Now

nervous
or
LFL
or
disaggregation?
nervous
In management science, a
condition in which a small
change to input data can
create major revisions to
the conclusions suggested
by a particular technique.
Click here for Hint
nervous
or
time bucket
or
lead time?
lead time
Any delay between
requesting a product and
receiving it.
Click here for Hint
dynamic
or
heuristic
or
optimization?
heuristic
A procedure to develop a
good solution to a problem,
but cannot guarantee
identification of the best
solution.
Click here for Hint
ending inventory
time bucket?
or
beginning inventory
ending inventory
The level of inventory as
measured at the conclusion
of a particular time period.
This level is assumed to be
the beginning inventory of
the next time period.
Click here for Hint
or
infinite loading
or
finite loading
or
MRP?
infinite loading
A scheduling approach that
ignores capacity constraints.
Click here for Hint
planned order receipts or aggregation
planned order releases?
or
planned order releases
A schedule of the ordering
of a particular item within a
planning horizon, to supply
its gross requirements over
that same time interval.
Click here for Hint
WIP
or
raw materials
or
beginning inventory?
raw materials
Inventory brought in from
outside the system.
Click here for Hint
time bucket
or
time fence
or
planning horizon?
time bucket
The smallest interval of
time used in planning, such
as hourly, daily, or weekly.
Click here for Hint
planned order receipts or aggregation
planned order releases?
or
planned order receipts
A schedule of the arrival of
a particular item within a
planning horizon, to supply
its gross requirements over
that same time interval.
Click here for Hint
finite loading
or
infinite loading
or
MRPII?
finite loading
A scheduling approach that
recognizes capacity
constraints.
Click here for Hint
MCP rate
or
MPS
or
level production strategy?
minimum constant
production (MCP) rate
The lowest speed of perfectly
level production that will not
produce any shortages within a
demand forecast.
Click here for Hint
raw materials or dependent demand
independent demand?
or
independent demand
Requirements for an item
from outside the system,
also known as customer
demand.
Click here for Hint
average inventory
finished goods?
or
ending inventory
finished goods
Inventory awaiting sale to
consumers.
Click here for Hint
or
time bucket
or
time fence
or
planning horizon?
time fence
A point in time specified by
a policy to protect an MPS
from near-term changes,
dividing the planning
horizon into shorter intervals
with varying levels of
protection.
Click here for Hint
efficiency
or
utilization
or
dynamic?
utilization
Percent of design capacity
in use.
Click here for Hint
time fence or time bucket
natural planning horizon?
or
natural planning horizon
A point of time within a forecast
where aggregate demand
dictates the minimum level
production rate necessary to
fulfill all demand specified by
that forecast.
Click here for Hint
subcontract
or
parent
or
finite loading?
subcontract
To engage a third party in
the provision of value to a
customer.
Click here for Hint
MRP
or
ERP
or
chase demand strategy?
chase demand strategy
Aggregate planning
approach that relies on
changing capacity to
match demand.
Click here for Hint
MRP
or
MRPII
or
ERP?
material requirements
planning (MRP)
A technique for scheduling
the production of multiple
items related by both
independent and dependent
demand.
Click here for Hint
finished goods
or
parent
or
ending inventory?
parent
An item created from one or
more other items, known as its
children.
Click here for Hint
ending inventory
or
finished goods
or
WIP?
work-in-process (WIP)
Inventory resulting from
transformation of raw
materials but not yet ready
for sale to consumers.
Click here for Hint
infinite loading
or
dynamic
or
planning horizon?
dynamic
Actively and continuously
changing.
Click here for Hint
backward scheduling
time bucket?
or
optimization
or
backward scheduling
Starting an activity so it will
finish on its deadline.
Click here for Hint
MPS
or
LFL
or
MRP?
lot-for-lot (LFL)
An ordering policy in which
orders are sized to match
individual demands exactly,
theoretically accumulating
no inventory.
Click here for Hint
optimization
stockpiling?
or
level production strategy
stockpiling
Producing or securing goods
in advance of demand,
building up substantial
inventory.
Click here for Hint
or
heuristic or aggregate planning
aggregation ?
or
aggregate planning
Medium-term tactical
capacity planning in
response to changing
demand.
Click here for Hint
backflushing
or
dynamic
or
efficiency?
efficiency
Percent of a resource in
productive use.
Click here for Hint
level demand strategy or MRP
level production strategy?
or
level production strategy
Aggregate planning approach
that relies on fixed capacity
despite changing demand.
Click here for Hint
MPS
or
level demand strategy
or
MRPII?
master production schedule
A statement of independent demand
for all inventory items in an MRP
system.
Click here for Hint
WIP or bill of materials or
product structure diagram?
bill of materials
A description of all raw
materials and intermediate
assemblies required to create
a finished product.
Click here for Hint
bill of materials
dynamic?
or
disaggregation
or
disaggregation
Translation of an aggregated
value into smaller individual
estimates corresponding to
specific products.
Click here for Hint
MRP
or
MRPII
or
ERP?
manufacturing resource
planning (MRPII)
A broader information system
embedding MRP logic in a set of
modules that integrate input
from other areas of the
organizations and enforce relevant
capacity constraints on the
development of schedules.
Click here for Hint
level demand strategy
or
MRP
or
MRPII?
level demand strategy
Aggregate planning approach
that relies on influencing
demand to match capacity.
Click here for Hint
child
or
lead time
or
time bucket?
child
An item required for immediate
transformation into another
item, known as its parent.
Click here for Hint
parent
or
MRP
or
dependent demand?
dependent demand
Requirements for child items;
also known as component
demand.
Click here for Hint
heuristic or aggregate planning
aggregation ?
aggregation
To combine the creation
of many similar products
into one relevant measure
of activity for the
organization.
Click here for Hint
or
average inventory
ERP?
or
beginning inventory
beginning inventory
The level of inventory as
measured at the beginning
of a particular time period.
This level is assumed to be
the ending inventory of the
previous time period.
Click here for Hint
or
MCP rate
or
holding costs
or
aggregation?
holding costs
Variable costs associated
with having inventory.
Click here for Hint
backflushing
or
average inventory
or
MRP?
backflushing
Determining the overall
inventory requirements of a
finished good by combining
information on amount of the
good produced with the
requirements information in its
bill of materials.
Click here for Hint
average inventory
ending inventory?
or
gross requirement
average inventory
The average of the beginning
and the ending inventory of a
particular time period.
Click here for Hint
or
heuristic
or
ERP
or
optimization?
optimization
Identification of the best
alternative.
Click here for Hint
ERP
or
MRPor MRPII?
enterprise resource
planning (ERP)
A strategic information system
that integrates all functional
areas of an organization.
Click here for Hint
bill of materials or Gantt chart
product structure diagram?
or
product structure diagram
A particularly visual format for a
bill of materials, in which parent/
child relationships among
inventory items are illustrated as
a network of connected shapes.
Click here for Hint
MPS or product structure diagram
Gantt chart?
or
Gantt chart
A scheduling diagram that
illustrates activities across a
horizontal timeline.
Click here for Hint
planning horizon
or
time fence
or
time bucket?
planning horizon
The farthest point in
the future considered in
decision making.
Click here for Hint
capacity cushion
or
WIP
or
stockpiling?
capacity cushion
Largely idle capacity
maintained beyond the
expected load level of a
system, often to absorb
unexpected demand.
Click here for Hint
gross requirements or LFL
dependent demand?
or
gross requirements
The combined, overall
demand for an item.
Click here for Hint
freezing
or
MRP
or
time fence?
freezing
In planning, a policy that
does not allow changes to
the MPS within a protected
interval.
Click here for Hint