Substantial Completion or after the last submittal is approved for review and comment. The format and draft manual must be approved prior to final submission. C. Submit final approved O&M Manual prior to Substantial completion. Final submission shall include three hard copies and one electronic copy. The electronic copy shall be in a format approved by the Brown University Project Manager. D. The manual is to include, but is not limited to the following minimum requirements (additional requirements for the O&M may be found in the Specifications): 1. Label the outside of binder with the Facility Name and Project Title 2. Table of Contents 3. Emergency contact list with contact names and twenty-four (24) hours contact information for use during the guarantee / maintenance period BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 2 SECTION 01771 CONTRACT RECORD DOCUMENTS 4. Project directory with contact information for Owner’s Representative, Architect, design sub-consultants such as mechanical and electrical engineers, Contractor, Subcontractors and vendors. Include firm name, contact names, addresses and phone numbers 5. Summary of the scope of work of the project including any changes 6. Sequence of Operations. Description of how systems work. 7. Schedule summary including start date, completion date, and start and end date of the project Guarantee. 8. Copy of Certificate of Occupancy (if applicable) 9. Copy of the executed Certificate of Substantial Completion (if applicable) 10. Contractor’s project guarantee letter 11. Subcontractor guarantee letters 12. Special guarantees and warranties such as roofing, waterproofing, windows and doors as applicable. 13. Final as-built finish schedule, keyed to reduced size floor plans. One Line diagrams (11x17) to be submitted for all applicable areas (Electrical, Mechanical, HVAC, Plumbing, Fire Alarm & Controls). One Line diagrams Valve Lists and Charts to be framed and installed in appropriate areas. 14. Instructions, wiring diagrams, maintenance requirements, maintenance agreements, lubrication schedules, flow diagrams, valve charts, filter schedules, light bulb replacement schedule and other important information arranged by CSI format (follow the specification table of contents). 15. Complete electronic format of the Building Equipment Templates Excel for all new equipment. Completed forms are to be included in the appropriate O&M Manual section(s). Coordinate with the Project Manager when manual forms are to be submitted in lieu of electronic forms. The template, entitled “Building Input Data” is available in electronic format via the Brown BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 3 SECTION 01771 CONTRACT RECORD DOCUMENTS University web site as part of the Brown University Construction Standards, Division 00, located at www.Brown.edu/Facilities/Facilities_Management/. 16. Equipment performance test results, including Balancing Report, are required in the O & M Manual. 17. Provide required training to the Operations department once the O&M Manuals have been approved. 18. Project Turnover to Operations Department: At the time of Substantial Completion, the Contractor shall coordinate with the Brown University Project Manager to schedule a project turnover meeting. This meeting shall include the Brown University Project Manager, Contractor, Sub-Contractors, Architect/Engineers (if applicable), Brown Operations Trades representatives and Brown Engineering. At the meeting, an overview of the project will be followed via a power point presentation to be initiated by brown University and completed by the Contractor. 1.4 GUARANTEE A. At substantial completion of all work as certified by the Owner and Architect/Engineer, the Contractor shall deliver a Letter of Guarantee to the Owner. This guarantee certifies that the Contractor shall promptly replace or repair any defects in equipment, materials or workmanship that becomes apparent within one (1) year from the date of substantial completion. B. The guarantee shall include repairs and corrections to pipe covering, paint, woodwork, or any other material and equipment caused to be imperfect due to defective workmanship or materials. All direct and consequential repairs shall be entirely at the expense of the Contractor. C. Additional manufacturers' warranties shall be supplementary to this guarantee. D. TWENTY-FOUR (24) HOUR SERVICE: The Contractor shall provide a telephone number that the Owner may call on a twenty-four (24) hour-per-day basis to receive immediate repairs and service, during the Guarantee period. If the Owner is unable to contact the Contractor to obtain service, the Owner shall arrange for service from another service provider or University employees and shall charge the expenses to the Contractor. The BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 4 SECTION 01771 CONTRACT RECORD DOCUMENTS University shall expect prompt payment. During the course of construction, the Contractor shall supply a telephone number that the Owner may call on a twenty-four (24) hour-per-day basis for emergency repairs or service made necessary because of Contract work in progress. Coordinate with the Project Manager to complete and file with Facilities Service Response Center the Emergency Procedure Form located at the end of this Section. The form can be found electronically via the Brown University web site as part of the Brown University Construction Standards/Division 00, www.Brown.edu/Facilities/Facilities_Management/. BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 5 SECTION 01771 CONTRACT RECORD DOCUMENTS BUILDING INPUT DATA This form must be filled out and given to Preventative Maintance Coordinator Preparer: Date: Contractor/Engineer Performing Work: EQUIPMENT INSTALLED Building: Address: Equipment Name and/or Identification: Room Location: Service: Manufacturer: Model #: Serial #: Volts / Phase / Hz: Date Installed: Warranty Expiration Date: Area / Perimeter Served: EQUIPMENT REMOVED Equipment name and/or Identification: Manufacturer: Model #: Serial #: Date Removed / Disposed: PERTINENT INFORMATION REQUIRED SIZE / PART NUMBER QUANTITY DESCRIPTION Air Filters (Pre/Finals) Req: DESIGN R.P.M: G.P.M: C.F.M.: Ampheres: EWT: LWT: EAT: LAT: BTU / Hr.: MBH: ACTUAL ACTUAL Horsepower: Fuel (Gas/Oil:) Refrigerant Type: Refrigerant Charge (Qty:) Boiler Horsepower: Discharge Head in Feet: V-Belts (Part # / Qty:) Mechanical Coupling Part #: Mechanical Seal Part #: Static Pressure: Comments: Signature: BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 6 SECTION 01771 CONTRACT RECORD DOCUMENTS EMERGENCY PROCEDURE BROWN UNIVERSITY Enter project description and building name here This sheet is your reference for immediate access to the people and vendors that made this project happen. However, in case of emergency, please call the following: 1) # Name & Title Mobile # Home or or 2) If the above are unreachable, call enter contact name and number for someone that can be reached any time. 3) Below is a list of subcontractors for this project. You are encouraged to call them directly when appropriate for immediate resolution. Most Important Emergency #s: HVAC Sub: Main #: # Main 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: Electrical: Main #: 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: Plumbing: Main #: # Main 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 7 SECTION 01771 CONTRACT RECORD DOCUMENTS Fire Protection: Main #: 24 hr. S Contact: 24 hr. #: # 24 service hr. Service Main # Title: Cell: Email: Security: Main #: # Main 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: Telcom: Main #: 24 hr. S Contact: 24 hr. #: # 24 service hr. Service Main # Title: Cell: Email: Other Subcontractors: Name: Main #: 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: Name: Main #: 24 hr. S Contact: 24 hr. service #: Main # Title: Cell: Email: END OF SECTION 01771 BROWN UNIVERSITY CONTRACT DOCUMENTS FACILITIES MANAGEMENT PAGE 8
© Copyright 2025 Paperzz