BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity Technical Specification January 14th-15th 2014 Handling Engineering Group 2 Technical Specification • • • • Scope of the supply Delivery schedule Documentation Site activities January 14th-15th 2014 Handling Engineering Group 3 Scope of the Supply • • • • Following our planning, about 25 cranes are foreseen to be subject to intervention in the next 5 years Dismantling, refurbishment or replacement of obsolete EOT cranes as well as the supply, installation and commissioning of new ones Five years blanket purchase contract Definition of a catalogue of prices (IT3981_EN UPL) January 14th-15th 2014 Handling Engineering Group 4 Scope of the Supply Catalogue of prices is structured as follows: • • • Basic prices for interventions on cranes (A2 – F11) Prices for additional features (G1 – G18_F) Price for different contexts of installation (H1 – H4) January 14th-15th 2014 Handling Engineering Group 5 Scope of the Supply Crane A B C D E F Capacity [ton] 10 20 30 40 60 80 Span [mm] 16300 ± 3200 16000 ± 4000 20250 ± 5000 16500 ± 4000 13000 ± 3000 14500 ± 1500 Lifting Height [mm] 6000 ± 2000 7250 ± 2750 6600 ± 2000 10000 ± 4500 7000 ± 2500 12000 ± 4000 Hoisting speed [m/min] 5 - 10 5-8 5-8 8 - 10 6-8 6-8 Cross travel speed [m/min] 8 - 15 12 - 15 15 - 20 12 - 15 8 - 12 8 - 12 Long travel speed [m/min] 20 - 30 15 - 20 25 - 30 25 - 35 15 - 25 15 - 20 Installation height [mm] 7000 ± 2000 8000 ± 3000 9000 ± 3000 10500 ± 3500 6000 ± 3000 12000 ± 2000 Example crane PR 712 (SD4) PR 76 (bldg. 201) PR 68 (bldg. 167) PR 720 (UX85) PR 82 (bldg. 168) PR 725 (SX8) January 14th-15th 2014 Handling Engineering Group 6 Scope of the Supply Category of intervention Ref. section of Tech. spec. 1 Dismantling of hoist trolley 2.2.1 2 Dismantling of a EOT crane 2.2.2 3 Replacement of rails 2.2.3 4 Replacement of electrical feeding line 2.2.4 5 Replacement of frequency converters 2.2.5 6 Replacement of PLC system 2.2.6 7 Replacement of electrical plant 2.2.7 8 Replacement of long travel mechanisms 2.2.8 9 New hoist trolley 2.2.9 10 New EOT crane 2.2.10 11 Replacement of hoist mechanisms 2.2.11 January 14th-15th 2014 Handling Engineering Group 7 Scope of the Supply Representative EOT crane Category of intervention A B C D E F 2 1 3 3 3 1 Dismantling of hoist trolley 2 Dismantling of crane 1 1 0.5 2 0.5 0.5 3 Replacement of rails 0.25 0.25 0.25 0.25 0.25 0.25 4 Replacement of feeding line 3 5 3 5 2 3 5 Replacement of all frequency converters 1 1 1 1 1 1 6 Replacement of PLC system 1 1 1 1 1 1 7 Replacement of electric plant 1 1 1 1 8 Replacement of long travel mechanisms 1 1 1 9 New hoist trolley 10 New crane 11 Replacement of hoist mechanisms 3 January 14th-15th 2014 2 1 2 1 2 3 2 2 1 1 1 1 1 Handling Engineering Group 8 Scope of the Supply Additional Features 1 2 3 4 5 6 7 8 9 10 Replacement of cabin Lamp maintenance platform Motorized hook Fault diagnosis Safety zones Coupled operation Camera system Distance-assistance system Sway reduction Anti-collision system 11 Auxiliary hoist (fixed on trolley, 5 tons capacity, 10 m lifting height) Ref. section of Annex 1 3.4 3.7 3.8.5 4.21 4.22 4.23 4.24 4.25 4.26 8.6 - 15 Auxiliary hoist (sliding on a monorail 15 m long, 5 tons capacity, 10 m lifting height) Redundancy of all motors Redundancy of lifting motor and complete redundancy of horizontal drives Emergency brake 16 Double of the lifting height (respect to the highest value of the range) 17 18 Shaft crane (100 m of lifting height) Guide-rollers 12 13 14 January 14th-15th 2014 8.2 8.2 8.3 8.4 (only if increased lifting height exceeds 25 m) 8.4, 8.5 - Handling Engineering Group 9 Scope of the Supply Context of Installation Ref. section of Tech. spec. 1 Installation in surface building with space constraints 6.2 of this document 2 Installation in underground areas 6.3 of this document 3 Installation in radiation areas 6.4 of this document January 14th-15th 2014 Handling Engineering Group 10 Scope of the Supply • • Items will be ordered by the means of release orders Each order will be accompanied by a questionnaire specifying: Data of the crane subject to intervention Type of activity (refurbishment, replacement…) Additional features Context of installation • Contractor will be required to confirm the price January 14th-15th 2014 Handling Engineering Group 11 Scope of the Supply Example: Project type: Refurbishment Capacity: 40 ton Span: 20000 mm Lifting height: 28000 mm Hoisting speed: 8 m/min Cross travel speed: 15 m/min Long travel speed: 25 m/min Installation height: 11 m Length of rails: 40 m January 14th-15th 2014 Handling Engineering Group 12 Scope of the Supply Example: Items: Dismantling of hoist trolley → D1 Replacement of electrical plant → D7 Replacement of long travel mechanisms → D8 Supply of a new hoist trolley → D9 Replacement of electrical feeding line → D4 Double of the lifting height → G16_D Price: D1 + D7 + D8 + D9 + D4*40/50 + G16_D January 14th-15th 2014 Handling Engineering Group 13 Scope of the Supply • • • Prices for items which are not covered will be extrapolated from the catalogue of prices Negotiation before order No committment to order January 14th-15th 2014 Handling Engineering Group 14 Delivery Schedule Category of intervention Submission of design report (time after the release order) Delivery / installation (time after the release order) Acceptance tests at CERN / Completion of works (time after the release order) 1 Dismantling of Hoist Trolley - - 6 weeks 2 Dismantling of a EOT Crane - - 6 weeks 3 Replacement of Rails 2 weeks 1 month 2 months 4 Replacement of Electrical Feeding Line 2 weeks 1 month 2 months 5 Replacement of Frequency Converters 2 weeks 6 weeks 2 months 6 Replacement of PLC system 2 weeks 2 months 3 months 7 Replacement of Electrical Plant Replacement of Long Travel Mechanisms Supply of a New Hoist Trolley (capacity < 30 tons) Supply of a New Hoist Trolley (capacity ≥ 30 tons) Supply of a New EOT Crane (capacity < 30 tons) Supply of a New EOT Crane (capacity ≥ 30 tons) Replacement of Hoist Mechanisms 2 weeks 2 months 3 months 2 weeks 2 months 3 months 6 weeks 3 months 4 months 6 weeks 5 months 6 months 6 weeks 3 months 4 months 6 weeks 5 months 6 months 6 weeks 5 months 6 months 8 9 10 11 January 14th-15th 2014 Handling Engineering Group 15 Documentation January 14th-15th 2014 Handling Engineering Group 16 Documentation January 14th-15th 2014 Handling Engineering Group 17 Documentation January 14th-15th 2014 Handling Engineering Group 18 Documentation January 14th-15th 2014 Handling Engineering Group 19 Documentation January 14th-15th 2014 Handling Engineering Group 20 Site Activities January 14th-15th 2014 Handling Engineering Group 21 Site Activities January 14th-15th 2014 Handling Engineering Group 22 Site Activities January 14th-15th 2014 Handling Engineering Group 23 Site Activities January 14th-15th 2014 Handling Engineering Group 24 Site Activities January 14th-15th 2014 Handling Engineering Group 25
© Copyright 2026 Paperzz