Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 1 220kV PRIMARY EQUIPMENT (INCLUDING 220kV CABLE SEALING END COMPOUND) 1.1 Circuit breaker (3-ph) including structure and foundation 6 No. 0 0 0 0 1.2 Disconnector (3-ph) including low level structure and foundation 11 No. 0 0 0 0 1.3 Disconnector (3-ph) including mid level structure and foundation 1 No. 0 0 0 0 1.4 Disconnector / line earth switch (3-ph) including low level structure and foundation 2 No. 0 0 0 0 1.5 Dummy Disconnector (3-ph) including low level structure and foundation 3 No. 0 0 0 0 1.6 Dummy Disconnector (3-ph) including mid level structure and foundation 2 No. 0 0 0 0 1.7 Post type current transformer (1ph) including low level structure and foundation 15 No. 0 0 0 0 1.8 Post type current transformer (1ph) including mid level structure and foundation 3 No. 0 0 0 0 0 0 TOTAL PRICE ITEMS 1.1 - 1.8 Carried forward Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 1 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 1.9 Capacitive voltage transformer (1ph) including low level structure and foundation 8 No. 0 0 0 0 1.10 Surge arrester (1-ph) including low level structure and foundation 12 No. 0 0 0 0 1.11 Post insulator (1-ph) including low level structure and foundation 1 Lot 0 0 0 0 1.12 Post insulator (1-ph) including mid level structure and foundation 1 Lot 0 0 0 0 1.13 Cable sealing end (1-ph) including low level structure and foundation 12 No. 0 0 0 0 1.14 Strain insulator sets 1 Lot 0 0 0 0 1.15 Conductor / connections 1 Lot 0 0 0 0 1.16 Connectors / clamps 1 Lot 0 0 0 0 0 0 0 0 0 0 PRICE ITEMS 1.9 - 1.16 0 0 0 0 0 Brought forward 0 0 0 0 0 TOTAL PRICE ITEMS 1.1 - 1.16 0 0 0 0 0 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities Page 2 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 2 220kV PROTECTION SYSTEMS 2.1 220kV Feeder Protection SystemComplete 2 Lot 0 0 0 0 2.2 220kV Busbar Protection 1 Lot 0 0 0 0 2.3 Relay panel modifications 1 Lot 0 0 0 0 0 0 TOTAL PRICE ITEMS 2.1 - 2.3 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 3 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 3 SCS & ASSOCIATED EQUIPMENT 3.1 Hardware and software necessary to control and monitor the substation extension and modification 1 Lot 0 0 0 0 3.2 Interfaces to existing control systems 1 Lot 0 0 0 0 3.3 Incorporate new and modified substation equipment into the SCADA/EMS System at the NCC/RCC 1 Lot 0 0 0 0 3.4 Modifications to NCC/RCC databases and applications 1 Lot 0 0 0 0 3.5 Update of the Geographic Map 1 Lot 0 0 0 0 3.6 Modifications to NCC/RCC operator displays 1 Lot 0 0 0 0 3.7 Modifications to NCC/RCC mimic board 1 Lot 0 0 0 0 3.8 End to end testing of new controls, indications, analogue and alarms from the substation to the NCC/RCC 1 Lot 0 0 0 0 0 0 TOTAL PRICE ITEMS 3.1-3.8 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 4 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 4 LV CABLES 4.1 Auxiliary power and multicore cabling 1 Lot 0 0 0 0 4.2 Substation internal fibre optic cabling 1 Lot 0 0 0 0 4.3 Cabling installation hardware 1 Lot 0 0 0 0 0 0 TOTAL PRICE ITEMS 4.1-4.3 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 5 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 5 EARTHING & LIGHTNING PROTECTION (INCLUDING 220kV CABLE SEALING END COMPOUND) 5.1 Earthing and earth grid extension 1 Lot 0 0 0 0 5.2 Lightning protection extension 1 Lot 0 0 0 0 5.3 Cable sealing end compound earthing 1 Lot 0 0 0 0 0 0 TOTAL PRICE ITEMS 5.1-5.3 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 6 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 6 HV CABLES AND ACCESSORIES 6.1 Route verification, including collection of information about existing routes, cables, pipes, ducts and other underground services 6.2 6.3 6.4 Double circuit, three phase, single core, conductor, XLPE insulated cable including, but not limited to, cable laying, provision and laying of protective covers, PVC tapes and route markers. 3 4 Unit Estimated Quantity 8000 Metres (Route Length) Sectionalising joint including all necessary material connections and accessories 1 Lot Three phase disconnecting link box at terminal locations, bonding links and connection to substation earthing system 1 Lot Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Metres 8000 TOTAL PRICE ITEMS 6.1 - 6.4 Carried forward 5 FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 0 0 0 0 0 Page 7 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 6.5 6.6 6.7 6.8 6.9 6.10 2 Description Three phase link box for cross bonding, with SVL at minor sectionalising positions, with bonding leads, earthing box and connection to joint pit earthing system Three phase link box for cross bonding at major sectionalising positions, with bonding leads, earthing box and connection to joint pit earthing system Fibre optic pilot cables (48 fibres) with all accessories (including splice enclosures, OTBs etc.) and their installation in HDPE ducts alongside the power cables 3 4 Unit Estimated Quantity 1 1 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Lot Metres Soil investigation, excavation of trial pits, including testing of original and backfilling soil thermal characteristics 1 Lot Site survey including setting out and preparation of record drawings 1 Lot Site clearance and leveling, including removal of all surplus material and disposal to an approved location 1 Lot Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 6 Lot 8100 TOTAL PRICE ITEMS 6.5 - 6.10 Carried forward 5 FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 0 0 0 0 0 Page 8 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 6.11 Grading and landscaping on completion 6.12 Temporary works, including provision of access roads, temporary buildings and fences, works on protection of existing properties, etc. 1 Lot Trenches, including excavation, shuttering, protection of existing services, filling in and reinstatement 8000 Metres (Route Length) 6.13 6.14 6.15 Joint Bays, pits for link boxes, including excavation, shuttering, concrete works according to specification and reinstatement. Road crossing including road excavation, laying of PVC ducts filling in and road reinstatement according to local regulations 1 1 1 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh Lot FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Lot Lot TOTAL PRICE ITEMS 6.11 6.15 Carried forward 0 0 0 0 0 0 0 ITEMS 6.1 - 6.4 (Brought forward) ITEMS 6.5 - 6.10 (Brought forward) ITEMS 6.11 - 6.15 (Brought forward) TOTAL PRICE ITEMS 6.1 - 6.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities Page 9 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 2 Item No Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 7 CIVIL WORKS (INCLUDING 220kV CABLE SEALING END COMPOUND) 7.1 Site survey 1 Lot 0 0 0 0 7.2 Site clearance and earth works 1 Lot 0 0 0 0 7.3 Grading and landscaping on completion 1 Lot 0 0 0 0 7.4 Roadworks 1 Lot 0 0 0 0 7.5 Drainage system 1 Lot 0 0 0 0 7.6 Modification to substation boundary fences, security and gates 1 Lot 0 0 0 0 7.7 Cable sealing end compound security fence and gate 1 Lot 0 0 0 0 7.8 Cable sealing end compound anchor blocks 1 Lot 0 0 0 0 7.9 Temporary works 1 Lot 0 0 0 0 7.10 Surface chippings 1 Lot 0 0 0 0 7.11 New substation gatehouse 1 Lot 0 0 0 0 7.12 Cable trenching and ducts 1 Lot 0 0 0 0 0 0 TOTAL PRICE ITEMS 7.1 -7.12 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 10 of 11 Contract KETRACO/1/6/09 Lot 3 Mombasa – Nairobi Transmission Line SCHEDULE No. 1 PRICES AND ESTIMATED QUANTITIES FOR DEFINITE WORK EMBAKASI 220kV SUBSTATION 1 Item No 2 Description 3 4 Unit Estimated Quantity 5 6 CIF Local Manufacture FC KSh 7 8 9 Dock Dues and Inland Erection, Commissioning and Insurance Transport to Site KSh FC KSh FOREIGN CURRENCY (FC) =______________ LOCAL CURRENCY (KSh) = KENYAN SHILLINGS 10 11 12 13 Total Price for Estimated Quantity, Work Erected Complete Unit total FC KSh FC KSh 8 SITE TRANSPORT Provision as per Clause 1.31, of each vehicle for the duration of the contract, including regular driver/mechanic experienced in desert driving 8.1 Vehicle Type 1 2 each 0 0 0 0 8.2 Winch attachment for vehicles Type 1 2 per winch 0 0 0 0 8.3 Handheld short wave radio 3 per set 0 0 0 0 0 0 TOTAL PRICE ITEMS 8.1-8.3 Section VII – Forms and Procedures Part 1.2 – Price Schedules Bills of Quantities 0 0 0 0 0 Page 11 of 11
© Copyright 2026 Paperzz