DRAFT PLANNING BRIEF FOR THE MIXED USE DEVELOPMENT (EMPLOYMENT, TOURISM & HOUSING) OF NEWBURGH, QUAYSIDE MAY 2004 DRAFT This brief seeks to ensure that the redevelopment of this prominent and sensitive site in Newburgh is well structured, appropriate to its surroundings and makes a positive contribution to the town and indeed the entire area. Many sites located within towns and settlements have been developed with little appreciation for their landscape setting or the character of the existing settlement. In this particular instance, there is a requirement to deliver a mixed use development of employment (possibly tourism related) and housing to a maximum of 15 units. Newburgh commands a unique location within Aberdeenshire and the site sits alongside an estuary of international environmental importance and immense local significance. Developers must have regard to the contents of this Brief in preparing their scheme. Where differences do occur, justification by the developer is required. 1. Purpose The purpose of this brief is to provide advice on how this sensitive site should be developed, taking account of the relevant planning and design policies and other available guidance. The opportunity to redevelop the Quayside and remove the current stock of dilapidated buildings must be taken when a suitable development proposal arises; this brief aims to facilitate this. A number of relevant development plan policies require to be satisfied, namely: NEST Policy 1 Policy 6 Policy 9 Policy 11 Policy 13 Policy 19 Policy 21 Policy 22 Finalised ALPEnv\1 Env\2 Env\4 Env\6 Hou\2 Hou\13 Emp\1 Emp\8 Emp\9 Inf\2 Inf\3 Inf\4 Gen\2 Gen\3 Employment Land Tourism Housing Allocations: 2006-2010 General Housing Considerations Developer Contributions Wildlife, Landscape and Land Resources Design Water Management International Nature Conservation Sites National Nature Conservation Sites Biodiversity Coastal Development Future Housing Land 2006-2015 Public Open Space for Housing Allocated and Existing Employment Land Office Development Tourist Facilities and Accommodation Parking, Servicing and Accessibility Access for the Less Mobile Drainage and Water Standards The Layout, Siting & Design of New Development Developer Contributions DRAFT Gen\5 Gen\7 Gen\11 2. Landscaping Standards Contaminated Land Redevelopment and Mixed Use Areas Site Analysis A site analysis has been undertaken to identify the site’s main features and constraints. This is more than a site description; the following issues will determine the key site requirements to achieve a suitable development in this location. Map One: Site location within Newburgh 2.1 Location / setting / views The site is denoted as EmpB in the Finalised Aberdeenshire Local Plan. The site in its entirety extends to a little over 1ha and occupies the former quayside that is located to the north-east of the settlement overlooking the Ythan Estuary. To the north, east and south lies the tidal estuary, with the A975 creating the western boundary. Across this road lies the University of Aberdeen Culterty Field Station. The views from the site include the dunes of Forvie Sands across the estuary, agricultural land to the north and a mixture of traditional and modern residential elements of the village to the south. The exposed nature of the Quayside means views into the site are available from the north, south and east, with the existing buildings highly visible. 2.2 Contours / landform / direction of slope As a largely man-made structure, the Quayside is a purpose-built level area, created for a historic business use. Therefore, no slope is present. DRAFT 2.3 Main direction of wind-chill The exposed nature of this site means that the wind is a dominant feature, particularly in a south and easterly direction. Although slightly protected by the dune system across the estuary, the North Sea is very nearby. 2.4 Natural sun-traps The site will benefit from the exposed aspect to the east and south, however mature trees will shade part of the site when the sun lies low in the west. 2.5 Flooding / potential for flooding The site occupies the former Quayside, but no history of flooding is known. The defence of the perimeter is a key consideration to reduce the potential for flooding and must be therefore be preserved. 2.6 Burns / wetland /drainage No natural drainage features are present on site; a burn enters the estuary to the immediate south of the Quayside, but is free-draining and should have no impact on the site. SSSI’s / nature reserves / area’s of ecological diversity 2.7 The site itself has no such environmental designation. However, the Ythan Estuary, Meikle Loch and Sands of Forvie have between them the following status and thus development must not adversely affect these areas: 2.8 RAMSAR National Nature Reserve (NNR) Site of Special Scientific Interest (SSSI) Site of Interest to Natural Science (SINS) Special Area of Conservation (SAC) Site of Environmentally Sensitive Areas (SESA) Trees / hedges / boundaries There are few trees present on the site, a small number sit alongside the road by the entrance to the Quayside. No other natural features are to be found within the site boundary, with the Quayside edge forming three sides. Opposite the site, stand of mature trees are to be found, these form an impressive backdrop when looking west from the site. 2.9 Archaeological aspects The Quayside has a rich archaeological heritage and the mill building was listed for a time. With this in mind, developers should consult the council’s DRAFT Archaeology Service, as some form of recording may be necessary before redevelopment occurs. 2.10 Urban form or grain / density The site represents the northern limit of the village of Newburgh to the east of the A975. Surrounding land uses include the University Research Station and open farmland, with residential development located south toward the centre. Originally, development followed main routes and this has resulted in a linear pattern, with traditional properties along main roads. This has been added to with more recent pockets of housing and local authority housing along these routes and more recently still, a small number of housing developments of higher density. 2.11 Conservation Area’s / Listed Buildings There is no Conservation Area in Newburgh and no Listed Buildings are to be found in the immediate vicinity. 2.12 Other civic / attractive buildings There are no civic buildings of particular note in the immediate area, however Culterty House is an attractive residential property directly opposite the site. Also of note, as an example of innovative, contemporary design is the recent University of Aberdeen building on the site opposite. 2.13 Other elements that give the site character The site is dominated by the Ythan Estuary, the exposed position and the views toward the dunes opposite. Mature landscaping is to be found opposite the site in the grounds of Culterty House. 2.14 Known hazards The quayside has been adapted for several uses over its lifetime, most recently being largely used as a garage and vehicle storage yard. This use, and former uses may have resulted in contamination and the area is identified as having this potential. A thorough investigation would therefore be necessary. 2.15 Location or direction of local services Most local services are to be found within the village to the south of the site. Within a short walking distance in the traditional centre is a small range of specialist shops and services, a church, village hall, primary school and two hotels. DRAFT 2.16 Rights of way / wayleaves / pedestrian desire lines No official right of way or wayleave is present on the site. However, access to the Estuary may be exercised by some who wish to get closer to this environment. 2.17 Existing road pattern The site comprises a mix of buildings to which vehicular access can be gained, but no adopted roads exist on site. The A975 runs along the western boundary and south into the village centre. Roads generally lead to open countryside or exist solely to serve more recent housing development. 2.18 Public transport A variety of bus services visit Newbugh on a daily basis en route to Aberdeen, Ellon and Peterhead. These vary in frequency, but an hourly service appears to be maintained throughout peak times. No other public transport serves that area. 2.19 Water supply and public drainage There is a water supply although foul drainage is currently constrained, pending the completion of works (scheduled for completion in 2005) to pump effluent to Balmedie. 2.20 Electricity / gas / renewable energy An electricity supply is readily available, gas supply will need to be investigated, but no provision for the harnessing of renewable energy currently exists. 2.21 ICT / broadband availability The exchange in Newburgh is currently only 54.5% (18 February 2004) towards the trigger level set by British Telecom before enablement for broadband can be considered. 2.22 Recent history of the site Historically, the Quayside was used as a point where freight was transferred from larger sea-faring ships, to boats capable of navigating the River Ythan. A mill was also to be found, a structure still visable today. More recently, some of the buildings have been adapted to create opportunities for small businesses whilst some lie derelict and the whole site has the appearance of neglect and disrepair. Redevelopment solutions have been proposed in the past, but none that fully accord with Council or community aspirations for the site or Newburgh as a whole. A relatively new storage building has been constructed, although this DRAFT appears difficult to let. Consequently, the site continues to deteriorate further and proves an unsightly entrance as one enters Newburgh from the north. 2.23 Land ownership Although a number of tenants are to be found renting business space, the site is in single ownership and appears capable of redevelopment, subject to the necessary planning permission. It is not currently known where the businesses currently on the site will relocate to. 3. Site Requirements The allocation of this site for a mixed use development of employment (possibly tourism related) and a maximum of 15 housing units provides the opportunity to greatly enhance the appearance of this area. As this site will create the northern gateway to Newburgh, a high standard of design is to be expected. Particular care must also be taken in ensuring that any proposed employment use is compatible with the neighbouring residential area. 3.1 General approach The Council wishes to encourage a development that adds to the quality of the built and natural environment in Newburgh. Each site must be treated separately as no two are the same and different challenges will exist. The Council wishes to encourage all new development in Aberdeenshire to add to the quality of the built and natural environment, whilst providing economic and social benefits wherever possible. These principles are carried forward in current work on development and sustainability indicators in the form of the Index 21 project, with new emphasis on ‘scoring’ proposed projects and determining their sustainability. There are six basic principles that prospective developers must consider: Working with the climate Energy efficiency Optimising resources Respect for users Respect for the site The Complete Approach 3.1.1 Response to climate There are two main issues when considering how a site should respond to the climate, these are: Solar considerations – the site occupies an exposed coastal location with existing south-facing potential to take advantage of any available solar radiation and maximise heating gain. Proposed buildings should therefore be sited and designed with this in mind. Wind considerations – the presence or absence of wind may have a greater impact than solar gain in the heating of buildings, particularly during colder months. Because of the nature of the site, DRAFT the conventional approach of using strategic planting may not be appropriate. The developer should therefore investigate means of ameliorating the impact of heat-loss from prevailing winds. 3.1.2 Energy efficiency Any development should be encouraged to increase the level of insulation within the walls and roof in an effort to minimise energy use. Another key consideration must be the choice of fuel, which can have an impact on the houses and their layout. The advice of ‘SCARF’ may be useful in this respect and any available grants can be discussed with them. 3.1.3 Resource efficiency The development of this site will require the construction of several small sections of road and car parking associated with the employment use(s); this must be minimised to that which is necessary. Where redevelopment of the site results in the demolition of existing buildings, consideration should be given to the reuse of materials where appropriate. The use of energy efficient, low maintenance and sustainable materials will be encouraged whenever practicable. 3.1.4 Social sustainability The site is outwith the historic core of Newburgh, but still well located to take advantage of the facilities the village has to offer and easy pedestrian access can be found to link the site to the village. The proposed development is of a scale that, if designed properly, should help create a small community and a sense of place. 3.1.5 Biodiversity The site is currently a jumble of run-down buildings that may provide shelter to a range of bird life and other species. However, otherwise the site itself has little value and it is not thought the loss of these buildings will have a significant impact on biodiversity. As part of the development, properly and sympathetically designed open space and strategic landscaping will be required; which will enhance the site once developed. The biodiversity of the Ythan Estuary is closely linked to its surroundings and every effort must be taken to ensure negative impacts do not occur. Many of these elements, and others, are described in detail in the document ‘Development Within Nature’ published by the former Gordon District Council and Robert Gordon University. 3.2 Distribution of land-uses DRAFT The key land-uses expected as a result of this development are, employment or business use, possibly a tourism facility, housing and open space. The correct mix and layout of these uses will significantly determine the success or otherwise of any development. 3.2.1 Employment / business use The provision of some form of employment use is explicit in Finalised ALP. This may take the form of a small office development or business centre, but regard must be paid to the neighbouring uses. The design and build quality of such a facility will be expected to be comparable with any housing element. 3.2.2 Tourism facility This requirement may be an integral part of the employment use or a ‘stand- alone’ facility. However, the uses to be found within the tourism element may be restricted to reduce any potential conflict with existing services to be found in the centre. This may include retail and catering facilities. 3.2.3 Housing The location of the 15 housing units proposed within the site is undetermined. There absence of mature trees or any natural features will allow a ‘blank canvas’ for a developer to create an attractive mixed use development. 3.2.4 Open space The provision of open space will depend upon the successful integration of each of the above elements. However, it is vital that any proposed open space has a clear purpose and function and is not simply an area left over or inconvenient for any other use. 3.2.5 Strategic landscaping There will be a requirement for a degree of strategic landscaping throughout the site, this must improve the appearance of the development and where possible provide shelter. The design and layout of the site must consider the surrounding landscape and new planting should therefore reflect this. There may be some ambiguity in terms of the stability of the man-made Quayside and this may be a determining factor in the type of species planted. The location, on the estuary, is also of significance as particular species may be more resilient in this environment. The advice of the Environment section of the Council may be sought on this matter. DRAFT 3.3 Access This site must be widely accessible by pedestrians and cyclists from the village. Other modes of transport to be considered are bus services and private vehicular traffic. 3.3.1 Footpath access into the site Footpath creation into the site is a key requirement to make the site as accessible as possible and to encourage use of modes of transport other than the private car. Pedestrian and cycle access should be provided at the southern point of the site, this should be independent from vehicular access. 3.3.2 Points of road access into the site Because of the mixed use nature of the site, more than one entrance is likely to be required. These will exit on to the A975, as shown in Map Two and the advice of the council’s T&I service should be sought. 3.3.3 General road layout requirements Within the site there will be no need for an extensive road network. Any developer should carefully consider an innovative approach to the residential road layout and incorporation of a ‘home zone’ style will be encouraged. 3.3.4 Traffic calming and other standards Traffic calming will be an integral part of the ‘home zone’ concept, where pedestrians are given priority over vehicles. This will be important throughout the site, but especially in the residential area and around any tourist facility. 3.3.5 Public transport needs There will be no additional need for public transport to serve the development. Bus halts serving north and south-bound routes are conveniently located near the site. 3.3.6 Emergency and service needs All emergency and service needs will be accommodated by internal access roads to be constructed in accordance with the requirements of the Fire Officer and the Council’s T&I service. 3.3.7 Access for all Public access to the housing will not generally be encouraged, with access mainly around any employment / tourism facility. Every effort should be made to make points as accessible as possible to a wide DRAFT range of potential users, including those with sensory or physical disabilities. Around the tourism facility it may be possible to improve public access by means of a boardwalk or similar path. Access to the waters edge is important as this is feature is likely to be the main attraction for any visitor. 3.3.8 Parking requirements The number of parking spaces contained within any new car parking must accord with the adopted ‘Car Parking Standards for Development Control’. Provision must be made for a number of visitor spaces and disabled allocations that should be located nearest to entrances. 3.4 Infrastructure and other services 3.4.1 Drainage The disposal of sewerage in Newburgh is embargoed until the existing Scottish Water system is upgraded and effluent can be pumped to Balmedie. It is hoped these works will be completed by the end of 2005. 3.4.2 Supply and distribution of water All water will be supplied from the nearest public water main. 3.4.3 Electricity This will be supplied from the nearest connection, check with service provider. 3.4.4 ICT / Broadband technology The exchange serving Newburgh has not reached the required level; this does not however prevent any necessary infrastructure being put in place for future use. 3.4.5 Lighting The provision of additional street lighting will be necessary due to the development of this site, however, this should be rationalised. An element of low-level lighting may be appropriate in some areas of public open space. Where security lighting is required around the employment or tourism facilities, this should not result in a nuisance to those who live nearby. 3.4.6 Education facilities DRAFT The development may add a small number of children to Newburgh Mathers Primary School where there is sufficient capacity to absorb any potential new pupils. Secondary school age pupils will travel to Ellon Academy where spaces also exist. Nursery facilities are also available in the village. 3.4.7 Community facilities Newburgh is relatively well served by community facilities, with two hotels, a village and church hall. A range of services are also to be found including a post office and general convenience shopping. The demand on these is unlikely to be significantly increased as a result of the development. 3.4.8 Library facilities A mobile library does visit Newburgh, although the nearest permanent facility is to be found in Balmedie or Ellon. 3.4.9 Maintenance The creation of areas of public open space within this development will result in these requiring adoption by the Landscape Services section of the Council. Evidence as to the arrangements made for the long-term maintenance of any paths, landscaped areas and open spaces will be required. 3.5 Developer Contributions The subject of developer contributions should be discussed with the Council’s Planning Gain Co-ordinator at the earliest opportunity. The agreement may contain contributions in cash or kind in line with policy requirements. The community have made suggestions that include speed warning signs and / or a northern gateway feature. 3.6 Design The site location, scale and proposed mix of uses offer an opportunity to create a development unlike the common, mundane approach to urban extensions. Due to the surrounding built environment, opportunities are available for traditional or innovative design. However, every care must be taken to ensure that both the layout and design are of the highest standards and quality materials are used throughout. 3.6.1 Building heights The existing mix of single-story vernacular buildings, the large mill and modern sheds give little context for the redevelopment of the site. Few structures are to be found in the immediate vicinity to add guidance. However, in this location, at the edge of the settlement and in a DRAFT prominent setting, the use of excessively high structures, similar in mass to the mill cannot be permitted. All buildings, whether residential, business or tourism must be designed and located to fit well within the site, respect the character of the surroundings and minimise intrusion on their neighbours. 3.6.2 Housing and space standards Houses on the site must meet, or preferably exceed, the current requirements as set out in the Local Plan, specifically Appendix 1 (The design of new development in Aberdeenshire) and Appendix 6 (Provision of public open space). 3.6.3 Design details The different elements required from the redevelopment of this site should display a degree of consistency. The Scottish Executive document ‘Designing Places: A Policy Statement for Scotland should be considered for the whole development and attention paid to PAN67 (Housing Quality) for the residential element. Further guidance on the design of new development is also contained in ALP Policy Gen\2 (The Layout, Siting & Design of New Development) and Appendix 1 (The Design of New Development in Aberdeenshire). The advice of Development Control should also be sought at the earliest opportunity. 4. Further Information Developers are encouraged to contact the Planning Service of Aberdeenshire Council at the earliest opportunity to discuss details of any application. Any application will be dealt with primarily by the Formartine Area Development Control Team, based at the following address: Planning & Building Control Neil Ross Square 45 Bridge Street Ellon AB41 9AA Tel. Fax. 01358 726429 01358 723548 Other useful numbers: Transportation & Infrastructure Environment Scottish Water SEPA SCARF 01467 620981 01467 628254 01224 675237 01224 424609 01224 213005 DRAFT
© Copyright 2026 Paperzz