Quote - Consort – Bruny Island Battery Trial

Phase 1 – Design: Quote template
Installer Logo to go here
Installation details
Name
Address
NMI
Installer details
Company name
Contact details
Installation summary
Battery Make / Model
Solar Panel make /
model / number / total
output (kW)
Inverter make / model
Switched loads
Total quote cost
Expected subsidy
Customer contribution
Expected yearly bill
impact
Expected install date
Page 1 of 6
Phase 1 – Design: Quote template
List of major parts
Item
Make/Model
Battery
Battery Inverter
Solar Inverter
Solar panels
Reposit Controller
Reposit meters
Switched load
contactors
Other hardware
Labour
Sub total
STC credit
Expected subsidy
Customer
contribution
Description of work performed
Quantity
Total cost
(inc. GST)
$
$
$
$
$
$
$
$
$
$
$
$
$
Exclusions
Page 2 of 6
Phase 1 – Design: Quote template
Solar system design
Location/design
Orientation and tilt of
panels
Efficiency loss due to
shading
Roof plan
[Insert picture]
Expected output
Month
January
February
March
April
May
June
July
August
September
October
November
December
Total
Expected yield (kWh)
Page 3 of 6
Phase 1 – Design: Quote template
Battery system design
Location/design
Battery location
Expected battery usage
/ day
Battery chemistry
Warranted cycles @
expected usage
Expected battery
lifetime
Location plan
[insert picture]
Controlled loads
Number of loads
1
Description
Rated capacity
(kW)
2
Description
Rated capacity
(kW)
Page 4 of 6
Phase 1 – Design: Quote template
Customer bill impacts
Current average bill
$
Current tariff
Proposed tariff
Expected average bill
$
Assumptions used
Page 5 of 6
Phase 1 – Design: Quote template
Assumptions and risks
Payment terms
Warranty information
5 year warranty
Page 6 of 6