INTACH SCHEDULE OF RATES FOR BUILDING CONSERVATION WORKS ARCHITECTURAL HERITAGE DIVISION INDIAN NATIONAL TRUST FOR ART AND CULTURAL HERITAGE 71, LODHI ESTATE NEWDELHI- 110003 PREFACE 1. INTACH Schedule of Rates includes the items required for Restoration and Renovation of Heritage Buildings with Rate Analysis. 2. Traditional Materials and Traditional techniques are followed for preparation of Rate Analysis for Restoration Works 3. Modern Materials and Techniques which are compatible with Heritage Buildings are included in the Schedule of Rates 4. Rate Analysis has been prepared based on method proposed in Rate Analysis of DSR and from the experiences of INTACH, Contractor and ASI Engineer 5. Try to include all Types of lime works in Mortars, Concrete, Plastering, Stone works, Water Proofing and Repair works in the items of SOR. 6. Since Traditional Construction Techniques consume more time and materials compare to Modern Techniques, 20 to 50 % of more quantity is considered for labor and wastage calculation depends upon the work. 7. The rates are as per prevailing market Rates and DSR 2013 rates . BASIC RATES The rates of Machinery are as per DSR 2013 and prevailing market rates 0.1 HIRE CHARGES OF PLANTS Code No Description Unit DSR 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day DSR 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne Day DSR 0006 Spray machine day DSR 0013 Machine for rubbing of floors day DSR 0080 Hire and running charges of drill machine up to 400 mm dia day M Rate day Pressure Pump M Rate day Hand operated mixer/Mechanical mixer 0.2 LABOUR The rates of labour are as per DSR 2013 and prevailing market rates DSR 0100 Bandhani day DSR 0101 Bhisti day DSR 0102 Blacksmith 1st Class day DSR 0111 carpenter day DSR 0113 Chowkidar day DSR 0114 Beldar day DSR 0115 Coolie day DSR 0123 Mason 1st class day DSR 0124 Mason (brick layer) 2nd class day DSR 0125 Mason (for plain stone work) 2nd class day DSR 0126 Mason (for ornamental stone work) 1 st class day Rate Rs. 800.00 1,500.00 250.00 350.00 7,500.00 1,000.00 800.00 328.00 328.00 393.00 297.00 297.00 297.00 297.00 393.00 361.00 361.00 393.00 DSR 0126 Extra labour for ornamental finish Mason (for ornamental stone work) 1 st class day 393.00 DSR 0127 DSR 0128 DSR 0131 DSR 0139 DSR 0155 M Rate M Rate Driver (for Road Roller, Concrete Mixer Truck etc.) Mate Painter Skilled Beldar (for floor rubbing etc.) Mason (Average) Conservator Designer for Arts day day day day day day day 393.00 328.00 361.00 328.00 377.00 1,650.00 1,000.00 0.3 MATERIAL The rates of Materials and machinery are as per DSR 2013 and prevailing market rates DSR 0286 Brick Aggregate 50mm DSR 0287 Brick Aggregate 40mm DSR 0293 Stone Aggregate 40mm DSR 0295 Stone Aggregate (Single size) : 20 mm nominal size DSR 0297 Stone Aggregate (Single size) : 20 mm nominal size DSR 0305 Bamboo Battens 25mm 2.5 M long DSR 0308 Bhusa DSR 0362 Brick Bats DSR 0367 Portland Cement DSR 0373 Cramp Gun metal 25x6x300 mm DSR 0771 Kerosene Oil DSR 0773 Unslaked lime DSR 0784 Marble dust Ready mixed pink or grey primer on wood work (hard and soft wood) having VOC DSR 0806 content less than 50 grams/ litre DSR 0811 Mud (dry) DSR 0859 Oil type wood preservative DSR 0874 Black colour dark shade pigment DSR 0875 Red oxide DSR 0982 coarse sand zone III DSR 0983 Fine Sand zone IV DSR 1002 Mild steel round bar 12 mm dia and below DSR 1007 Structural steel such as tees, angles channels and R.S. joists DSR 1010 Mild Steel Plates DSR 1024 Galvanised steel bolts & nuts DSR 1189 Second class teak wood in scantling DSR 1154 Through and bond stone DSR 1157 Stone for masonry work DSR 1159 Sand dust DSR 1160 Red sand stone block DSR 1161 White sand stone block DSR 1163 White sand stone slab 75 mm thick (un-dressed) DSR 1164 Red sand stone slab 40 mm thick (Indressed) DSR 1165 White sand stone slab 40 mm thick (Indressed) DSR 1166 Red sand stone slab 30 mm thick (Indressed) DSR 1168 Kota stone slab 20 mm to 25 mm thick (semi- polished) DSR 1169 Kota stone slab 25mm thick (rough chiseled) DSR 1174 Red sand stone slab 45 mm to 50 mm thick (un-dressed) DSR 1175 White sand stone slab 45 mm to 50 mm thick (un-dressed) DSR 1182 Surkhi DSR 1219 wire nails DSR 1220 wire mesh DSR 1235 Diesel oil DSR 1237 Cutting sand stone slab up to 50 mm thick by mechanical device DSR 1984 Common burnt clay F.P.S. (non modular) of bricks class designation 10 Cum Cum Cum Cum Cum Score Quintal Cum tonne Each Lit Quintal Cum lit 500.00 510.00 1,000.00 1,200.00 1,050.00 350.00 400.00 500.00 6,600.00 80.00 60.00 800.00 1,000.00 120.00 Cum lit Kg Cum Cum Cum quintal quintal Quintal Exch 1cum 100 nos Cum Cum 10cudm 10cudm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Cum Kg Sqm lit m 1000 nos. 60.00 80.00 55.00 75.00 1,120.00 650.00 4,500.00 4,650.00 4,700.00 12.00 66,000.00 1,200.00 700.00 1,000.00 65.00 70.00 300.00 190.00 215.00 130.00 357.00 210.00 172.00 225.00 700.00 60.00 45.00 48.63 9.00 4,800.00 DSR 2602 Common burnt clay F.P.S. (non modular) of bricks class designation 7.5 1000 Nos 4,800.00 DSR 2750 DSR 6001 8 mm thick Raj Nagar white (mirror polished of all shades) White marble slab Makrana second quality plain veined 18 mm thick Sqm Sqm 500.00 2,375.00 DSR 6007 DSR 6010 DSR 6019 DSR 7071 DSR 7266 DSR 7296 Sqm Sqm Sqm Sqm 1000 Nos. Sqm DSR 7850 DSR 8666 Pink marble slab plain 18 mm thick Udaypur green marble slab plain 18 mm thick Black Zebra marble slab plain 18 mm thick White marble Raj Nagar plain 18 mm thick upto 0.50 sqm area Pressed clay tiles 20mm thick 250x250 mm size Granite of any colour, 30 mm thick (slab area upto 0.50 sqm) Raj nagar plain white marble (table rubbed and polished) 18 mm thick (slab area more than 0.50 sqm) Agaria White marble slab plain 18 mm thick Stainless steel screws 25 mm x4 mm DSR 8737 Stainless steel wire guage (Grade-304) aperture 1.4 mm and 0.50 mm dia wire Sqm DSR 9999 M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate M Rate Sundries Laterite stone Heritage Floor Tile Heritage Skirting Tile Brick aggregate 25mm Brick aggregate 20mm Washing soap Alum Fuel Cost for running the miller 5 % crude oil by weight of lime Bonding Agent (Nitobond SBR) Polimer Grouting Machine Stone cutter machine Running cost for upkeep of mortar mill Tiles average size of 200mmx125mmx6mm Bamboo Battens 25mm 3.3 M long Rope Bricks Traditional Bricks Micro sand Burnt Earthern Pot Bond stone of size 450x200x50 Non Ionic Soap Lime stone of size 15"x9"x7" L.S Sqm Sqm Sqm Cum Cum Kg Kg lit Kg Lit Lit day day day 1000 nos No Kg No No Kg No No Lit No DSR 7453 750.00 825.00 650.00 770.00 12,150.00 2,300.00 Sqm 1,100.00 Sqm 100 nos 1,430.00 32.00 830.00 1.70 1,050.00 2,044.40 1,614.00 500.00 550.00 125.00 75.00 60.00 100.00 400.00 1,000.00 1,000.00 650.00 800.00 3,000.00 462.00 50.00 7.00 12.00 5.00 12.00 150.00 150.00 34.00 0.4 CARRIAGE CODES DSR 2201 DSR 2202 DSR 2203 DSR 2205 DSR 2206 DSR 2207 DSR 2208 DSR 2209 DSR 2215 DSR 2216 DSR 2260 DSR 2261 DSR 2264 DSR 2266 DSR 2267 DSR 2268 DSR 2342 Carriage of bricks Carriage of stone aggregate Carriage of coarse sand zone III Carriage of steels Carriage of stone aggregate 40 mm nominal size and above Carriage of brick tiles Carriage of lime Carriage of cement Carriage of Soling stone & masonry stone Carriage of stone blocks white & red sand stone & kota stone slab Carriage of Brick Aggregates Carriage of fine sand zone IV Carriage of rubbish Carriage of surkhi Carriage of sand dust Carriage of marble dust and/or marble chips Carriage of Solvent / Diesel. 0.5 DSR ITEMS Centering and shuttering including strutting, propping etc. and removal of form DSR 5.9.9. for Arches, domes, vaults up to 6 m span. DSR 3.8 Cement Mortar 1:3 (1 Cement: 3 Coarse Sand) DSR 3.18 Mud Mortar Demolishing lime concrete manually/ by mechanical means and disposal of DSR 15.1 material within 50 metres lead as per direction of Engineerin- charge. L.S Cum Cum tone Cum 1000 Nos Cum tonne Cum tonne Cum Cum Cum cum Cum cum Quintal 284.39 106.64 106.64 94.80 115.92 170.63 106.64 94.80 125.47 94.80 115.92 106.64 106.64 106.64 106.64 106.64 10.66 Sqm 1,006.65 Cum Cum 4,347.70 366.20 Cum 281.45 DSR 15.26 Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. Sqm 36.95 DSR 18.78 Making chases up to 7.5x7.5 cm in walls including making good and finishing with matching surface after housing G.I. pipe etc m 77.65 INTACH SOR S NO Description of Items 1. SITE CLEARANCE Clearance of debris around the heritage building by excavation upto depth 1.50mtr to 2.00 mtr carefully without damaging the buried architectural parts of the building and 1.1 collect all the intact parts at proper place for reuse at the time of restoration work as per direction of Engineer incharge. All kinds of soil Unit Rate in Rs Cum 434.95 1.2 Scientific debris to be done manually using sieve as per the direction of the conservation architect. All antiquities and historic remains to be classified and documentated photographically before numbering and storing them in the office Cum 594.12 1.3 Add extra for sorting lifting & stacking charges for architectural parts up to 50m lead. Cum 372.27 2.1 Removing of old sulphated lime wash/white or colour wash in multiple applications without causing damage to the surface below. Scrubbing (not by scraping which leaves surfaces scarred and scratched ) with bristle brushes and hot water ( Care to be taken if the surface is weak one it will break down). Hot water should be used if the limewash has Sqm an oil or tallow binder. Gentle cleaning with air abrasive tools can be used if the wall surface is not very week.The final clean will almost invariably have to be carried out by hand scrubbing and rinsed with clean water on completion. The work should be done under supervision of a trained conservator. 451.93 2.2 Removal of rust, existing coatings, mill scale, dirt, oil, grease, and other contaminants from steel sections using Micro sand with the help of pressure pump. from steel sections using Micro sand with the help of pressure pump Sqm q 293.33 Sqm 133.15 2. SURFACE CLEANING AND BONDING Removal of stains, dirt, blackening and other contaminants from Marble by using the solution of Non Ionic soap diluted with water . The soap solution should be mild and the recommeded PH Value is 7. 3.0 LIME MORTAR Preparation of Lime Mortar 1:3 (1 Lime: 3 Sand) 2.3 Construct two tanks at ground level. One for slaking of lime and other for storage of slaked lime. Slake the lime in the tank mixing it with water. Water should be sufficiently more and above the lime. Mix and stir with wooden solid pole for three days under the supervision of conservation Architect. Sieve the sand passing through 4.75mm sieve set. Take one part of slaked lime in a container and 3 parts of sieved sand in the same size container Place these materials in a lime mortar miller Grind the mix for a 12 to 15 minutes Remove the mix from the miller and stack it in a storage tank for maturity period of 4 to 5 days. A good aggregate for a Lime Mortar should be with angular grains and free of contaminats such as salt and oranic matter. The aggregates should be well graded sand typically has grain sizes between 4mm and 0.125mm, with the largest proportion of grains at the mid‐point sieve fractions. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 Lime Mortar 1:1 ( 1 Slaked lime :1 fine sand) Lime mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 fine sand) Lime mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 Coarse sand) Lime mortar 1:1.5:1.5 ( 1 Slaked lime:1.5 surkhi:1.5 Coarse sand) Lime Mortar 1:2 ( 1 Slaked lime: 2 Surkhi) Lime Mortar 1:2:1 ( 1 Slaked lime : 2 Surkhi:1 fine sand) Lime Mortar 1:2 ( 1 Slaked lime: 2 Coarse Sand) Lime Mortar 1:2 ( 1 Slaked lime: 2 Fine sand) Lime Mortar 1:3 ( 1 Slaked lime: 3 Coarse Sand) Lime Mortar 1:1:2 ( 1 Slaked lime: 1Surkhi:2 Coarse Sand) Lime Mortar 1:1:2 ( 1 Slaked lime: 1Surkhi:2 fine Sand) Lime Mortar 1:3 ( 1 Slaked lime: 3 fine Sand) Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum 9,142.95 8,232.80 6,806.02 6,319.53 6,565.11 7,571.58 7,005.52 8,256.64 7,588.17 6,397.70 7,679.30 8,782.53 3.13 Lime Mortar 1:2 ( 1 Slaked lime: 2 Marble dust) 3.14 Kafgi Lime Mortar 3:4: 8( 3 Slaked lime :4 coarse sand: 8 surkhi) 3.14.1 Khafgi mix with cement 8:1(8 Khafgi: 1cement) 3.15 Lime Mortar 1:3:6 ( 1 Slaked lime: 3Surkhi:6 Coarse Sand) 3.16 Mud Mortar 1:3:1 ( 1 Slake Lime : 3 Mortar:1 Coarse sand Sand) 3.17 Mud Mortar 4. LIME CONCRETE Providing and laying lime concrete in footings and bases excluding cost of centring and 4.1 shuttering With graded stone aggregate 40mm nominal size and mortar comprising of 1 lime putty 4.1.1 :1 surkhi : 1 fine sand With graded stone aggregate 40mm nominal size and mortar comprising of 1 lime putty 4.1.2 :1 surkhi : 1 coarse sand With graded brick aggregate 40mm nominal size and 40% mortar comprising of 1 lime 4.1.3 putty :1 surkhi : 1 fine sand Providing and laying lime concrete with graded brick aggregate 50 mm nominal size and 4.2 50% mortar comprising of 1 lime putty : 2 surkhi rammed excluding cost of centring and shuttering 50mm lime concrete flooring laid on existing base afte the damage floor up to 40mm 4.3 average thickness, with brick aggregate size 25mm and 50% lime mortar 1:2 (1 lime putty: 2 Surkhi) rammed and finished with lime putty complete Providing and laying lime concrete with graded brick bats nominal size and lime mortar 4.4 compromising of 1 lime putty 1 Surkhi and 1 coarse sand rammed and finished with gur and belgiri treatment complete Providing and laying lime concrete with broken brick aggregate of 40mm nominal size 4.5 and lime mortar compromising of 1 lime putty 1 Surkhi and 1 coarse sand rammed and fi i h d i h finished with gur and belgiri treatment complete db l i i l 4.6 Lime concrete terracing on roofs with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1lime putty: 2 surkhi) rammed and finished with gur and belgiri treatment complete including rounding of junctions with parpet wall complete Lime concrete on floors with 25mm nominal size brick aggregate and 50% lime mortar 1:3:6 (1lime putty: 3 surkhi:6 Coarse Sand) rammed and finished with gur and belgiri treatment Plinth Area Protection using Lime concrete and brick tiles around the building to prevent 4.8 entry of water by dampness and capilarry rise 5. BRICK MASONRY Traditional Bricks 4.7 5.1 5.2 5.3 Traditional brick masonry in nanakshahi or lakhori bricks in lime mortar in proportion similar to the existing traditional lime mortar 1:1:1 (lime :1 surkhi: 1 finesand) Traditional Brick work in plain arches in lime mortar 1:1:1 (1 lime : 1 coarse sand: 1surkhi). Traditional Brick work in gauged arches in lime mortar 1:1:1 (1 lime : 1 coarse sand: 1surkhi). Cum Cum Cum Cum Cum Cum 6,891.19 5,904.21 8,517.74 5,511.77 4,989.45 759.20 Cum 7,461.59 Cum 6,569.66 Cum 6,309.73 Cum 11,441.03 Sqm 910.43 Sqm 841.74 Sqm 1,109.30 Cum 9,341.38 Cum 8,729.65 sqm 3,352.09 Cum 38,974.17 Cum 44,133.67 Cum 45,286.82 Regular Bricks Brick work with bricks of class designation 7.5 in foundation and plinth in 5.4 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Brick work with bricks of class designation 7.5 in superstructure up to two level 5.5 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) 5.6 Extra for brick in Square or rectangular pillars Providing half brick masonry with bricks of class designation 7.5 in lime mortar 1:1:1 (1 5.7 lime putty:1 surkhi:1 fine sand) Brick work in plain arches including centering and shuttering complete for span up to 6 5.8 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand). Brick work in gauged arches including centering and shuttering complete for span up to 6 5.9 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand). Brick Tile Work 5.10 Cum 8,809.80 Cum 9,613.35 Cum 504.50 Cum 1,117.99 Cum 12,533.71 Cum 14,418.27 Cum 14,085.47 Cum 16,129.77 Cum 16,211.13 Sqm 692.89 Random rubble masonry with hard stones in foundation and plinth including levelling with lime concete (1 lime:3surkhi:6 coarse sand) with 40mm stone aggregate upto plinth Cum level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand) 6,341.59 Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in superstructure in lime mortar 1:3 (1 lime putty : 3 coarse sand). Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in plain arch work in lime mortar 1:3 (1 lime : 3 coarse sand) including centering and shuttering complete Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class 5.12 designation 10 in gauged arch work in lime mortar 1:3 (1 lime : 3 coarse sand) including centering and shuttering complete Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile 5.13 bricks of class designation 10 in lime mortar 1:3 (1 lime : 3 coarse sand) 6 STONE MASONRY 6. STONE MASONRY Random Rubble Masonry 5.11 6.1 Random rubble masonry with hard stones in superstructure including levelling with lime concete (1 lime:3surkhi:6coarse sand) with 40mm stone aggregate upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand) Coursed Rubble Masonry Coursed rubble masonry in first sort with hard stones in foundation and plinth including 6.3 levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1course sand) Coursed rubble masonry in second sort with hard stones in foundation and plinth 6.4 including levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime:1 surkhi:1 fine sand) Coursed rubble masonry with hard stone (first or second sort) in superstructure above 6.5 plinth level and upto two floor level 6.5.1 Masonry work (first sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand) 6.2 6.5.2 Masonry work (second sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand) Cum 7,135.87 Cum 5,688.89 Cum 5,386.22 Cum 6,385.56 Cum 6,093.17 Ashlar Masonry Stone work in plain ashlar masonry in superstructure in lime mortar 1:1:1 (1 lime:1 6.6 surkhi:1 fine sand) including pointing with lime mortar and an admixture of pigmen matching the stoneshade. 6.6.1 One face dressed 6.6.1.1 Red sand stone 6.6.1.2 White sand stone 6.6.2 Both face dressed 6.6.2.1 Red sand stone 6.6.2.2 White sand stone 6.6.2.3 Lime Stone Stone work plain ashlar in arches in super structure in lime mortar 1:3 (1 lime : 3 coarse 6.7 sand) including centring, shuttering and pointing with lime mortar and an admixture of pigment matching the stone shade 6.7.1 One face dressed 6.7.1.1 Red sand stone 6.7.1.2 White sand stone 6.7.2 Both face dressed 6.7.2.1 Red sand stone 6.7.2.2 White sand stone Stone work plain ashlar in domes in lime mortar 1:3 (1 lime : 3 coarse sand) including 6.8 centring, shuttering and pointing with lime mortar and an admixture of pigment matching the stone shade. 6.8.1 One face dressed 6.8.1.1 Red sand stone 6.8.1.2 White sand stone 6 8 2 Both face dressed 6.8.2 B hf d d 6.8.2.1 Red sand stone 6.8.2.2 White sand stone 7. FLOORING Stone Flooring 7.1 7.1.1 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.2 7.3 7.4 Cum Cum 30,640.50 31,316.52 Cum Cum cum 38,786.24 39,102.47 35,456.51 Cum Cum 35,799.80 36,573.94 Cum Cum 44,043.66 44,817.80 Cum Cum 47,919.70 48,693.84 Cum Cum 72,021.29 72,795.43 Sqm Sqm Sqm Sqm Sqm Sqm 3,927.19 1,783.35 2,659.58 1,623.07 1,856.82 1,756.64 Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by conservation architect, over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime :1 surkhi:1 coarse sand) laid and jointed , including rubbing and polishing complete with Makrana white second quality Raj Nagar plain Agaria White Black zebra Udaipur green marble Pink plain marble Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with lime slurry mixed with pigment to match the shade of the slab, including rubbing and polishing Sqm complete with base of lime mortar 1 : 1:1 (1 lime :1surkhi:1 coarse sand) 25mm thick Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick lime mortar 1:1:1 (1 lime: 1surkhi:1coarse sand) and jointed with lime Sqm slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. Laterite stone flooring with 18 mm thick Laterite stone as per sample of Laterite approved by Engineer‐in‐Charge, over 20 mm (average) thick base of lime mortar 1:4 (1 lime : 4 Sqm coarse sand) laid and jointed withlime slurry including rubbing and polishing complete with : 1,271.69 1,352.09 2,272.37 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush. 7.5.1 Red sand stone 7.5.2 White sand stone 7.5 7.6 Sqm Sqm 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 ( 1lime : 3 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 stone dust) Sqm with an admixture of pigment to match the shade of stone. 7.6.1 Red sand stone 7.6.2 White sand stone 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 7.7 1:1:1 (1 lime: 1 surkhi:1coarse sand) with joints finished flush. 7.7.1 Red sand stone 7.7.2 White sand stone 40 mm thick rubbed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime :3 coarse sand) with joints 3 mm thick, side buttered with lime mortar 1:2 (1 lime : 2 7.8 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar 7.8.1 Red sand stone 7.8.2 White sand stone 842.42 874.36 Sqm Sqm 906.13 938.07 7.9 Sqm 7.10 Red oxide plastering (up to 30cm height) with cement mortar 1:3( 1 cement : 3 coarse sand) finished with a floating coat of neat cement including rounding of junctions with floor. 18mm thick Sqm 7.11 Laying lime flooring‐Providing and laying lime concrete(1 lime:3 brick bats) up to 100mm thickness tamping and compacting properly which is follwed by laying of Lime mortar 1:3 up to a thickness of 20mm.Rework on it to get desired smooth surface Sqm 7.13 Heritage floor tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse Sqm sand) with joints finished flush. Heritage Skirting tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse Sqm sand) with joints finished flush. 8. ROOFING Providing and laying flat brick/ Terracota tiles on roofs grouted with lime mortar 1:2(1 8.1 lime: 2 fine sand) mixed with 5% crude oil by weight of lime, over 12mm layer of lime mortar 1:2 (1 lime: 2 fine sand) 704.45 736.39 Sqm 40mm thick red oxide flooring under layer 0f 30mm thick cement concrete 1:2:4(1cement:2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size) and top layer of 10mm thick plaster of cement red oxide mix( using 3.5 kg of red oxide of iron per 50 kg of cement) 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement red oxide mix of same proportion including cement slurry, rounding off egdes, strips, etc but excluding the cost of nosing of steps. complete 7.12 727.16 759.10 Sqm 571.63 649.74 3,211.69 2,690.71 624.91 8.2 Removing brick tiles from 50 to 6cm thick lime terrace and relaying an average thickness 7.5cm laid to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1 Lime putty:2 Surkhi) rammed and finished with gur and belgiri treatment complete and covered with brick tiles of class designation 100 to 50 mm thick red sand stone grouted with lime mortar 1:3(1 Lime: 3 Fine sand) with 5% crude oil by weight of lime over 20mm layer of lime mortar 1:3 (1 lime : 3 fine sand) Sqm 751.35 8.3 Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per approved pattern on bamboo frame work complete Sqm 1,401.98 8.4 Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per approved pattern on Teak wooden frame work complete Sqm 2,928.94 8.5 Construction of Jack arched roof using Rolled steel joists, fired clay bricks with Kafgi mix Sqm 10,444.98 Providing Lime stone slab for roofing and laying them in Lime mortar 1:3 over wooden karries or R.C.C. battens or structural steel sections (karries or battens or structural steel Sqm 915.62 8.6 sections to be separetely), including pointing the ceiling joints with lime mortar 1:3 complete: Roofing with pot‐Providing and laying burnt earthen pots over and between lime 8.7 concrete/mud mortar using pots of max dia 150mm to 200 mm and pack the gaps Sqm 1,138.40 between pots with Lime Mortar (1:3) 9. FINISHING Preparation of Lime Plaster Mix lime mortar to the lime water which is to be applied with natutal additives like jaggery, soapnut, bhel fruit, etc Preparation of surface Wet the surface. Remove all the dust particles .Apply lime plaster up to required thickness . Rework on the plaster to 9 1 Lime plaster 1:3 (1 Slaked lime : 3 Coarse sand) 9.1 Li l 1 3 (1 Sl k d li 3 C d) 9.1.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 1,019.53 9.1.2 15mm thick‐ single coat 9.1.3 12mm thick‐ single coat 9.2 Lime plaster 1:1:1 (1 lime putty : 1 surkhi: 1 finesand) Sqm Sqm 975.47 949.02 9.2.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 1,032.48 9.2.2 15mm thick‐ single coat 9.2.3 12mm thick‐ single coat 9.3 Lime plaster 1:2:1 (1 lime putty : 2 Coarse sand:1 surkhi) Sqm Sqm 987.06 954.07 9.3.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 988.56 9.3.2 15mm thick‐ single coat 9.3.3 12mm thick‐ single coat 9.4 Lime Plaster 1:2 (1 lime : 2 surkhi) Sqm Sqm 955.86 929.11 9.4.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 992.92 9.4.2 15mm thick 9.4.3 12mm thick 9.5 Lime Plaster 1:2 (1 lime : 2 Coarse Sand) 20mm thick Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followed by 9.6 grinding to fine paste for smooth finish Preparing and applying of lime mortar plaster 1 Lime:2 fine sand up to a thickness of 9.7 3mm over the lime mortar plaster laid. Plastering of the dome in lime mortar 1:1:1(1 Lime:1 surkhi:1 coarse sand) of 100mm 9.8 thickness 9.9 Mud plaster 1:3:1(1 lime slaked : 3 Mud:1 coarse sand) sqm Sqm Sqm 953.65 927.34 1,004.37 sqm 424.67 Sqm 291.33 Sqm 1,163.34 Sqm 951.92 Ornamental Plaster work Making cornice band with ornamental design as per the conservation Architect's design 9.10 with lime plaster (1lime:3 finesand) 9.10.1 Size 150mm wide and 50mm average thick 9.10.2 Size 100mm wide and 50mm average thick 9.10.3 Size 50mm wide and 50mm average thick Repairing ornamental plaster works to match with the existing design using lime plaster 9.11 (1lime putty:1surkhi) Stucco work in lime, surkhi(1:2) as per traditional practices and design, the mortar should 9.12 be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per design. Lime Pointing 9.13 Raised and cut lime pointing 1:2 (1 Lime:2 surkhi) 9.13.1 In stonework 9.13.2 In Brickwork 9.14 Recessed lime pointing 1:2 (1 Lime:2 surkhi) 9.14.1 In stonework 9.14.2 In Brickwork 9.15 Flush / Ruled/Struck or Weatheredd lime pointing 1:2 (1 Lime:2 surkhi) 9.15.1 In stonework 9.15.2 In Brickwork 9.16 Ruled Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi) Struck or weathered Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 9.17 Surkhi) Repointing of raked out joints of Random rubble masonry by using lime mortar 1:1:1 9.18 (1Lime:1coarse sand:1Brick jeera) R i i f k d j i f A hl b i li 111 Repointing of raked out joints of Ashlar masonry by using lime mortar 1:1:1 9.19 (1Lime:1coarse sand:1 Surkhi) 10. STONE WORKS Wall Lining works Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing filled with a grout of average 12 mm thick lime mortar 1:2 (1 lime : 2 coarse sand) 10.1 including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixtureof pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone ‐ exposed face fine dressed with rough backing. 10.1.1 70 mm thick 10.1.2 60 mm thick 10.1.3 50 mm thick 10.1.4 40 mm thick 10.1.5 30 mm thick 10.2 10.2.1 10.2.2 10.2.3 10.2.4 10.2.5 10.3 10.3.1 10.3.2 10.3.3 10.3.4 10.3.5 M M M 792.75 577.41 573.64 Sqm 3,294.11 Sqm 2,592.02 Sqm Sqm 309.33 305.14 Sqm Sqm 207.12 177.44 Sqm 275.41 183.45 337.19 Sqm 339.07 Sqm 415.90 Sqm 321.34 Sqm Sqm Sqm Sqm Sqm 2,889.90 2,766.26 2,584.90 2,336.93 2,232.92 Sqm Sqm Sqm Sqm Sqm 3,883.05 3,709.93 3,574.32 3,379.48 3,255.72 Sqm Sqm Sqm Sqm Sqm 3,125.71 2,964.59 2,845.36 2,691.72 2,560.22 Red sand stone ‐ Exposed face machine cut and table rubbed with rough backing 70 mm thick 60 mm thick 50 mm thick 40 mm thick 30 mm thick White sand stone ‐ exposed face fine dressed with rough backing . 70 mm thick 60 mm thick 50 mm thick 40 mm thick 30 mm thick 10.4 10.4.1 10.4.2 10.4.3 10.4.4 10.4.5 10.5 White sand stone ‐ Exposed face machine cut and table rubbed with rough backing 70 mm thick 60 mm thick 50 mm thick 40 mm thick 30 mm thick 25mm thick Kota stone slabs exposed face dressed and rubbed Sqm Sqm Sqm Sqm Sqm Sqm 3,927.37 3,782.04 3,644.62 3,493.37 3,361.87 1,601.59 10.6 Wall lining butch work upto 10 m height with Dholpur stone 40 mm thick rough facing on the exposed surface with stone strips of minimum length 300 mm and required width, including embedding every tenth layer and bottom most layer in masonry or concrete after making necessary chases of size 75x75 mm and by providing layer of 75 mm thick strips i/c 20 mm thick bed of lime mortar 1:3 (1 lime : 3 coarse sand) i/c ruled pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment to match the shade of stone complete as per direction of Engineer‐incharge Sqm 1,624.11 10.7 Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement Sqm : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). 3,426.46 10 8 10.8 Marble work gang saw cut (polished and machine cut) of thickness 18 mm for cladding over dome (veneer work), backing filled with a grout of average 20 mm thick in lime mortar 1:3 (1 lime : 3 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 t 1 3 (1 li 3 d) i l di i ti ith li t 1 2 (1 li 2 SSqm marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). 4,120.22 4 120 22 10.9 Providing and fixing stainless steel cramps of required size and shape for anchoring stone wall lining to the backing or securing adjacent stones in stone wall lining in lime mortar 1:2 (1lime : 2 coarse sand), including making the necessary chases in stone and holes in walls wherever required 10.10 Providing and fixing stone dowels 10x5x2.50 cm cut to double wedge shape as per design Each in lime mortar 1:2 (1 lime : 2 coarse sand), including making the necessary chases. Kg Providing and fixing copper pins 7.5 cm long 6 mm diameter for securing adjacent stones 10.11 in stone wall lining in lime mortar 1:2 (1lime : 2coarse sand), including making the Each necessary chases. Sunshade, Brackets and others Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including 10.12 providing and fixing with 4 Nos gun metal cramp 25x6 mm 30 cm long and dowel bars 7.5 Each cm long 6 mm dia as per design Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured along the slope in lime mortar 1:1:1 (1 lime : 1Surkhi:1 Fine sand) with 12 mm diameter anchoring steel bar, 45 cm long, fixed in each stone and supported on Sqm 10.13 and including with bricks cove in lime mortar 1:1:1 (1 lime : 1Surkhi:1 Fine sand), including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an admixture of pigment matching the stone shade 10.13.1 Red sand stone With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 10.13.2 White sand stone With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 680.16 41.34 34.92 3,433.20 1,851.51 1,891.44 Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm wide projection in lime mortar 1:3 (1 lime : 3 coarse sand) including pointing in lime mortar 10.14 1:2 (1 lime cement : 2 stone dust) with an admixture of pigment matching the stone shade 10.14.1 Red Sand stone 10.14.2 White Sand stone 10.15 Sqm Sqm 30 mm red sand stone sun‐shade (chisel‐dressed) supported on red sand stone brackets, fixed in walls with lime mortar 1:3 (1 lime : 3coarse sand), including finishing complete 1,187.20 1,288.39 1,600.93 Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick 10.16 in lime mortar 1:6 (1 lime : 6 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment matching the stone shade 10.16.1 Red Sand stone 10.16.2 White Sand stone Cum Cum 49,495.21 50,737.35 Sqm Sqm 14,553.66 14,668.00 10.18.1 Red Sand stone Sqm 10.18.2 White Sand stone Sqm 11. REPAIRS AND RECONSTRUCTION 11 REPAIRS AND RECONSTRUCTION Repairs to plaster of thickness 10 mm to 30 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, preparation of mortar by traditional practice Sqm 11.1 (by hand grinder) in 3 course & loi, tamping, beating, till the shrinkage cracks are disappear disposal of rubbish to the dumping ground within 50 metres lead with lime moratr 1:2 (1 lime: 2 surkhi) 824.20 891.92 Providing and fixing stone jali 40 mm thick throughout in lime mortar 1:3 (1 lime : 3 10.17 coarse sand), including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc 10.17.1 Red Sand stone 10.17.2 White Sand stone 10.18 Sandstone flooring as a plinth protection around the building using sand stone of 50mm thick & 1:1:1 lime mortar (1 lime:1surkhi:1 coarse sand) for filling up the joints. 1,354.73 11.2 Regrading terracing of mud phaska covered with tiles or brick, in lime by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in lime mortar 1:3 (1 lime : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 metres lead. Sqm 427.27 11.3 Removing brick tiles in 5 to 6 cm thick lime terracing from existing roof and relaying an average thickness 7.5 cm laid to fall with 25mm nominal brick size aggregate and 50% lime mortar 1:2 (lime putty : 2surkhi) rammed and finished with gur and belgiri treatment Sqm complete and covered with flat brick tiles of class designation 100 or 50mm thick red sand stone grouted with lime mortar 1:3(1 lime : 3 fine sand) mixed with 5% of crude oil by weight of lime, over 12mm layer of lime mortar 1:3(1lime:2 fine sand) 2,071.37 11.4 Replacing sand stone slabs in roofing, laid in lime mortar 1:3 (1 lime :34 coarse sand), including necessary repairs and lime pointing with same mortar complete, including disposal of rubbish to dumping ground within 50 metres of lead : 11.4.1 Red/ white sand stone slabs 30 to 50 mm thick 11.4.2 Granite /Marble stone slabs Sqm Sqm 918.79 4,076.41 11.5 Providing post dated Damp Proof Course (DPC) by raking out mortar from brickwork atleast 75mm deep from both faces of wall at plinth height. The cavities formed must be cleaned by flushing with clean water. The clean surface with open cavities are next treated with limewater to attempt to consolidate the friable areas. The consolidation treatment is followed by pressure grouting with a line of close‐spaced drilling (average 150mm centres) to be made and silicone solutions in solvent and the siliconate/latex mixture are pumped in under pressure. Stone consolidation‐removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar(1:3) wherever ncessary 12. TREATMENT OF CRACKS 11.6 M 2,688.87 Cum 5,642.86 12.1 Repairing of .5mm to 5 mm wide open joints / cracks in all types of sand stone masonry work including scrapping of loose jointing material from cracks. The inner side to be filled/pointed with polymer mixed lime mortar with wooden trowel and fixing grouting nipple from outer side as directed by Architect. Then apply polymer based lime mortar by injection grouting through 5mm diameter nozzle through the pre fix nipple up to total thickness of existing stone wall and removing the PVC nipple pipe, lime moratr of mix lime & sand 1:1 mix with polymer using katha or other additives to achieve require matching colour and including cost of all materials, labour, machinery, equipment, curing and cleaning the site as directed. 12.2 Providing and fixing chicken wire mesh (6mm x 6mm) of 24 gauge 200 mm wide along the joints of brick work with hooks/nails etc. complete so as to receiving the plastering work sqm over chicken mesh as per the direction of Engineer‐in‐charge. 12.3 Steel rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless Steel‐rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless steel rods of 90cms length of which 15cm on either side and cold bending at 90degrees. The stainless steel clamps to be fixed perpendicular to the crack by drilling in stone and fixing with cement and aradite mixture in such a way that the entire length of the rod is in complete contact of the stone and the bent ends are fully inserted in the cracked stone. Use 316 grade stainless steel charge per hole.steel rod charges are counted per kg.Holes with 6mm, 8mm, 10mm or 12mm dia.as per requirement of position. No 191.30 12.4 Stitching of cracks in brick masonry with stone lintels of 450x 200x50 mm . Chasing, grooving the brick masonry and inserting the stone lintel. All around the stone, lime mortar should be properly packed . No 253.79 12.5 Propping with steel to support the leaned structure ( roof and wall) using pipes, channels, angles, girders , wooden wages to prevent further leaning/ collapse Sqm 981.47 12.6 Providing and placing of anchors in cored holes of predefined lengths, diameters & locations obtained as output from analysis of the simulated model of the bridge using existing material properties and geometrical conditions Coring should be done by use of high speed low vibratory coring machine with diamond core bits. It should impart minimal or no vibration to the structure being strengthened. The coring motor & bit should be capable to core at least upto 3m in straight line. 13.1.1 For thickness of tiles 10 mm to 25 mm. Sqm 111.70 13.1.2 For thickness of tiles above 25 mm and up to 40 mm. Sqm 140.43 M 71.53 1,162.78 13.DISMANTLING AND DEMOLISHING 13.1 Dismantling tile work in floors and roofs laid in lime mortar including stacking material within 50 metres lead For thickness of tiles . 13.2 Careful removal of existing deteriorated/ damaged/ weathered lime plaster without damaging the suurface below it. Caution: Workers have to wear helmet,safety belt and safety gloves Methodology: i. Erect scaffolding enabling the safe platform to work ii. Use precise tools like scalpe etc, to remove the plaster iii. Take precaution such that surface below the plaster is not damaged. 13.3 Raking out the joints of country/Nankshahi brick, scooping out dead and decayed mortar very slowly and carfully with scooping rods, then washing complete with hand spray Sqm pump. Preparing the surface for replastering including disposal of rubbish with 250m lead Sqm Raking out joints of brick masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the Sqm 13.4 surface for re‐pointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead. 14. WOOD REPAIR WORKS 14.1 Reinforcing timber beams with steel plates of size 100 x300x12 mm with bolts and nuts 15.3 213.66 423.82 m 1,357.90 m 1,153.51 Sqm 1,094.48 Removing the present treatment of APP mineral finish given on the terraces and reach the Removing the present treatment of APP mineral finish given on the terraces and reach the Sqm sound surface below the APP and cleaning the surface to reach the sound surface. 120.00 Reinforcing timber beams with flitch plates that is sandwiched between to increase the sstrenght of beams Reinforcement of existing wooden beams with L shape Angles 70x70x6 at the bottom of 14.3 the beam Consolidation of woodwork with sawdust and polyster resin of low viscosity, wherein the 14.4 work needs to completed in similar application and then smoothen and finished as per the Engineer incharge. 15. ADDITIONAL ITEMS (WATER PROOFING, SURFACE CONSOLIDATION) 15.2 227.54 No 14.2 15.1 291.10 Repairing of the cracks and the junctions at the terraces with Cement & Latex putty, so as to make them water tight and providing the Concave shaped Gola all along the periphery m of the terraces. Providing and applying Single component Coloured acrylic elastomeric coating in two coats of SHALICRYL 215 2nd coat after touch dry of 1st coat as per the manufacturers Sqm specification or strictly as per Engineer In‐ Charge. 65.00 280.00 15.4 Over insulation directly providing and laying specially formulated elastomeric single‐ply 45 mil (1.2 mm) EPDM non‐reinforced (Ethylene, Propylene, Diene Terpolymer) membrane like SURE SEAL non‐reinforced black 45 mil or approved equivalent with minimum Roll width 6 meters. Membrane shall be laid loose. Overlap joint shall be made using SecurTape technology. Membrane shall have minimum of 75mm side and end laps which shall be sealed with highly formulated double sided SECUR TAPE. Membrane shall be able to resist 40mtr. head pressure, with tensile strength of > 11.3 mpa, elongation > 500% and water vapour diffusion of < 24'000 microns, Tear resistance to ASTM D624, Die C dimensional change < ‐0.7%. 100% UV resistance, Ozone resistance according to ASTM D1149, The membrane shall be taken to a height of 300mm of the parapet wall or adjoining wall & fixed with HP fastener and sealed with Sealant and Water cutoff mastic. The membrane shall be covered with the geo‐textile membrane for the protection of EPDM membrane to avoid getting membrane punctured while working further. Sqm 720.00 15.5 Providing and Laying SHALIMAGIC (1:1) on Horizontal surface admixed with water at required dosage as per the manufacturers specification, as directed by Engineer Incharge. Sqm 105.00 15.6 MEMBRANE APPLICATION Starting at low point from the roof, unroll the STP LTD. APP membrane SUPER THERMOLAY (4mm ) once the priming coat with SHALITEX PRIMER of STP LTD is dried. Align the roll correctly roll it half in alignment before torching. Avoid shifting of the membrane while torching. Use gas burner to heat substrate and underside to softening points. When the embossing disappears, roll forward and press firmly against substrate to bond from the lower end toward and press firmly against substrate to bond from the lower end towards the higher end. Ensure sufficient bleed on side and end over laps. Sqm Once the half of the roll is torched properly to the substrate, unroll the balance roll and repeat the process. An overlap of 75‐ mm shall be maintained for all the continuing sides. Heating shall be done on both the membranes to be overlapped and pressed firmly with the help of round shape trowel. The care shall be taken to leave no gap at any point in the overlapped area. If noticed, reheating shall be done to seal it. Providing and Laying Of China Mosaic Tiles in white cement on membrane based water proofing as sacrificial layer Repairing of Grooves and the cracks available on the terrace with POLYMERIC Putty 15.8 prepared by admixing with Cement mortars / neat cement. Providing and laying PCC in panels of 3m X 3m with the Average thickness of 30‐40 mm in the ratio of 1:2:4 admixing the integral waterproofing compound as per IS: 2645 and 15.9 reinforcing with RECRON 3S fibers so as to attain the proper slope and protection for the EPDM membrane system. 15.10 Filling the PU sealant in the grooves of the panels of PCC laid over the terrace. Water proofing for lime terrace deck slab including preparation of the surface : The top surface should be cleaned of all dirt, loose material & kept dry. In case of pot holes / f h ld b l d f ll di l i l&k d I f h l / cracks, the same shall be repaired with E‐3‐HP ( epoxy grouting system ) Shalimer 456 ( 15.11 Epoxy mortar) or SBR emulsion of Dr Fix.. After repairing the surface a layer of galvanized chicken mesh should be laid and finished with 20 mm thick lime mortar of 1: 2 ( 1 lime : 2 coarse sand ). 15.7 430.00 Sqm 300.00 Sqm 100.00 Sqm 405.00 m 185.00 Sqm 232.2 Starting at low point from the roof, unroll the STP Superthermolay 3mm (with polyster) (36 kgs)( 1 Mtr X 10 Mtr) or APP Torchshield ( with polyester ) of Dr. FIX, roll once the priming coat is dried. Align the roll correctly and RE‐ roll it half in alignment befor torching. Avoid shifting of the membrane while torching. Use gas burner to heats substrate and underside to softening points. When the embossing disappears, roll forward and press firmly against substrate to bond from the Lowe end toward and press firmly against substrate to bond from the lower end towards the higher end. Ensure sufficient bleed on side and end over laps. Once the half of the roll is torched properly to the substraste, unroll the balance roll and repeat the process. An overlap of 100‐ mm shall be maintained for all the continuing sides. Heating shall be done on both the membranes 15.12 Sqm to be overlapped and pressed firmly with the help of round shape trowel. The care shall be taken to leave no gap at any point in the overlapped area. If noticed, reheating shall be done to seal it.The places where opening are encountered for rain water down take pipes, the membranes shall be cut open by sharp knife in + sign in the center of an opening. Circular cutting shall not be done. Torching shall be done on the reverse side of these four triangular pieces. Bend all the four pieces inside and tightly pressed against pipe surface. The treatment shall have to terminate at the expansion joint. The curb wall of 4 inches thick shall be constructed on both sides of joint. The height can vary from 300 mm to 500 mm. The curb wall shall be plastered smoothly and corner rounding with polymer‐ modified mortar shall be done before membrane applications starts. 529.64 Exposing the first layer of brick wall using 14mm bit with rotary hammer spacing min. 100mm, max. 150mm at an angle of 45degree to reach the centre of the wall. The 15.13 specialised waterproofing chemical (WACKER 290) to be inserted through drip tanks into these holes for 2‐3 days at a regular liquid flow speed after applying of this DPC liquid one coat of PRO‐TEKA 500 to be applied on the wall surface before plastering m Providing and applying of double coat ethyle silicate (Waker OH 100) with soft non ferous 15.14 brush on week surfaces of stone for consolidation of the surface. The second coat has to Sqm be aplied when the first coat is still wet Bonding Work for plaster repairing surface : Providing and painting with Dr fix MPB a polymer resin such as acrylic copolymers after properly cleaning the surface from imperative (dust and grease free) to be plastered just before plastering so that the mortar Sqm 15.15 must be applied while the bond coat is still 'sticky'. Conservator must be vigilant as in case the bond coat cures / dries, the original surface must be uncovered and the process started again. 650.00 1500.00 100.00 1.0 SITE CLEARANCE 1.1 Code DSR 0114 DSR 0115 DSR 0101 DSR 0113 DSR 9999 Clearance of debris around the heritage building by excavation upto depth 1.50mtr to 2.00 mtr carefully without damaging the buried architectural parts of the building and collect all the intact parts at proper place for reuse at the time of restoration work as per direction of Engineer incharge. Description Details of cost for 10 cum LABOUR Beldar Coolie Bhisti Chowkidar Tools and Tackles Sundries Unit Quantity Rate in Rs Amount in Rs Day day day day L.S L.S 6.50 4.50 0.40 0.01 25.00 2.73 297.00 297.00 328.00 297.00 1.70 1.70 1,930.50 1,336.50 131.20 2.38 42.50 4.64 day 1.00 297.00 297.00 3,744.72 37.45 3,782.16 567.32 4,349.49 434.95 Additional for sorting of serviceable and stacking Material DSR 0115 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Cum Cost of 1 Cum 1.2 Code DSR 0114 DSR 0115 DSR 9999 Scientific debris to be done manually using sieve as per the direction of the conservation architect. All antiquities and historic remains to be classified and documentated photographically before numbering and storing them in the office Description Details of cost for 1 cum LABOUR Beldar Coolie Sundries Tools and Tackles Total Add water charges 1% Total Add CPOH @ 15% Unit Day day L.S L.S Quantity 0.50 1.00 13.83 25.00 Rate Amount 297.00 297.00 1.70 1.70 148.50 297.00 23.51 42.50 511.51 5.12 516.63 77.49 594.12 Cost of 1 Cum 1.3 Code DSR 0114 DSR 0115 DSR 9999 Add extra for sorting lifting & stacking charges for architectural parts up to 50m lead. Description Details of cost for 1 cum LABOUR Beldar Coolie Sundries Total Add water charges 1% Total Add CPOH @ 15% Unit Day day L.S Cost of 1 Cum Quantity 0.25 0.75 13.83 Rate 297.00 297.00 1.70 Amount 74.25 222.75 23.51 320.51 3.21 323.72 48.56 372.27 2.0 SURFACE CLEANING AND BONDING 2.1 Code DSR 0771 M Rate DSR 0124 DSR 0114 DSR 0128 DSR 9999 Removing of old sulphated lime wash/white or colour wash in multiple applications without causing damage to the surface below. Scrubbing (not by scraping which leaves surfaces scarred and scratched ) with bristle brushes and hot water ( Care to be taken if the surface is weak one it will break down). Hot water should be used if the limewash has an oil or tallow binder. Gentle cleaning with air abrasive tools can be used if the wall surface is not very week.The final clean will almost invariably have to be carried out by hand scrubbing and rinsed with clean water on completion. The work should be done under supervision of a trained conservator. Description Details of cost for 10 Sqm Fuel for hot water Conservator Mason Beldar Mate Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Unit lit day day day day LS Quantity 15.00 0.05 0.75 8.50 0.06 55.00 Rate 60.00 1,650.00 361.00 297.00 328.00 1.70 Cost of 1 Sqm 2.2 Code M Rate M Rate DSR 0124 DSR 0114 DSR 0128 DSR 9999 Amount 900.00 82.50 270.75 2,524.50 19.68 93.50 3,890.93 38.91 3,929.84 589.48 4,519.32 451.93 Removal of rust, existing coatings, mill scale, dirt, oil, grease, and other contaminants from steel sections using Micro sand with the help of pressure pump. Description Details of cost for 1 Sqm MATERIAL Micro Sand Pressure Pump LABOUR Mason Beldar Mate Sundries Total Add water charges 1% Total Add CPOH @ 15% Unit Quantity Rate Amount Kg Day 10.00 0.05 5.00 1,000.00 50.00 50.00 day day day LS 0.05 0.25 0.08 20.00 361.00 297.00 328.00 1.70 18.05 74.25 26.24 34.00 252.54 2.53 255.07 38.26 293.33 Cost of 1 Sqm 2.3 Code M Rate DSR 0124 DSR 0114 DSR 0128 DSR 9999 Removal of stains, dirt, blackening and other contaminants from Marble by using the solution of Non Ionic soap diluted with water . The soap solution should be mild and the recommeded PH Value is 7. Description Details of cost for 1 Sqm MATERIAL Non Ionic Soap Solution LABOUR Mason Beldar Mate Sundries including consumables Total Add water charges 5% Total Add CPOH @ 15% Unit Lit day day day LS Cost of 1 Sqm Quantity Rate Amount 0.05 150.00 7.50 0.05 0.10 0.09 15.00 361.00 297.00 328.00 1.70 18.05 29.70 29.52 25.50 110.27 5.51 115.78 17.37 133.15 3.0 LIME MORTAR A good aggregate for a Lime Mortar should be with angular grains and free of contaminats such as salt and oranic matter. The aggregates should be well graded sand typically has grain sizes between 4mm and 0.125mm, with the largest proportion of grains at the mid-point sieve fractions. 3.1 Code Lime Mortar 1:1 ( 1 Slaked lime :1 Fine sand) Description Unit Details of cost for 1 cum. Ref DAR 1972 ( E) Mortars Item No.4 Pg 53 MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Quantity Rate in Rs Amount in Rs (0.713 cum. of lime putty = 4.5 q of unslaked lime) 0775 -DAR 2007 Carriage (1 E- DAR 1972 pg 51 ) carriage of lime -1 Quintals occupies 0.129 cum DSR 0773 DSR 0983 DSR 2261 4.51 1.07 1.07 800.00 650.00 115.92 3,608.00 695.18 123.98 0.00 106.64 0.00 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 DSR 0114 DSR 0101 Un Slaked Lime Quintal Fine Sand zone(IV) cum Carriage of fine sand cum Carriage of lime. 4.51q=.58 cum cum unslaked lime LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day 3.00 3.00 297.00 328.00 891.00 984.00 M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00 M Rate DSR 9999 Fuel cost for running the miller Sundries DSR 2208 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Lit 10.00 60.00 600.00 L.S 52.00 1.70 88.40 Cost of 1 cum say 9,142.95 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. 3.2 Code DSR 0773 DSR 0983 DSR 1182 Lime Mortar 1:1:1 ( 1 Slaked lime :1 surkhi:1 fine sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 3.01 Fine Sand zone(IV) cum 0.71 Surkhi cum 0.71 Rate 800.00 650.00 700.00 Amount 2,408.00 463.13 498.75 DSR 0114 DSR 0101 Carriage of lime 3.01q=.48 cum cum unslaked lime Carriage of fine sand cum Carriage of surkhi cum LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries DSR 2208 DSR 2261 DSR 0114 DSR 0101 DSR 0114 DSR 0101 0.39 106.64 41.41 0.48 0.48 115.92 106.64 55.06 50.65 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 3.00 3.00 297.00 328.00 891.00 984.00 1.00 800.00 800.00 Lit 10.00 60.00 600.00 L.S 52.00 1.70 88.40 Cost of 1 cum say 8,232.80 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. 3.3 Code DSR 0773 DSR 0983 DSR 1182 DSR 2208 DSR 2261 Lime Mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 course sand) Description Unit Quantity Details of cost for 1 cum. Ref DAR 1972 ( E) Mortars Item No.4 Pg 53 MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 3.01 Coarse sand zone III cum 0.48 Surkhi cum 0.48 Carriage of lime cum 0.39 Carriage of coarse sand cum 0.48 Carriage of surkhi cum 0.48 LABOUR: Rate Amount 800.00 1,120.00 700.00 106.64 106.64 106.64 2,408.00 532.00 332.50 41.41 50.65 50.65 For measuring, carrying, depositing and mixing DSR 0114 DSR 0101 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 DSR 0114 DSR 0101 Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day 2.00 2.00 297.00 328.00 594.00 656.00 M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00 M Rate DSR 9999 Fuel cost for running the miller Sundries 5.00 52.00 60.00 1.70 300.00 88.40 6,806.02 DSR 0114 DSR 0101 Lit L.S Cost of 1 cum say DSR 0114 DSR 0101 Lime Mortar 1:1:2 ( 1 Slaked lime :1.5 surkhi:1.5 course sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 2.26 Coarse sand zone III cum 0.54 Surkhi cum 0.54 Carriage of lime cum 0.29 Carriage of coarse sand cum 0.54 Carriage of surkhi cum 0.54 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 2.00 Bhisti day 2.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.4 Code DSR 0773 DSR 0983 DSR 1182 DSR 2208 DSR 2261 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Lit L.S Cost of 1 cum say DSR 0114 DSR 0101 Lime Mortar 1:2 ( 1 Slaked lime:2 surkhi) Description Unit Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal Surkhi cum Carriage of lime 3.01q=.39 cum cum unslaked lime Carriage of surkhi cum LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.5 Code DSR 0773 DSR 1182 DSR 2208 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Lit L.S Cost of 1 cum say Rate Amount 800.00 1,120.00 700.00 106.64 106.64 106.64 1,809.80 599.20 374.50 31.12 57.05 57.05 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 6,319.53 Quantity Rate Amount 3.01 0.95 800.00 700.00 2,408.00 665.00 0.00 106.64 0.00 0.95 106.64 101.31 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 2.00 2.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 6,565.11 DSR 0114 DSR 0101 Lime Mortar 1:2:1 ( 1 Slaked Lime: 2 Surkhi:1 fine sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.356 cum. of lime putty = 2.3 q of unslaked lime) Un Slaked Lime Quintal 2.30 Surkhi cum 0.71 Fine sand zone IV cum 0.53 Carriage of lime 3.01q=.48 cum cum 0.30 unslaked lime Carriage of surkhi cum 0.71 Carriage of fine sand cum 0.53 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 3.00 Bhisti day 3.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.6 Code DSR 0773 DSR 1182 DSR 1182 DSR 2208 DSR 2266 DSR 2261 DSR 0114 DSR 0101 DSR 0114 DSR 0101 1.00 Rate Amount 800.00 700.00 650.00 1,840.00 499.10 347.10 106.64 31.64 106.64 115.92 76.03 61.90 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 328.00 891.00 984.00 800.00 800.00 Lit 10.00 60.00 600.00 L.S 52.00 1.70 88.40 Cost of 1 cum say 7,571.58 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. DSR 0114 DSR 0101 Lime Mortar 1:2 ( 1 Slaked lime :2 coarse sand) Description Unit Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal Coarse sand zone III cum Carriage of lime 3.01q=.48 cum cum unslaked lime Carriage of coarse sand cum LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day M Rate Running cost for upkeep of mortar mill day 3.7 Code DSR 0773 DSR 1182 DSR 2208 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Quantity Rate Amount 3.01 0.95 800.00 1,120.00 2,408.00 1,064.00 0.39 106.64 41.41 0.95 106.64 101.31 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 2.00 2.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 M Rate DSR 9999 Fuel cost for running the miller Sundries Lit L.S Cost of 1 cum say 5.00 52.00 60.00 1.70 DSR 0114 DSR 0101 Lime Mortar 1:2 ( 1 Slaked lime:2 fine sand) Description Unit Quantity Rate Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 3.01 800.00 Fine sand zone IV cum 1.43 650.00 Carriage of lime 3.01q=.48 cum cum 0.39 106.64 unslaked lime Carriage of coarse sand cum 1.43 115.92 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 297.00 Bhisti day 0.45 328.00 For Slaking of lime Beldar day 1.50 297.00 Bhisti day 1.50 328.00 Preparation of Lime Mortar including sieving of sand Beldar day 3.00 297.00 Bhisti day 3.00 328.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.8 Code DSR 0773 DSR 0983 DSR 2208 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Lit L.S Cost of 1 cum say 300.00 88.40 7,005.52 Amount 2,408.00 926.25 41.41 165.19 267.30 147.60 445.50 492.00 891.00 984.00 1.00 800.00 800.00 10.00 52.00 60.00 1.70 600.00 88.40 8,256.64 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. 3.9 Code DSR 0773 DSR 0982 DSR 2208 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 DSR 0114 DSR 0101 Lime Mortar 1:3 ( 1 Slaked lime :3 Coarse sand) Description Unit Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal Coarse sand zone III cum Carriage of lime cum Carriage of coarse sand cum LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day Quantity Rate Amount 3.01 1.43 0.39 1.43 800.00 1,120.00 106.64 106.64 2,408.00 1,596.00 41.41 151.96 0.90 0.45 297.00 328.00 267.30 147.60 1.50 1.50 297.00 328.00 445.50 492.00 2.00 2.00 297.00 328.00 594.00 656.00 Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries Lit L.S Cost of 1 cum say 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 7,588.17 DSR 0114 DSR 0101 Lime Mortar 1:1:2 ( 1 Slaked Lime: 1 Surkhi:2 Coarse sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.356 cum. of lime putty = 2.3 q of unslaked lime) Un Slaked Lime Quintal 2.30 Surkhi cum 0.36 Coarse sand zone III cum 0.71 Carriage of lime cum 0.30 Carriage of surkhi cum 0.36 Carriage of coarse sand cum 0.48 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 2.00 Bhisti day 2.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.10 Code DSR 0773 DSR 1182 DSR 1182 DSR 2208 DSR 2266 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 3.11 Code DSR 0773 DSR 1182 DSR 1182 DSR 2208 DSR 2266 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 DSR 0114 Lit L.S Cost of 1 cum say Rate Amount 800.00 700.00 1,120.00 106.64 106.64 106.64 1,840.00 249.20 797.44 31.64 37.96 50.65 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 6,397.70 Lime Mortar 1:1:2 ( 1 Slaked Lime: 1 Surkhi:2 Fine sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.356 cum. of lime putty = 2.3 q of unslaked lime) Un Slaked Lime Quintal 2.30 Surkhi cum 0.36 Fine sand zone IV cum 1.07 Carriage of lime cum 0.30 Carriage of surkhi cum 0.36 Carriage of sand cum 1.07 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 3.00 Rate Amount 800.00 700.00 650.00 106.64 106.64 106.64 1,840.00 249.20 694.20 31.64 37.96 113.89 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 891.00 DSR 0101 Bhisti day 3.00 328.00 984.00 M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00 M Rate DSR 9999 Fuel cost for running the miller Sundries Lit 10.00 60.00 600.00 L.S 50.00 1.70 85.00 Cost of 1 cum say 7,679.30 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. DSR 0114 DSR 0101 Lime Mortar 1:3 ( 1 Slaked lime: 3 Fine sand) Description Unit Quantity Rate Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 3.01 800.00 Fine Sand zone(IV) cum 2.14 650.00 Carriage of lime cum 0.39 106.64 Carriage of fine sand cum 2.14 106.64 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 297.00 Bhisti day 0.45 328.00 For Slaking of lime Beldar day 1.50 297.00 Bhisti day 1.50 328.00 Preparation of Lime Mortar including sieving of sand Beldar day 3.00 297.00 Bhisti day 3.00 328.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.13 Code DSR 3.15 Lime Mortar 1:2 ( 1 Slaked lime :2 Marble dust) Description Unit Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal Marble dust cum Carriage of lime cum Carriage of marble dust and/or marble cum chips LABOUR: For measuring, carrying, depositing and mixing Beldar day Bhisti day 3.12 Code DSR 0773 DSR 0983 DSR 2208 DSR 2261 DSR 0114 DSR 0101 DSR 0114 DSR 0101 1.00 800.00 Amount 2,408.00 1,389.38 41.41 227.94 267.30 147.60 445.50 492.00 891.00 984.00 800.00 Lit 10.00 60.00 600.00 L.S 52.00 1.70 88.40 Cost of 1 cum say 8,782.53 Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which results in more man days and use of machines. DSR 0773 DSR 0784 DSR 2208 DSR 2268 DSR 0114 DSR 0101 Quantity Rate Amount 3.01 0.95 0.39 800.00 1,000.00 106.64 2,408.00 950.00 41.09 0.95 106.64 101.31 0.90 0.45 297.00 328.00 267.30 147.60 DSR 0114 DSR 0101 For Slaking of lime Beldar day Bhisti day Preparation of Lime Mortar including sieving of sand Beldar day Bhisti day M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.14 Code DSR 3.15 DSR 0114 DSR 0101 Kafgi Lime Mortar 3:4: 8( 3Slaked lime:4 coarse sand: 8 surkhi) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) i.e 0.28 cum of lime putty is 60% of .475 cum Un Slaked Lime Quintal 1.81 Coarse sand zone III cum 0.37 Surkhi cum 0.75 Carriage of lime cum 0.23 Carriage of coarse sand zone III cum 0.37 Carriage of surkhi cum 0.75 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 2.00 Bhisti day 2.00 M Rate Running cost for upkeep of mortar mill day M Rate Fuel cost for running the miller Lit Hire and running charges of mechanical L.S mixer Sundries L.S Cost of 1 cum say DSR 0114 DSR 0101 DSR 0773 DSR 0982 DSR 1182 DSR 2208 DSR 2203 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 DSR 9999 DSR 9999 3.14.1 3.16 DSR 0367 DSR 2209 Lit L.S Cost of 1 cum say Khafgi mix with cement 8:1(8 Khafgi: 1cement) Khafgi mix cum Portland cement tonne Carriage of cement tonne Cost of 1 cum say 1.50 1.50 297.00 328.00 445.50 492.00 2.00 2.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 6,891.19 Rate Amount 800.00 1,120.00 700.00 106.64 106.64 106.64 1,444.80 414.40 525.00 24.84 39.46 79.98 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 60.00 300.00 26.91 1.70 45.75 16.22 1.70 27.58 5,904.21 1.20 0.21 0.21 5,904.21 6,600.00 94.8 7,085.05 1,412.40 20.29 8,517.74 A special mix known as khafgi is applied over the jack-arch structure to give a firm cover and good sealant against rainwater penetration and to improve the structural and heat insulation properties of the roof. Khafgi is prepared with 3 parts hydrated lime, 4 parts of coarse sand and 8 parts of burnt clay bricks crushed into 20mm size particles. 8 parts of the khafgi are combined with 1 part of ordinary cement. The resulting mixture is then mixed thoroughly with water to give a workable paste that is applied over the top surface of the roof. This method is practised in Sudan recommended by UNESCO. Source: Rural housing website DSR 0114 DSR 0101 Lime Mortar 1:3:6 ( 1 slaked lime:3 surkhi:6 course sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 0.90 Coarse sand zone III cum 0.85 Surkhi cum 0.43 Carriage of lime cum 0.12 Carriage of coarse sand cum 0.85 Carriage of surkhi cum 0.43 LABOUR: For measuring, carrying, depositing and mixing Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Bhisti day 1.50 Preparation of Lime Mortar including sieving of sand Beldar day 2.00 Bhisti day 2.00 M Rate Running cost for upkeep of mortar mill day M Rate DSR 9999 Fuel cost for running the miller Sundries 3.16 Code ISOR 2.2 DSR 0114 DSR 0101 Mud Mortar 1:3:1( 1 Slaked lime:3 Mud:1 course sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: (0.475 cum. of lime putty = 3.01 q of unslaked lime) Un Slaked Lime Quintal 1.80 Coarse sand zone III cum 0.28 Mud cum 0.85 Carriage of lime cum 0.23 Carriage of coarse sand cum 0.28 Carriage of mud cum 0.85 LABOUR: For measuring, carrying, depositing and mixing Mason First class day 1.00 Beldar day 0.90 Bhisti day 0.45 For Slaking of lime Beldar day 1.50 Preparation of Mud Mortar including sieving of sand Beldar day 2.00 Bhisti day 2.00 M Rate For Mixing and Kneading the mortar 3.15 Code ISOR 2.2 DSR 0773 DSR 0983 DSR 1182 DSR 2208 DSR 2261 DSR 2266 DSR 0114 DSR 0101 DSR 0114 DSR 0101 DSR 0773 DSR 0983 DSR 0811 DSR 2208 DSR 2261 DSR 2266 DSR 0123 DSR 0114 DSR 0101 DSR 0114 Lit L.S Cost of 1 cum say day Rate Amount 800.00 1,120.00 700.00 106.64 106.64 106.64 719.87 954.24 298.20 12.38 90.86 45.43 297.00 328.00 267.30 147.60 297.00 328.00 445.50 492.00 297.00 328.00 594.00 656.00 0.50 800.00 400.00 5.00 52.00 60.00 1.70 300.00 88.40 5,511.77 0.50 Rate Amount 800.00 225.00 60.00 106.64 106.64 106.64 1,439.73 63.90 51.12 24.76 30.29 90.86 393.00 297.00 328.00 393.00 267.30 147.60 297.00 445.50 297.00 328.00 594.00 656.00 800.00 400.00 DSR 0114 DSR 9999 3.17 Code DSR 0811 DSR 0123 DSR 0114 DSR 0101 DSR 9999 Beldar Sundries day L.S Cost of 1 cum say 1.00 52.00 297.00 1.70 297.00 88.40 4,989.45 Mud Mortar Description Details of cost for 1 cum. MATERIAL: Mud (dry) LABOUR: Mason First class Beldar Bhisti Sundries Unit cum day day day L.S Cost of 1 cum say Quantity Rate Amount 1.08 60.00 64.80 1.00 0.63 0.32 6.45 393.00 297.00 328.00 1.70 393 187.11 103.32 10.97 759.20 4.0 LIME CONCRETE 4.1 4.1.1 Code DSR 0293 Providing and laying lime concrete excluding cost of centring and shuttering With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1 surkhi : 1 fine sand Description Unit Quantity Rate Amount Details of cost for 1 cum. MATERIAL: Stone Aggregate (Single size) : 40 mm nominal size (0.63 cum-7.5% for voids i.e. 0.04 = 0.56 cum) cum 0.58 1,000.00 580.00 cum 0.27 1,200.00 324.00 cum 0.15 1,050.00 157.50 cum 0.58 115.92 67.23 cum 0.42 106.64 44.79 cum 0.46 8,232.80 3,787.09 DSR 0114 DSR 0115 DSR 0101 DSR 0123 DSR 0125 Stone Aggregate (Single size) :20 mm nominal size Stone Aggregate (Single size) :10 mm nominal size Carriage of stone aggregate 40 mm nominal size and above Carriage of stone aggregate below 40 mm nominal size Lime Mortar 1Lime putty:1 surkhi: 1 Fine sand LABOUR: Beldar Coolie Bhisti Mason (brick layer) 1 st class Mason (brick layer)2nd class day day day day day 1.35 1.17 1.05 0.09 0.09 297.00 297.00 328.00 393.00 361.00 400.95 347.49 344.40 35.37 32.49 DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 114.40 14.30 1.70 1.70 194.48 24.31 6,424.10 64.24 6,488.34 973.25 7,461.59 DSR 0295 DSR 0297 DSR 2206 DSR 2202 3.2 LS LS Cost of 1 cum 4.1.2 Code DSR 0293 With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1 surkhi Description Unit Quantity Rate Amount Details of cost for 1 cum. MATERIAL: Stone Aggregate (Single size) : 40 mm nominal size (0.63 cum-7.5% for voids i.e. 0.04 = 0.56 cum) cum 0.58 1,000.00 580.00 cum 0.22 1,200.00 264.00 cum 0.11 1,050.00 115.50 cum 0.58 115.92 67.23 cum 0.33 106.64 35.19 cum 0.46 6,806.02 3,130.77 DSR 0114 DSR 0115 DSR 0101 DSR 0123 DSR 0125 Stone Aggregate (Single size) :20 mm nominal size Stone Aggregate (Single size) :10 mm nominal size Carriage of stone aggregate 40 mm nominal size and above Carriage of stone aggregate below 40 mm nominal size Lime Mortar 1Lime putty:1 surkhi: 1 coarse sand LABOUR: Beldar Coolie Bhisti Mason (brick layer) 1 st class Mason (brick layer)2nd class day day day day day 1.35 1.17 1.05 0.09 0.09 297.00 297.00 328.00 393.00 361.00 400.95 347.49 344.40 35.37 32.49 DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 114.40 14.30 1.70 1.70 194.48 24.31 5,656.18 56.56 5,712.74 856.91 6,569.66 DSR 0295 DSR 0297 DSR 2206 DSR 2202 3.3 LS LS Cost of 1 cum 4.1.3 Code DSR 0293 DSR 0295 DSR 0297 DSR 2206 DSR 2202 3.4 DSR 0114 DSR 0115 DSR 0101 With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1.5 surkhi : 1.5 coarse sand Description Unit Quantity Rate Amount Details of cost for 1 cum. MATERIAL: Stone Aggregate (Single size) : 40 mm nominal size (0.63 cum-7.5% for voids i.e. 0.04 = 0.56 cum) Stone Aggregate (Single size) :20 mm nominal size Stone Aggregate (Single size) :10 mm nominal size Carriage of stone aggregate 40 mm nominal size and above Carriage of stone aggregate below 40 mm nominal size Lime Mortar 1 Slaked Lime :1.5 surkhi: 1.5 coarse sand LABOUR: Beldar Coolie Bhisti day day day cum 0.58 1,000.00 580.00 cum 0.22 1,200.00 264.00 cum 0.11 1,050.00 115.50 cum 0.58 115.92 67.23 cum 0.33 106.64 35.19 cum 0.46 6,319.53 2,906.98 1.35 1.17 1.05 297.00 297.00 328.00 400.95 347.49 344.40 DSR 0123 DSR 0125 Mason (brick layer) 1 st class Mason (brick layer)2nd class day day 0.09 0.09 393.00 361.00 35.37 32.49 DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 114.40 14.30 1.70 1.70 194.48 24.31 5,432.40 54.32 5,486.72 823.01 6,309.73 LS LS Cost of 1 cum 4.2 Code Providing and laying lime concrete with graded brick aggregate 50 mm nominal size and 50% mortar comprising of 1 lime putty : 2 coarse sand rammed excluding cost of centring and shuttering Description Detail of cost for 1 cum Materials Unit M Rate Common burnt clay F.P.S. (non No modular) of bricks class designation 10 DSR 2260 Carriage of brick aggregate 3.1.5 DSR 0114 DSR 0123 DSR 0114 DSR 0101 Quantity Rate Amount 247.00 7.00 1,729.00 Cum 1.00 115.92 115.92 Lime mortar 1 lime putty:2 coarse sand Cum 0.50 7,005.52 3,502.76 day 1.25 297.00 371.25 day day day 0.50 3.00 0.50 393.00 297.00 328.00 196.50 891.00 164.00 Labour For Breaking bricks to make 40mm and 50mm size aggregates. Beldar Labour for laying lime concrete Mason (brick layer) 1 st class Beldar Bhisti Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing mason DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00 M Rate M Rate DSR 9999 DSR 9999 Washing soap Alum Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 12.00 4.00 114.40 14.30 125.00 75.00 1.70 1.70 Kg Kg LS LS 1,500.00 300.00 194.48 24.31 9,850.22 98.50 9,948.72 1,492.31 Cost of 1 cum 11,441.03 Brick aggregates available in the market are of inferior quality. So in conservation bricks are procurred and broken in to required sizes. 4.3 Code DSR 15.1 50mm lime concrete flooring laid on existing base over the damaged floor up to 40mm average Description Unit Quantity Rate Amount Detail of cost for 10 Sqm Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in- charge. Sqm 10.50 11.26 118.21 247.00 7.00 1,729.00 Cum Cum 0.50 0.50 115.92 6,565.11 57.96 3,282.55 day 1.40 297.00 415.80 day day day 0.50 3.00 0.50 393.00 297.00 328.00 196.50 891.00 164.00 Materials M Rate DSR 2260 DSR 0114 DSR 0123 DSR 0114 DSR 0101 Common burnt clay F.P.S. (non No modular) of bricks class designation 10 Carriage of brick aggregate 3.5 Lime mortar 1 Slaked lime :2 surkhi Labour For Breaking bricks to make 25mm size aggregates. Beldar Labour for laying lime concrete Mason (brick layer) 1 st class Beldar Bhisti Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing mason DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 114.40 14.30 1.70 1.70 194.48 24.31 7,736.60 77.37 7,813.97 1,172.10 9,104.27 Cost of 1 Sqm 910.43 Brick aggregates available in the market are of inferior quality. So in conservation bricks are procurred and broken in to required sizes. 4.4 LS LS Providing and laying lime concrete with graded brick bats and 50% lime mortar 1:1:1 ( 1 Slaked lime : 1 surkhi:1 coarse sand) rammed and finished with gur and belgiri treatment excluding cost of centring and shuttering (Thickness 100mm) Detail of cost for 10 Sqm Materials DSR 0362 Brick Bats DSR 2260 Carriage of brick aggregate Lime mortar 1:1:1 (1 Slaked lime :1 3.3 surkhi:1 coarse sand) Labour DSR 0114 Beldar DSR 0123 Mason (brick layer) 1 st class DSR 0101 Bhisti Cum Cum 0.12 1.00 500.00 115.92 60.00 115.92 Cum 0.60 6,806.02 4,083.61 day day day 5.50 0.50 0.50 297.00 393.00 328.00 1,633.50 196.50 164.00 Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing mason DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00 125.00 1.70 212.50 DSR 9999 4.5 Sundries including washing soap, Alum, LS Gur, Belgiri Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 7,247.03 72.47 7,319.50 1,097.92 8,417.42 841.74 Providing and laying lime concrete with broken brick aggregate and 50% lime mortar 1:1:1 ( 1 Slaked lime : 1 surkhi:1 coarse sand) rammed and finished with gur and belgiri treatment excluding cost of centring and shuttering (Thickness 100mm) Detail of cost for 10 Sqm Materials M Rate Common burnt clay F.P.S. (non No modular) of bricks class designation 10 247.00 7.00 1,729.00 1.00 115.92 115.92 0.60 6,806.02 4,083.61 125.00 1.70 212.50 1.40 297.00 415.80 day day day 5.50 0.50 0.50 297.00 393.00 328.00 1,633.50 196.50 164.00 DSR 2260 Carriage of brick aggregate Cum Lime mortar 1:1:1 (1 Slaked lime :1 3.3 Cum surkhi:1 coarse sand) Sundries Washing soap,Alum, DSR 9999 LS Gur,Belgiri, Jute San Labour For Breaking bricks to make 25mm size aggregates. DSR 0114 Beldar day DSR 0114 DSR 0123 DSR 0101 Beldar Mason (brick layer) 1 st class Bhisti Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 114.40 14.30 1.70 1.70 194.48 24.31 9,550.62 95.51 9,646.13 1,446.92 11,093.04 1,109.30 LS LS Cost of 1 Sqm 4.6 Code M Rate Lime concrete terracing on roofs with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1 Slaked lime : 2 surkhi) rammed and finished with gur and belgiri treatment complete including rounding of junctions with parpaet wall complete Description Detail of cost for 1 cum Materials Unit Common burnt clay F.P.S. (non No modular) of bricks class designation 10 DSR 2260 Carriage of brick aggregate Cum 3.5 Lime mortar 1 lime putty:2 surkhi Cum Sundries Washing soap,Alum, DSR 9999 LS Gur,Belgiri, Jute Labour For Breaking bricks to make 25mm size aggregates. DSR 0114 Beldar day Labour for laying lime concrete DSR 0123 Mason (brick layer) 1 st class day DSR 0114 Beldar day DSR 0101 Bhisti day Quantity Rate Amount 247.00 7.00 1,729.00 1.00 0.50 115.92 6,565.11 115.92 3,282.55 125.00 1.70 212.50 1.25 297.00 371.25 0.50 3.00 0.50 393.00 297.00 328.00 196.50 891.00 164.00 Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing mason DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 114.40 14.30 1.70 1.70 194.48 24.31 8,042.51 80.43 8,122.94 1,218.44 9,341.38 LS LS Cost of 1 Cum 4.7 Code M Rate DSR 2260 Lime concrete on floors with 25mm nominal size brick aggregate and 50% lime mortar 1:3:6 (1lime putty: 3 surkhi:6 Coarse Sand) rammed and finished with gur and belgiri treatment Description Detail of cost for 1 cum Materials Unit Common burnt clay F.P.S. (non No modular) of bricks class designation 10 Carriage of brick aggregate Cum Lime mortar 1 Slaked lime :3 surkhi:6 3.15 Cum Coarse Sand Sundries Washing soap,Alum, DSR 9999 LS Gur,Belgiri, Jute Labour For Breaking bricks to make 25mm size aggregates. Quantity Rate Amount 247.00 7.00 1,729.00 1.00 115.92 115.92 0.50 5,511.77 2,755.88 125.00 1.70 212.50 DSR 0114 Beldar Labour for laying lime concrete Mason (brick layer) 1 st class Beldar Bhisti DSR 0123 DSR 0114 DSR 0101 day 1.25 297.00 371.25 day day day 0.50 3.00 0.50 393.00 297.00 328.00 196.50 891.00 164.00 Additional labour for levelling,ramming, beating with thapies and finishing smooth without adding any mortar for finishing mason DSR 0114 DSR 0101 Beldar Bhisti day day 1.00 0.50 297.00 328.00 297.00 164.00 DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00 DSR 9999 DSR 9999 Scaffolding Sundries Total Add water charges 1% Total Add CPOH @ 15% 114.40 14.30 1.70 1.70 194.48 24.31 7,515.84 75.16 7,591.00 1,138.65 8,729.65 LS LS Cost of 1 Cum Plinth Area Protection using Lime concrete and brick tiles around the building to prevent entry of water by dampness and capilarry rise 4.8 Code Description Detail of cost for 1 Sqm Materials 4.7 DSR 7266 Unit Providing and laying Lime concrete 1:3:6 up to150mm thick Cum Brick tiles of size 250mmx250mm 1000 Nos DSR 0123 DSR 0114 DSR 0101 DSR 9999 Sundries Labour for laying brick tiles Mason (brick layer) 1 st class Beldar Bhisti Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Rate Amount 0.18 8,729.65 1,571.34 18.00 12,150.00 218.70 0.03 7,588.17 204.88 LS 23.00 1.70 39.10 day day day LS 0.50 1.00 0.50 114.40 393.00 297.00 328.00 1.70 196.50 297.00 164.00 194.48 2,886.00 28.86 2,914.86 437.23 3,352.09 3.9 Lime mortar 1 lime putty:3 coarse sand Cum DSR 9999 Quantity Cost of 1 Sqm 5.0 BRICK WORK M Rate Traditional brick masonry in nanakshahi or lakhori bricks in lime mortar in proportion similar to the Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Description Unit Quantity Rate Amount Details of cost for 1 cum. MATERIAL: Nanakshahi Lakhori Bricks of size 200x50x40 mm No 2500.00 12.00 30,000.00 3.3 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse sand) Cum DSR 2201 DSR 9999 Carriage of bricks Sundries LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Total Add water charges 1% Total Add CPOH @ 15% 5.1 Code DSR 0123 DSR 0124 DSR 0115 DSR 0114 1000 nos. L.S day day day day 0.20 8,232.80 1,646.56 2500.00 48.00 284.39 1.70 710.98 81.60 0.54 0.54 2.06 0.30 393.00 361.00 297.00 328.00 212.22 194.94 610.34 98.40 33,555.03 335.55 33,890.58 5,083.59 38,974.17 Cost of 1 Cum 5.2 Code DSR 6.9 Traditional Brick work in plain arches including centering and shuttering complete for span up to 6 metres in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 coarse sand). M Rate Description Details of cost for 1 cum. MATERIAL: Nanakshahi Lakhori Bricks of size 200x50x40 mm No 3.3 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum DSR 2201 DSR 9999 Carriage of bricks Sundries Centering and Shuttering: Taking a semi circular arch 3.6m span, 3.6m long and 0.40m thick Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum Area per cum = 20.37/9.05 = 2.25 sqm Centering and shuttering including strutting, propping DSR 5.9.9. etc. and removal of form for Arches, domes, vaults up to 6 m span. DSR 9999 Scaffolding LABOUR DSR 0123 Mason (brick layer) 1 st class DSR 0124 Mason (brick layer) 2nd class DSR 0115 Coolie DSR 0114 Bhisti DSR 0115 Coolie Extra for lifting materials Total Add Water Charges @ 1% except on formwork Total Add CPOH @ 15% except on formwork Cost of 1 Cum Unit Quantity Rate Amount 2500.00 12.00 30,000.00 0.38 8,232.80 3,087.30 2500.00 2.73 284.39 1.70 710.98 4.64 2.25 1,006.65 2,264.96 L.S 18.85 1.70 32.05 day day day day day 0.80 0.80 3.44 0.30 1.70 393.00 361.00 297.00 297.00 297.00 312.44 287.00 1,020.20 89.10 503.42 38,312.06 360.47 38,672.53 5,461.14 44,133.67 1000 nos. L.S Sqm 5.3 Code DSR 6.9 DSR 2602 Traditional Brick work in gauged arches including centering and shuttering complete for span up to 6 metres in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 coarse sand). Description Unit Details of cost for 1 Cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class No designation 7.5 30,000.00 0.38 8,232.80 3,087.30 2500.00 2.73 284.39 1.70 710.98 4.64 2.25 1,006.65 2,264.96 L.S 18.85 1.70 32.05 day day day day day 1.70 1.36 5.30 0.24 1.36 393.00 361.00 297.00 297.00 297.00 666.14 489.52 1,575.29 71.28 402.73 39,304.87 370.40 39,675.27 5,611.55 45,286.82 Cum DSR 2201 DSR 9999 Carriage of bricks Sundries Centering and Shuttering: Taking a semi circular arch 3.6m span, 3.6m long and 0.40m thick Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum Area per cum = 20.37/9.05 = 2.25 sqm Centering and shuttering including strutting, propping etc. and removal of form for Arches, domes, vaults up to 6 m span. Scaffolding LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Coolie Extra for lifting materials Total Add Water Charges @ 1% except on formwork Total Add CPOH @ 15% except on formwork Cost of 1 Cum 1000 nos. L.S DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 0115 5.4 Code M Rate Sqm Brick work with bricks of class designation 7.5 in foundation and plinth in Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Description Unit Quantity Details of cost for 1 cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class No 494.00 designation 7.5 3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum DSR 2201 DSR 9999 Carriage of bricks Sundries LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Total Add water charges 1% Total Add CPOH @ 15% 1000 nos. L.S DSR 0123 DSR 0124 DSR 0115 DSR 0114 day day day day Cost of 1 Cum Amount 12.00 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) DSR 9999 Rate 2500.00 3.2 DSR 5.9.9 Quantity Rate Amount 7.00 3,458.00 0.38 8,232.80 3,087.30 494.00 3.73 284.39 1.70 140.49 6.34 0.43 0.43 1.64 0.24 393.00 361.00 297.00 328.00 169.78 155.95 488.27 78.72 7,584.85 75.85 7,660.69 1,149.10 8,809.80 Brick work with bricks of class designation 7.5 in superstructure up to two level Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Code Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 1 cum. DSR 6.4 MATERIAL: Prevailing Common burnt clay F.P.S. (non modular) of bricks class 1 494.00 7.00 3,458.00 Rate designation 7.5 5.5 3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum DSR 2201 DSR 9999 Carriage of bricks Sundries LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Scaffolding Coolie Total Add water charges 1% Total Add CPOH @ 15% 1000 nos. L.S DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 9999 DSR 0115 day day day day L.S day 0.38 8,232.80 3,087.30 494.00 2.73 284.39 1.70 140.49 4.64 0.56 0.56 2.16 0.24 22.36 1.36 393.00 361.00 297.00 328.00 1.70 297.00 221.65 203.60 641.52 78.72 38.01 402.73 8,276.67 82.77 8,359.44 1,253.92 9,613.35 Cost of 1 Cum 5.6 Code DSR 7.4.1 DSR 0124 DSR 0115 Extra for Brickwork in Square or rectangular pillars Description Details of cost for 1 cum. LABOUR Mason (brick layer) 2nd class Coolie Total Add water charges 1% Total Add CPOH @ 15% Unit day day Quantity 0.87 0.41 Rate 361.00 297.00 Cost of 1 Cum 5.7 314.07 120.29 434.36 4.34 438.70 65.80 504.50 Providing half brick masonry with bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime putty:1 surkhi:1 fine sand) Code DSR 6.13 Description Unit Details of cost for 10 sqm. MATERIAL: Prevailing Common burnt clay F.P.S. (non modular) of bricks class No Rate designation 7.5 3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum DSR 2201 DSR 9999 Carriage of bricks Sundries LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Scaffolding Coolie 1000 nos. L.S DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 9999 DSR 0115 Amount day day day day L.S day Quantity Rate Amount 565.00 7.00 3,955.00 0.42 8,232.80 3,457.78 565.00 13.52 284.39 1.70 160.68 22.98 0.72 0.72 2.40 0.84 22.36 1.55 393.00 361.00 297.00 328.00 1.70 297.00 282.96 259.92 712.80 275.52 38.01 459.76 Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 9,625.41 96.25 9,721.66 1,458.25 11,179.91 1,117.99 Cost of 1 Sqm 5.8 Brick work in plain arches including centering and shuttering complete for span up to 6 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand). Code DSR 6.9 Description Unit Details of cost for 1 cum. MATERIAL: Prevailing Common burnt clay F.P.S. (non modular) of bricks class No Rate designation 7.5 3.1.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) DSR 2201 DSR 9999 Carriage of bricks Sundries Centering and Shuttering: Taking a semi circular arch 3.6m span, 3.6m long and 0.40m thick Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum Area per cum = 20.37/9.05 = 2.25 sqm Centering and shuttering including strutting, propping DSR 5.9.9. etc. and removal of form for Arches, domes, vaults up to 6 m span. DSR 9999 Scaffolding LABOUR DSR 0123 Mason (brick layer) 1 st class DSR 0124 Mason (brick layer) 2nd class DSR 0115 Coolie DSR 0114 Bhisti DSR 0115 Coolie Extra for lifting materials Total Add Water Charges @ 1% except on formwork i.e on (7702.75-2264.96) Total Add CPOH @ 15% except on formwork i.e on (7723.882264.96) Cost of 1 Cum 5.9 Code DSR 6.9 DSR 2602 Quantity Rate Amount 494.00 7.00 3,458.00 0.38 9,142.95 3,428.61 494.00 2.73 284.39 1.70 140.49 4.64 2.25 1,006.65 2,264.96 L.S 18.85 1.70 32.05 day day day day day 0.64 0.64 2.75 0.24 1.36 393.00 361.00 297.00 328.00 297.00 249.95 229.60 816.16 78.72 402.73 11,105.90 Cum 1000 nos. L.S Sqm 88.41 11,194.31 1,339.40 12,533.71 Brick work in gauged arches including centering and shuttering complete for span up to 6 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand). Description Details of cost for 1 Cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class designation 7.5 Unit Quantity 1 3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum DSR 2201 Carriage of bricks 1000 nos. Rate Amount 538.00 7.00 3,766.00 0.38 9,142.95 3,428.61 538.00 284.39 153.00 DSR 9999 DSR 5.9.9 DSR 9999 DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 0115 Sundries Centering and Shuttering: Taking a semi circular arch 3.6m span, 3.6m long and 0.40m thick Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum Area per cum = 20.37/9.05 = 2.25 sqm Centering and shuttering including strutting, propping etc. and removal of form for Arches, domes, vaults up to 6 m span. Scaffolding LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Coolie Extra for lifting materials Total Add Water Charges @ 1% except on formwork i.e on (9228.47-2264.96) Total Add CPOH @ 15% except on formwork i.e on (9298.112264.96) Cost of 1 Cum L.S 2.73 1.70 4.64 Sqm 2.25 1,006.65 2,264.96 L.S 18.85 1.70 32.05 day day day day day 1.36 1.36 5.30 0.24 1.36 393.00 361.00 297.00 328.00 297.00 532.91 489.52 1,575.29 78.72 402.73 12,728.42 104.63 12,833.06 1,585.21 14,418.27 BRICK TILE WORK 5.10 Code DSR 6.18 DSR 1984 3.9 DSR 2207 DSR 9999 DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 9999 DSR 0115 Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in superstructure in lime mortar 1:6 (1 lime putty : 3 coarse sand). Description Details of cost for 1 Cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class designation 10 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Carriage of brick tiles Sundries LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Extra for lifting Scaffolding Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Cum Unit Quantity Rate Amount No 777.00 7.00 5,439.00 Cum 1000 nos. L.S 0.60 777.00 4.55 7,588.17 170.63 1.70 4,552.90 132.58 7.74 day day day day 1.08 1.08 2.16 0.24 393.00 361.00 297.00 328.00 424.44 389.88 641.52 78.72 L.S day 33.80 1.36 1.70 297.00 57.46 402.73 12,126.97 121.27 12,248.24 1,837.24 14,085.47 5.11 Code DSR 6.20 DSR 1984 3.9 DSR 2207 DSR 9999 DSR 5.9.9 DSR 9999 DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 0115 5.12 Code DSR 6.21 Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in plain arch work in lime mortar 1:4 (1 lime : 3 coarse sand) including centering and shuttering complete Description Details of cost for 1 Cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class designation 10 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Carriage of brick tiles Sundries Centering and Shuttering: Scaffolding LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Extra for lifting Coolie Total Add Water Charges @ 1% except on formwork i.e on (10311.21-2264.96) Total Add CPOH @ 15% except on formwork i.e on (10391.672264.96) Cost of 1 Cum Unit Quantity Rate Amount 1000 nos. 777.00 7.00 5,439.00 Cum 1000 nos. L.S Sqm L.S 0.53 777.00 5.46 2.25 18.85 7,588.17 170.63 1.70 1,006.65 1.70 3,983.79 132.58 9.28 2,264.96 32.05 day day day day 0.95 0.95 3.85 0.24 393.00 361.00 297.00 328.00 372.56 342.23 1,144.04 78.72 day 1.36 297.00 402.73 14,201.95 119.37 14,321.32 1,808.45 16,129.77 Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in plain arch work in lime mortar 1:4 (1 lime : 3 coarse sand) including centering and shuttering complete Description Details of cost for 1 Cum. MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class DSR 1984 designation 10 3.9 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) DSR 2207 Carriage of brick tiles DSR 9999 Sundries DSR 5.9.9. Centering and Shuttering: DSR 9999 Scaffolding LABOUR DSR 0123 Mason (brick layer) 1 st class DSR 0124 Mason (brick layer) 2nd class DSR 0115 Coolie DSR 0114 Bhisti Extra for lifting DSR 0115 Coolie Total Add Water Charges @ 1% except on formwork i.e on (11709.19-2264.96) Total Add CPOH @ 15% except on formwork Cost of 1 Cum Unit Quantity Rate Amount 1000 nos. 777.00 7.00 5,439.00 Cum 1000 nos. L.S Sqm L.S 0.35 777.00 5.46 2.25 18.85 7,588.17 170.63 1.70 1,006.65 1.70 2,655.86 132.58 9.28 2,264.96 32.05 day day day day 1.80 1.80 6.40 0.24 393.00 361.00 297.00 328.00 707.40 649.80 1,899.61 78.72 day 1.36 297.00 402.73 14,271.99 120.07 14,392.06 1,819.07 16,211.13 5.13 Code DSR 6.22 DSR 1984 3.1.9 DSR 2207 DSR 9999 DSR 0123 DSR 0124 DSR 0115 DSR 0114 DSR 0115 Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in lime mortar 1:3 (1 lime : 3 coarse sand) Description Details of cost for 10 Sqm MATERIAL: Common burnt clay F.P.S. (non modular) of bricks class designation 10 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Carriage of brick tiles Sundries & Scaffolding LABOUR Mason (brick layer) 1 st class Mason (brick layer) 2nd class Coolie Bhisti Extra for lifting Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Unit Quantity Rate Amount No 377.00 7.00 2,639.00 Cum 1000 nos. L.S 0.15 377.00 8.06 7,588.17 170.63 1.70 1,138.23 64.33 13.70 day day day day 1.13 1.13 2.26 0.40 393.00 361.00 297.00 328.00 443.30 407.21 670.03 129.89 day 1.55 297.00 459.76 5,965.44 59.65 6,025.10 903.76 6,928.86 692.89 6.0 MASONRY RANDOM RUBBLE MASONRY 6.1 Code Random rubble masonry with hard stones in foundation and plinth including levelling with lime concete (1 lime:3surkhi:6 coarse sand) with 40mm stone aggregate upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand) Description Details of cost for 1 cum. MATERIAL: DSR 1157 Stone for masonry work DSR 1154 Through and bond stone Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.00cum. + 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 sand) 3.15 Lime concrete (1:3:6) LABOUR DSR 0123 Mason (for plain stone work) First class DSR 0114 Beldar DSR 0115 Coolie DSR 0101 Bhisti DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Cum Unit Quantity Rate in Rs Amount in Rs DSR 7.1.1 6.2 Cum 100 nos. 1.00 7.00 700.00 1,200.00 700.00 84.00 Cum 1.16 125.47 145.55 Cum 0.33 6,806.02 2,245.99 Cum 0.20 5,511.77 1,102.35 day day day day L.S 1.28 1.28 0.85 0.11 4.42 393.00 297.00 297.00 328.00 1.70 504.61 381.35 253.04 35.42 7.51 5,459.83 54.60 5,514.42 827.16 6,341.59 Random rubble masonry with hard stones in superstructure including levelling with lime concete (1 lime:3surkhi:6coarse sand) with 40mm stone aggregate upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand) Details of cost for 1 cum. MATERIAL: DSR 1157 Stone for masonry work DSR 1154 Through and bond stone Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.00cum. + 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 sand) 3.15 Lime concrete (1:3:6) LABOUR DSR 0123 Mason (for plain stone work) First class DSR 0114 Beldar DSR 0115 Coolie DSR 0101 Bhisti Extra for lifting DSR 0115 Coolie DSR 9999 Sundries Total DSR 7.1.2 Cum 100 nos. 1.00 7.00 700.00 1,200.00 700.00 84.00 Cum 1.16 125.47 145.55 Cum 0.33 6,806.02 2,245.99 Cum 0.20 5,511.77 1,102.35 day day day day 1.61 1.74 0.85 0.11 393.00 297.00 297.00 328.00 631.94 516.78 253.04 35.42 day L.S 1.36 15.21 297.00 1.70 402.73 25.86 6,143.67 Add water charges 1% Total Add CPOH @ 15% 61.44 6,205.10 930.77 7,135.87 Cost of 1 Cum COURSED RUBBLE MASONRY Coursed rubble masonry in first sort with hard stones in foundation and plinth including Description Unit Quantity Rate Amount Details of cost for 1 cum. MATERIAL: DSR 1157 Stone for masonry work Cum 1.21 700.00 847.00 DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00 Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.21cum. + Cum 1.37 125.47 171.89 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 Cum 0.30 6,806.02 2,041.80 sand) LABOUR DSR 0123 Mason (for plain stone work) First class day 2.54 393.00 999.79 DSR 0114 Beldar day 1.49 297.00 441.94 DSR 0115 Coolie day 0.85 297.00 253.04 DSR 0101 Bhisti day 0.11 328.00 35.42 DSR 9999 Sundries L.S 13.52 1.70 22.98 Total 4,897.88 Add water charges 1% 48.98 Total 4,946.86 Add CPOH @ 15% 742.03 Cost of 1 Cum 5,688.89 6.3 Code DSR 7.1.1 6.4 Coursed rubble masonry in second sort with hard stones in foundation and plinth including levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime:1 surkhi:1 fine sand) Details of cost for 1 cum. MATERIAL: DSR 1157 Stone for masonry work DSR 1154 Through and bond stone Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.1cum. + 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 sand) LABOUR DSR 0123 Mason (for plain stone work) First class DSR 0114 Beldar DSR 0115 Coolie DSR 0101 Bhisti DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Cum DSR 7.1.1 Cum 100 nos. 1.10 7.00 700.00 1,200.00 770.00 84.00 Cum 1.26 125.47 158.09 Cum 0.30 6,806.02 2,041.80 day day day day L.S 2.11 1.49 0.85 0.11 13.52 393.00 297.00 297.00 328.00 1.70 830.02 441.94 253.04 35.42 22.98 4,637.30 46.37 4,683.67 702.55 5,386.22 Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two floor level Masonry work (first sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 Coarse sand) 6.5.1 Details of cost for 1 cum. DSR 7.8.1 MATERIAL: DSR 1157 Stone for masonry work Cum 1.21 700.00 847.00 DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00 Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.21cum. + Cum 1.37 125.47 171.89 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 Cum 0.30 6,806.02 2,041.80 sand) LABOUR DSR 0123 Mason Brick I Class day 2.86 361.00 1,031.02 DSR 0114 Beldar day 1.91 297.00 566.68 DSR 0115 Coolie day 0.85 297.00 253.04 DSR 0101 Bhisti day 0.11 328.00 35.42 Extra for lifting DSR 0115 Coolie day 1.36 297.00 402.73 DSR 9999 Sundries, Scaffolding L.S 37.70 1.70 64.09 Total 5,497.68 Add water charges 1% 54.98 Total 5,552.66 Add CPOH @ 15% 832.90 Cost of 1 Cum 6,385.56 6.5 Masonry work (second sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand) Details of cost for 1 cum. MATERIAL: DSR 1157 Stone for masonry work Cum 1.00 700.00 DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 Carriage of Soling stone & masonry stone DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1 cum. + Cum 1.16 125.47 0.16 cum. = 1.16 cum Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse 3.3 Cum 0.30 6,806.02 sand) LABOUR DSR 0123 Mason (for plain stone work) First class day 2.42 393.00 DSR 0114 Beldar day 1.91 297.00 DSR 0115 Coolie day 0.85 297.00 DSR 0101 Bhisti day 0.11 328.00 Extra for lifting DSR 0115 Coolie day 1.36 297.00 DSR 9999 Sundries, Scaffolding L.S 37.70 1.70 Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Cum 6.5.2 DSR 7.8.1 700.00 84.00 145.55 2,041.80 952.63 566.68 253.04 35.42 402.73 64.09 5,245.95 52.46 5,298.41 794.76 6,093.17 ASHLAR MASONRY 6.6 6.6.1 6.6.1.1 DSR 7.12.1.1 DSR 1160 Stone work in plain ashlar masonry in superstructure in lime mortar 1:1:1 (1 lime:1 surkhi:1 fine One Face dressed Red Sand Stone Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm Red sand stone block 10cudm 13.33 65.00 86.65 3.2 Lime MortAr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) DSR 2216 DSR 0115 DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 Cudm 4.67 8.23 38.41 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 30.659 kg = 0.031 t 0.03 94.80 2.94 day 0.02 297.00 4.46 day day day day day 0.09 0.01 0.04 0.02 0.04 393.00 393.00 297.00 297.00 328.00 34.58 2.36 13.07 6.53 14.43 day day day day day day L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 377.00 393.00 297.00 297.00 328.00 328.00 1.70 19.91 2.83 7.84 7.84 8.66 8.66 4.64 263.80 2.64 266.44 39.97 306.41 30,640.50 Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum White Sand Stone 6.6.1.2 Code Description Unit Details of cost for 1 cum. DSR 7.12.1.2 MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block 10cudm Quantity 13.33 Rate 70.00 Amount 93.31 3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) DSR 2216 DSR 0115 DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 Cudm 4.67 8.23 38.41 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 30.659 kg = 0.031 t 0.03 94.80 2.94 day 0.02 297.00 4.46 day day day day day 0.09 0.01 0.04 0.02 0.04 393.00 393.00 297.00 297.00 328.00 34.58 2.36 13.07 6.53 14.43 day day day day day day L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 361.00 393.00 297.00 297.00 328.00 328.00 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 269.62 2.70 272.32 40.85 313.17 31,316.52 Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum Both Face dressed 6.6.2 Red Sand Stone 6.6.2.1 Code Description Unit DSR 7.12.1.1 Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1160 Red sand stone block 10cudm 3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) DSR 2216 DSR 0115 DSR 0123 DSR 0102 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class Quantity Rate Amount 13.33 65.00 86.65 Cudm 4.67 8.23 38.41 tonne 0.03 94.80 2.94 day 0.02 297.00 4.46 day day 0.18 0.01 393.00 393.00 69.17 4.72 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum day day day 0.09 0.04 0.09 297.00 297.00 328.00 26.14 13.07 28.86 day day day day day day L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 361.00 393.00 297.00 297.00 328.00 328.00 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 333.93 3.34 337.27 50.59 387.86 38,786.24 White Sand Stone 6.6.2.2 Code Description Unit DSR 7.12.1.2 Details of cost for 1 cum. MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block 10cudm 3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) DSR 2216 DSR 0115 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Total Add water charges 1% Total Quantity Rate Amount 13.33 70.00 93.31 Cudm 4.67 8.23 38.41 tonne 0.03 94.80 2.94 day 0.02 297.00 4.46 day day day day day 0.18 0.01 0.09 0.04 0.09 361.00 393.00 297.00 297.00 328.00 63.54 4.72 26.14 13.07 28.86 day day day day day day L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 393.00 393.00 297.00 297.00 328.00 328.00 1.70 20.75 2.83 7.84 7.84 8.66 8.66 4.64 336.65 3.37 340.02 Add CPOH @ 15% Cost of 0.01 Cum 51.00 391.02 39,102.47 Cost of 1 Cum Lime Stone 6.6.2.3 DSR 7.12.1.1 Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 0.01.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% =0.133 cudm. Total = 13.33 cudm M Rate Lime sand stone block Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.2 & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 Mason (for plain stone work) First class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani Fixing charges DSR 0125 Mason (for plain stone work) 2nd class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani DSR 0101 Bhisti DSR 9999 Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum 6.7 6.7.1 6.7.1.1 Code DSR 1160 No 0.90 34.00 30.60 Cudm 8.00 8.78 70.24 tonne 0.03 94.80 2.94 day day day day day 0.18 0.01 0.09 0.04 0.09 393.00 393.00 297.00 297.00 328.00 69.17 4.72 26.14 13.07 28.86 day day day day day day L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 361.00 393.00 297.00 297.00 328.00 328.00 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 305.26 3.05 308.32 46.25 354.57 35,456.51 Stone work plain ashlar in arches in super structure in lime mortar 1:3 (1 lime : 3 coarse sand) including centring, shuttering and pointing with lime mortar and an admixture of pigment matching the stone shade One Face dressed Red Sand Stone Description Unit MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm Red sand stone block 10cudm Quantity 13.33 Rate 65.00 Amount 86.65 3.9 DSR 2216 DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying & pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum White Sand Stone 6.7.1.2 DSR 7.12.1.2 Details of cost for 1 cum. MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block Lime Mortar 1:3 (1 Lime:3 coarse Sand) for laying 3.9 & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 Mason (for plain stone work) First class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani Fixing charges DSR 0125 Mason (for plain stone work) 2nd class Cudm 8.00 7.59 60.69 tonne 0.03 94.80 2.94 day day day day day 0.09 0.01 0.04 0.02 0.04 393.00 393.00 297.00 297.00 328.00 34.58 2.36 13.07 6.53 14.43 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 13.52 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 22.98 day 0.02 297.00 4.46 308.22 3.08 311.30 46.70 358.00 35,799.80 13.33 70.00 93.31 Cudm 8.00 7.59 60.69 tonne 0.03 94.80 2.94 day day day day day 0.09 0.01 0.04 0.02 0.04 393.00 393.00 297.00 297.00 328.00 34.58 2.36 13.07 6.53 14.43 day 0.05 361.00 19.06 10cudm DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum Both Faces dressed 6.7.2 Red Sand Stone 6.7.2.1 DSR 7.12.1.1 Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1160 Red sand stone block Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.9 & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 Mason (for plain stone work) First class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani Fixing charges DSR 0125 Mason (for plain stone work) 2nd class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani DSR 0101 Bhisti DSR 9999 Scaffolding DSR 9999 Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = DSR 0115 0.015 Coolie Total Add water charges 1% Total day day day day day L.S L.S 0.01 0.03 0.03 0.03 0.03 2.73 13.52 393.00 297.00 297.00 328.00 328.00 1.70 1.70 2.83 7.84 7.84 8.66 8.66 4.64 22.98 day 0.02 297.00 4.46 314.89 3.15 318.03 47.71 365.74 36,573.94 13.33 65.00 86.65 Cudm 8.00 7.59 60.69 tonne 0.03 94.80 2.94 day day day day day 0.18 0.01 0.09 0.04 0.09 393.00 393.00 297.00 297.00 328.00 69.17 4.72 26.14 13.07 28.86 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 13.52 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 22.98 day 0.02 297.00 4.46 379.20 3.79 382.99 10cudm Add CPOH @ 15% Cost of 0.01 Cum 57.45 440.44 44,043.66 Cost of 1 Cum White Sand Stone 6.7.2.2 DSR 7.12.1.2 Details of cost for 1 cum. MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block 10cudm Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.9 Cudm & pointing DSR 2216 DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 6.8 6.8.1 6.8.1.1 DSR 7.14.1.1 13.33 70.00 93.31 8.00 7.59 60.69 0.03 94.80 2.94 day day day day day 0.18 0.01 0.09 0.04 0.09 393.00 393.00 297.00 297.00 328.00 69.17 4.72 26.14 13.07 28.86 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 13.52 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 22.98 day 0.02 297.00 4.46 385.86 3.86 389.72 58.46 448.18 44,817.80 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 30.659 kg = 0.031 t LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum Stone work plain ashlar in domes in lime mortar 1:3 (1 lime : 3 coarse sand) including centring, One Face dressed Red Sand Stone Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1160 Red sand stone block Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.9 & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 Mason (for plain stone work) First class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani Fixing charges DSR 0125 Mason (for plain stone work) 2nd class DSR 0102 Blacksmith 1st Class DSR 0114 Beldar DSR 0115 Coolie DSR 0100 Bandhani DSR 0101 Bhisti DSR 9999 Scaffolding DSR 9999 Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = DSR 0115 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum 10cudm 13.33 65.00 86.65 Cudm 8.00 7.59 60.69 tonne 0.03 94.80 2.94 day day day day day 0.18 0.01 0.09 0.04 0.09 393.00 393.00 297.00 297.00 328.00 69.17 4.72 26.14 13.07 28.86 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 33.15 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 56.36 day 0.02 297.00 4.46 412.57 4.13 416.69 62.50 479.20 47,919.70 13.33 70.00 93.31 8.00 7.59 60.69 0.03 94.80 2.94 0.18 0.01 0.09 0.04 0.09 393.00 393.00 297.00 297.00 328.00 69.17 4.72 26.14 13.07 28.86 White Sand Stone 6.8.1.2 DSR 7.12.1.2 Details of cost for 1 cum. MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block 10cudm Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.9 Cudm & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 DSR 0102 DSR 0114 DSR 0115 DSR 0100 Mason (for plain stone work) First class Blacksmith 1st Class Beldar Coolie Bandhani day day day day day DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum Both Faces dressed 6.8.2 Red Sand Stone 6.8.2.1 DSR 7.12.1.1 Details of cost for 1 cum. MATERIAL: Red sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1160 Red sand stone block Lime Mortar 1:3 (1 Lime:3 coarse Sand) for laying 3.9 & pointing Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = 30.659 kg = 0.031 t LABOUR Dressing charges DSR 0123 Mason (for plain stone work) First class DSR 0102 Blacksmith 1st Class day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 33.15 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 56.36 day 0.02 297.00 4.46 419.23 4.19 423.42 63.51 486.94 48,693.84 13.33 65.00 86.65 Cudm 8.00 7.59 60.69 tonne 0.03 94.80 2.94 day day 0.35 0.01 393.00 393.00 138.34 4.72 10cudm DSR 0126 Mason (for ornamental stone work) 1 st class day 0.35 393.00 138.34 DSR 0114 DSR 0115 DSR 0100 Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 day day day 0.09 0.04 0.09 297.00 297.00 328.00 26.14 13.07 28.86 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 33.15 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 56.36 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum day 0.02 297.00 4.46 620.07 6.20 626.27 93.94 720.21 72,021.29 13.33 70.00 93.31 8.00 7.59 60.69 0.03 94.80 2.94 Cost of 1 Cum White Sand Stone 6.8.2.2 DSR 7.12.1.2 Details of cost for 1 cum. MATERIAL: White sand stone Finished work = 10 cudm.+Add wastage @ 33.3% = 3.33 cudm Add wastage @ 33.3% = 3.33 cudm. Total = 13.33 cudm DSR 1161 White sand stone block 10cudm Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying 3.9 Cudm & pointing DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 30.659 kg = 0.031 t DSR 0123 DSR 0102 LABOUR Dressing charges Mason (for plain stone work) First class Blacksmith 1st Class day day 0.35 0.01 393.00 393.00 138.34 4.72 DSR 0126 Mason (for ornamental stone work) 1 st class day 0.35 393.00 138.34 DSR 0114 DSR 0115 DSR 0100 Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Bhisti Scaffolding Centring and shuttering Extra labour for lifting of materials 0.01x1.50 = 0.015 Coolie Total Add water charges 1% Total Add CPOH @ 15% Cost of 0.01 Cum Cost of 1 Cum day day day 0.09 0.04 0.09 297.00 297.00 328.00 26.14 13.07 28.86 day day day day day day L.S L.S 0.05 0.01 0.03 0.03 0.03 0.03 2.73 33.15 361.00 393.00 297.00 297.00 328.00 328.00 1.70 1.70 19.06 2.83 7.84 7.84 8.66 8.66 4.64 56.36 day 0.02 297.00 4.46 626.74 6.27 633.00 94.95 727.95 72,795.43 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0101 DSR 9999 DSR 9999 DSR 0115 7.0 FLOORING 7.1 7.1.1 Code DSR 11.23.1 Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by conservation architect, over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime :1 surkhi:1 coarse sand) laid and jointed , including rubbing and polishing complete with Makrana white second quality Description Details of cost for 10 sqm MATERIAL: Unit Quantity Rate in Rs Amount in Rs 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 6001 DSR 9999 DSR 0123 DSR 0114 DSR 0115 DSR 0139 DSR 0013 DSR 9999 White marble slab Makrana second quality plain Sqm veined 18 mm thick Base lime mortar of 20mm thick 3.3 Cum 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 Cum 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab LS LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 1st class day Beldar day Coolie day Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 7.1.2 Raj Nagar Plain DSR 11.23.2 Details of cost for 10 sqm MATERIAL: 11.50 2,375.00 27,312.50 0.22 6,806.02 1,524.55 0.06 6,806.02 381.14 26.91 1.70 45.75 1.44 1.20 1.20 5.00 4.00 134.55 393.00 297.00 297.00 328.00 350.00 1.70 565.92 356.40 356.40 1,640.00 1,400.00 228.74 33,811.39 338.11 34,149.50 5,122.43 39,271.93 3,927.19 Sqm 11.50 770.00 8,855.00 Cum 0.22 6,806.02 1,524.55 Cum 0.06 6,806.02 381.14 LS 26.91 1.70 45.75 day day day 1.44 1.20 1.20 393.00 297.00 297.00 565.92 356.40 356.40 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 7071 DSR 9999 DSR 0123 DSR 0114 DSR 0115 White marble Raj Nagar plain 18 mm thick upto 0.50 sqm area Base lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 1st class Beldar Coolie DSR 0139 DSR 0013 DSR 9999 Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 5.00 4.00 134.55 328.00 350.00 1.70 1,640.00 1,400.00 228.74 15,353.89 153.54 15,507.43 2,326.11 17,833.54 1,783.35 7.1.3 DSR 11.23.3 Agaria White Details of cost for 10 sqm MATERIAL: 11.50 1,430.00 16,445.00 0.22 6,806.02 1,524.55 0.06 6,806.02 381.14 26.91 1.70 45.75 1.44 1.20 1.20 5.00 4.00 134.55 361.00 297.00 297.00 328.00 350.00 1.70 519.84 356.40 356.40 1,640.00 1,400.00 228.74 22,897.81 228.98 23,126.78 3,469.02 26,595.80 2,659.58 Sqm 11.50 650.00 7,475.00 Cum 0.22 6,806.02 1,524.55 Cum 0.06 6,806.02 381.14 LS 26.91 1.70 45.75 day day day 1.44 1.20 1.20 393.00 297.00 297.00 565.92 356.40 356.40 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 7850 Agaria White marble slab plain 18 mm thick Sqm Base lime mortar of 20mm thick Cum 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 Cum 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab LS LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 1st class day Beldar day Coolie day Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 3.3 DSR 9999 DSR 0123 DSR 0114 DSR 0115 DSR 0139 DSR 0013 DSR 9999 7.1.4 DSR 11.23.4 Black Zebra Details of cost for 10 sqm MATERIAL: 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 6019 DSR 9999 DSR 0123 DSR 0114 DSR 0115 Black Zebra marble slab plain 18 mm thick Base lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 1st class Beldar Coolie DSR 0139 DSR 0013 DSR 9999 Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 5.00 4.00 134.55 328.00 350.00 1.70 1,640.00 1,400.00 228.74 13,973.89 139.74 14,113.63 2,117.04 16,230.67 1,623.07 7.1.5 DSR 11.23.5 Udaipur Green Marble Details of cost for 10 sqm MATERIAL: Sqm 11.50 825.00 9,487.50 Cum 0.22 6,806.02 1,524.55 Cum 0.06 6,806.02 381.14 LS 26.91 1.70 45.75 day day day day day LS 1.44 1.20 1.20 5.00 4.00 134.55 393.00 297.00 297.00 328.00 350.00 1.70 565.92 356.40 356.40 1,640.00 1,400.00 228.74 15,986.39 159.86 16,146.25 2,421.94 18,568.19 1,856.82 Sqm 11.50 750.00 8,625.00 Cum 0.22 6,806.02 1,524.55 Cum 0.06 6,806.02 381.14 LS 26.91 1.70 45.75 day day 1.44 1.20 393.00 297.00 565.92 356.40 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 6010 Udaypur green marble slab plain 18 mm thick Base lime mortar of 20mm thick 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab 3.3 DSR 9999 LABOUR ( for finishing, polishing and fixing) DSR 0123 DSR 0114 DSR 0115 DSR 0139 DSR 0013 DSR 9999 Mason (brick layer) 1st class Beldar Coolie Skilled Beldar (for floor rubbing etc.) Machine for rubbing of floors Sundries including carriage of lime etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 7.1.6 DSR 11.23.6 Pink Plain Marble Details of cost for 10 sqm MATERIAL: 18mm thick marble slab = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm DSR 6007 DSR 9999 DSR 0123 DSR 0114 Pink marble slab plain 18 mm thick Base lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Joint lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Carriage of marble slab LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 1st class Beldar DSR 0115 DSR 0139 DSR 0013 DSR 9999 7.2 7.2.1 DSR 11.26 DSR 1168 DSR 0874 DSR 2216 DSR 0124 DSR 0114 DSR 0115 DSR 0139 DSR 0013 DSR 9999 7.3 DSR 11.26 DSR 1168 Coolie day Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 1.20 5.00 4.00 134.55 297.00 328.00 350.00 1.70 356.40 1,640.00 1,400.00 228.74 15,123.89 151.24 15,275.13 2,291.27 17,566.39 1,756.64 Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with lime slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of lime mortar 1 : 1:1 (1 lime :1surkhi:1 coarse sand) 25mm thick Details of cost for 10 sqm MATERIAL: Kota stone slab 20 mm to 25 mm thick (semiSqm polished) including 15% wastage Base lime mortar of 20mm thick 3.3 Cum 1:1:1(1lime:1surkhi:1 coarse sand) Pointing lime mortar of 20mm thick 3.3 Cum 1:1:1(1lime:1surkhi:1 coarse sand) Black colour dark shade pigment Kg Carriage of stone blocks white & red sand stone Tonne & kota stone slab LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 2nd class day Beldar day Coolie day Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.50 357.00 4,105.50 0.22 6,806.02 1,524.55 0.06 6,806.02 381.14 4.50 55.00 247.50 0.67 94.80 63.52 1.44 1.20 1.20 5.00 4.00 208.13 361.00 297.00 297.00 328.00 350.00 1.70 519.84 356.40 356.40 1,640.00 1,400.00 353.82 10,948.66 109.49 11,058.15 1,658.72 12,716.87 1,271.69 Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick lime mortar 1:1:1 (1 lime: 1surkhi:1coarse sand) and jointed with lime slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. Details of cost for 10 sqm MATERIAL: Kota stone slab 20 mm to 25 mm thick (semipolished) including 15% wastage Base lime mortar of 20mm thick 3.3 1:1:1(1lime:1surkhi:1 coarse sand) Sqm 11.50 357.00 4,105.50 Cum 0.22 6,806.02 1,524.55 3.3 DSR 0874 DSR 2216 DSR 0124 DSR 0114 DSR 0115 DSR 0139 DSR 9999 7.4 DSR 11.23.1 M Rate 3.1.9 DSR 9999 DSR 0124 DSR 0114 DSR 0115 DSR 0139 DSR 9999 7.5 7.5.1 DSR 11.28.1 Pointing lime mortar of 20mm thick Cum 1:1:1(1lime:1surkhi:1 coarse sand) Black colour dark shade pigment Kg Carriage of stone blocks white & red sand stone Tonne & kota stone slab LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 2nd class day Beldar day Coolie day Skilled Beldar (for floor rubbing etc.) day Sundries including carriage of lime etc LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.06 6,806.02 381.14 4.50 55.00 247.50 0.67 94.80 63.52 3.60 3.60 1.20 7.00 174.98 361.00 297.00 297.00 328.00 1.70 1,299.60 1,069.20 356.40 2,296.00 297.47 11,640.87 116.41 11,757.27 1,763.59 13,520.87 1,352.09 Laterite stone flooring with 19 mm thick Laterite stone as per sample of Laterite approved by Engineer-in-Charge, over 20 mm (average) thick base of lime mortar 1:4 (1 lime : 4 coarse sand) laid and jointed withlime slurry including rubbing and polishing complete Details of cost for 10 sqm MATERIAL: 20mm laterite stone = 10.00sqm. Add for wastage 15% = 1.50sqm. Total = 11.50sqm Laterite stone Sqm Base lime mortar of 20mm thick 1:3(1lime:3 3.9 Cum coarse sand) Joint lime mortar of 20mm thick 1:3(1lime:3 Cum coarse sand) Carriage of stone LS LABOUR ( for finishing, polishing and fixing) Mason (brick layer) 2nd class day Beldar day Coolie day Skilled Beldar (for floor rubbing etc.) day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.50 1,050.00 12,075.00 0.22 7,588.17 1,699.75 0.06 7,588.17 424.94 26.91 1.70 45.75 3.60 3.60 1.20 7.00 174.98 361.00 297.00 297.00 328.00 1.70 1,299.60 1,069.20 356.40 2,296.00 297.47 19,564.10 195.64 19,759.74 2,963.96 22,723.70 2,272.37 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush. Red Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1164 DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 Red sand stone slab 40 mm thick (Indressed) Sqm Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 7.5.2 DSR 11.28.2 White Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 7.6 Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.00 190.00 2,090.00 34.06 1.70 57.90 0.22 0.03 0.25 7,588.17 1,897.04 3.72 1.32 0.66 0.32 10.79 393.00 328.00 297.00 328.00 1.70 1,461.96 432.96 196.02 106.27 18.34 6,260.50 62.60 6,323.10 948.47 7,271.57 727.16 11.00 215.00 2,365.00 34.06 1.70 57.90 0.22 0.03 0.25 7,588.17 1,897.04 3.72 1.32 0.66 0.32 10.79 393.00 328.00 297.00 328.00 1.70 1,461.96 432.96 196.02 106.27 18.34 6,535.50 65.35 6,600.85 990.13 7,590.98 759.10 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush. 7.6.1 DSR 11.29.1 Red Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1164 Red sand stone slab 40 mm thick (Indressed) DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 7.6.2 DSR 1165 DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 Sqm Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining iii. For Pointing 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.00 190.00 2,090.00 34.06 1.70 57.90 0.22 0.03 0.02 0.27 7,588.17 2,071.57 4.68 1.32 1.68 0.66 26.91 393.00 328.00 297.00 328.00 1.70 1,839.24 432.96 498.96 216.48 45.75 7,252.86 72.53 7,325.39 1,098.81 8,424.20 842.42 11.00 215.00 2,365.00 34.06 1.70 57.90 0.22 0.03 0.02 0.27 7,588.17 2,071.57 4.68 1.32 1.68 0.66 26.91 393.00 328.00 297.00 328.00 1.70 1,839.24 432.96 498.96 216.48 45.75 7,527.86 75.28 7,603.14 1,140.47 8,743.61 874.36 White Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm white sand stone slab 40 mm thick (Indressed) Sqm Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining iii. For Pointing 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 7.7 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime: 1 surkhi:1coarse sand) with joints finished flush. 7.7.1 DSR 11.28.1 Red Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1164 Red sand stone slab 40 mm thick (Indressed) DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 Sqm Carriage LS Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse sand) i. For bedding ii. For Joining Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse 3.3 sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.00 190.00 2,090.00 34.06 1.70 57.90 0.25 6,806.02 1,701.50 3.72 1.32 0.66 0.32 10.79 393.00 328.00 297.00 328.00 1.70 1,461.96 432.96 196.02 106.27 18.34 6,064.96 60.65 6,125.61 918.84 7,044.45 704.45 0.22 0.03 7.7.2 DSR 11.28.1 White Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00 DSR 9999 Carriage Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse sand) i. For bedding ii. For Joining Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse sand) LABOUR Mason Brick I Class Bandhani Coolie Bhisti Sundries 34.06 1.70 57.90 0.25 6,806.02 1,701.50 3.72 1.32 0.66 0.32 10.79 393.00 328.00 297.00 328.00 1.70 1,461.96 432.96 196.02 106.27 18.34 3.1.3 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 LS 0.22 0.03 day day day day LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 6,339.96 63.40 6,403.36 960.50 7,363.86 736.39 Cost of 1 Sqm 7.8 40 mm thick rubbed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime :3 coarse sand) with joints 3 mm thick, side buttered with lime mortar 1:2 (1 lime : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar 7.8.1 DSR 11.30.1 Red Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1164 Red sand stone slab 40 mm thick (Indressed) DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 DSR 0139 DSR 0013 Sqm Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining iii. For bedding 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS LABOUR Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.00 190.00 2,090.00 34.06 1.70 57.90 0.22 0.03 0.02 0.27 4.68 1.32 1.68 0.66 26.91 7,588.17 393.00 328.00 297.00 328.00 1.70 2,071.57 1,839.24 432.96 498.96 216.48 45.75 0.62 0.99 328.00 350.00 202.70 345.80 7,801.36 78.01 7,879.38 1,181.91 9,061.28 906.13 7.8.2 DSR 11.30.2 White Sand stone Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00 DSR 9999 Carriage Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining iii. For Pointing 34.06 1.70 57.90 LS 0.22 0.03 0.02 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 DSR 0139 DSR 0013 7.9 DSR 11.3.1 DSR 0295 DSR 0297 DSR 2202 DSR 0982 DSR 2203 DSR 0367 DSR 2209 M Rate DSR 0123 DSR 0114 DSR 0101 DSR 0127 DSR 0002 DSR 9999 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS LABOUR Skilled Beldar (for floor rubbing etc.) day Machine for rubbing of floors day Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.27 4.68 1.32 1.68 0.66 26.91 7,588.17 393.00 328.00 297.00 328.00 1.70 2,071.57 1,839.24 432.96 498.96 216.48 45.75 0.62 0.99 328.00 350.00 202.70 345.80 8,076.36 80.76 8,157.13 1,223.57 9,380.70 938.07 40mm thick red oxide flooring under layer 0f 30mm thick cement concrete 1:2:4(1cement:2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size) and top layer of 10mm thick plaster of cement red oxide mix( using 3.5 kg of red oxide of iron per 50 kg of cement) 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement red oxide mix of same proportion including cement slurry, rounding off egdes, strips, etc but excluding the cost of nosing of steps. complete Details of cost for 10 sqm MATERIAL: Stone Aggregate (Single size) : 20 mm nominal Cum size Stone Aggregate (Single size) : 20 mm nominal Cum size Carriage of stone aggregate below 40 mm Cum nominal size Coarse sand (zone III) Cum Carriage of coarse sand Cum Portland Cement tonne Carriage of cement tonne Red oxide Kg LABOUR Mason 1st class day Beldar day Bhisti day Driver (for Road Roller, Concrete Mixer Truck day etc.) Hire charges of Concrete Mixer 0.25 to 0.40 day cum with Hopper Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.27 1,200.00 320.40 0.09 1,050.00 93.45 0.36 106.64 37.96 0.18 0.18 0.17 0.17 15.00 1,120.00 106.64 6,600.00 94.80 75.00 199.36 18.98 1,122.00 16.12 1,125.00 1.40 2.45 1.82 393.00 297.00 328.00 550.20 727.65 596.96 0.05 393.00 20.63 0.03 800.00 24.00 40.43 1.70 68.73 4,921.45 49.21 4,970.66 745.60 5,716.26 571.63 7.10 DSR 11.3.1 DSR 3.8 DSR 0367 DSR 2209 DSR 0875 DSR 0123 DSR 0115 DSR 0101 DSR 9999 Red oxide plastering (up to 30cm height) with cement mortar 1:3( 1 cement : 3 coarse sand) finished with a floating coat of neat cement including rounding of junctions with floor. Details of cost for 10 sqm MATERIAL: Cement mortar 1:3 = 0.205 cum+Add for rounding corners = 0.030 cum = 0.235 Portland Cement Carriage of cement Red oxide LABOUR Mason 1st class Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cum 0.24 366.20 86.06 tonne tonne Kg 0.19 0.19 22.00 6,600.00 94.80 75.00 1,226.61 17.62 1,650.00 day day day LS 3.29 3.29 0.95 19.76 393.00 297.00 328.00 1.70 1,292.97 977.13 309.96 33.59 5,593.94 55.94 5,649.88 847.48 6,497.36 649.74 Cost of 1 Sqm 7.11 DSR 11.3.1 DSR 0123 DSR 0115 DSR 0101 DSR 9999 7.12 DSR 11.29.1 M Rate DSR 9999 Laying lime flooring-Providing and laying lime concrete(1 lime:3 brick bats) up to 100mm thickness tamping and compacting properly which is follwed by laying of Lime mortar 1:3 up to a thickness of 20mm.Rework to be done till the desired smoothness on the surface Details of cost for 1 sqm MATERIAL: 4.4 Lime Concrete Sqm Lime Mortar 1:3 (1 Lime: 3 Coarse sand) Cum Lime Mortar 1:3 (1 Lime: 3 Fine Sand sand) Cum LABOUR Mason 1st class day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 1.20 0.01 0.01 841.74 7,588.17 8,782.53 1,010.09 91.06 105.39 0.41 0.15 0.74 19.76 393.00 297.00 328.00 1.70 162.11 44.55 243.54 33.59 1,690.33 16.90 1,707.24 256.09 1,963.32 Heritage floor tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush. Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm Heritage Floor tiles Sqm 11.00 2,044.40 22,488.40 Carriage LS 34.06 1.70 57.90 Lime mortar 1:3 (1 Lime:3 Coarse sand) DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 7.13 DSR 11.29.1 M Rate DSR 9999 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 i. For bedding ii. For Joining iii. For Pointing 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.22 0.03 0.02 0.27 7,588.17 2,071.57 4.68 1.32 1.68 0.66 26.91 393.00 328.00 297.00 328.00 1.70 1,839.24 432.96 498.96 216.48 45.75 27,651.26 276.51 27,927.77 4,189.17 32,116.94 3,211.69 Heritage Skirting tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush. Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm Heritage Floor tiles Sqm Carriage LS Lime mortar 1:3 (1 Lime:3 Coarse sand) i. For bedding ii. For Joining iii. For Pointing 3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) LABOUR Mason Brick I Class day Bandhani day Coolie day Bhisti day Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.00 34.06 1,614.00 1.70 17,754.00 57.90 0.22 0.03 0.02 0.27 7,588.17 2,071.57 5.07 1.43 1.82 0.72 26.91 393.00 328.00 297.00 328.00 1.70 1,992.51 469.04 540.54 234.52 45.75 23,165.83 231.66 23,397.49 3,509.62 26,907.11 2,690.71 8.0 ROOFING 8.1 Code Providing and laying Flat brick/ Terracota tiles on roofs grouted with lime mortar 1:2(1 lime: 2 fine sand) mixed with 5% crude oil by weight of lime, over 20mm layer of lime mortar 1:2 (1 lime: 2 fine sand) Description Unit Quantity Rate in Rs Amount in Rs DSR 12.20 Detail of cost for 10 Sqm DSR7266 DSR2207 MATERIAL: Pressed clay tiles 20mm thick 250x250 mm size Carriage of brick tiles 1000 Nos 1000 Nos 3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) for bedding 3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) for pointing M Rate 5 % crude oil by weight of lime LABOUR DSR0123 Mason (brick layer) 1st class DSR 0114 Beldar DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 160 160 12150 170.63 1,944.00 27.30 Cum 0.224 8,256.64 1,849.49 Cum 0.037 8,256.64 305.50 Kg 0.2 100.00 20.00 day day LS 0.72 3.12 14.3 393.00 297.00 1.70 282.96 926.64 24.31 5,380.19 53.80 5,434.00 815.10 6,249.10 624.91 Cost of 1 Sqm 8.2 Code Removing brick tiles from 50 to 60cm thick lime terrace and relaying an average thickness 7.5cm laid to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1 Lime putty:2 Surkhi) rammed and finished with gur and belgiri treatment complete and covered with brick tiles of class designation 100 to 50 mm thick red sand stone grouted with lime mortar 1:3(1 Lime: 3 Fine sand) with 5% crude oil by weight of lime over 20mm layer of lime mortar 1:3 (1 lime : 3 fine sand) Description Unit Quantity Rate in Rs Amount in Rs DSR 12.20 Detail of cost for 10 Sqm Demolishing brick tile covering in terracing including DSR 15.26 stacking of serviceable material and disposal of unserviceable material within 50 metres lead 4.6 DSR7266 DSR2207 3.8 3.8 M Rate MATERIAL: Lime concrete with 25mm size brick aggregate and 50% lime mortar 1:2 (1lime:2 Surkhi) Pressed clay tiles 20mm thick 250x250 mm size Carriage of brick tiles Lime mortar 1:2 (1 lime: 2 Fine Sand) Lime mortar 1:2 (1 lime: 2 Fine Sand) 5 % crude oil by weight of lime LABOUR Sqm 10.5 36.95 387.975 Cum 0.075 9,341.38 700.60 1000 Nos 1000 Nos Cum Cum Kg 160 160 0.224 0.037 0.2 12,150.00 170.63 8,256.64 8,256.64 100.00 1,944.00 27.30 1,849.49 305.50 20.00 DSR0123 Mason (brick layer) 1st class DSR 0114 Beldar DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm day day LS 0.72 3.12 14.3 393.00 297.00 1.70 Cost of 1 Sqm 8.3 Code M Rate DSR 2207 DSR 0305 M Rate DSR 1219 DSR 0859 DSR 0123 DSR 0114 DSR 0123 DSR 0114 DSR 9999 8.4 Code M Rate DSR 2207 DSR 1189 DSR 0806 DSR 0859 DSR 0806 DSR 1219 282.96 926.64 24.31 6,468.77 64.69 6,533.46 980.02 7,513.48 751.35 Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per approved pattern on bamboo frame work complete Description Details of cost for 12.76 Sqm MATERIAL: Tiles average size of 200mmx125mmx6mm Carriage of country tiles Bamboo Battens 25mm 2.5 M long =350 Bamboo Battens 25mm 1 M long =Rs.140 Bamboo Battens 25mm 3.3 M long =Rs.462 Bamboo Battens 25mm 3.3 M long Fibre rope Iron Nails Oil type wood preservative Labour - Fixing Battens Mason 1st class Beldar Labour - Laying Tiles Mason 1st class Beldar Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 12.76 Sqm Cost of 1 Sqm Unit Quantity Rate in Rs Amount in Rs 1000 Nos 1000 Nos 1276 1276 3,000.00 170.63 3,828.00 217.72 No Kg Kg lit 12.00 1.00 1.00 2 462.00 50.00 60.00 80.00 5,544.00 50.00 60.00 160.00 day day 5.00 5.00 393.00 297.00 1,965.00 1,485.00 day day L.S 3.00 3.00 13.00 393.00 297.00 1.70 1,179.00 891.00 22.10 15,401.82 154.01824 15,555.84 2333.3763 17,889.22 1401.9764 Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per approved pattern on Teak wooden frame work complete Amount in Description Unit Quantity Rate in Rs Rs Details of cost for 10 Sqm MATERIAL: Tiles average size of 200mmx125mmx6mm 1000 Nos 1125 3,000.00 3,375.00 Carriage of country tiles 1000 Nos 1125 170.63 191.96 Second class teak wood in scantling cum 0.12 160,678.70 19,763.48 Paint lit 2.00 120.00 240.00 Oil type wood preservative lit 2 80.00 160.00 Primer lit 2 120.00 240.00 Iron Nails Kg 0.55 60.00 33.00 Labour DSR 0111 Carpenter DSR 0114 Beldar DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm day day L.S 2.20 1.10 13.00 393.00 297.00 1.70 Cost of 1 Sqm 8.5 Construction of Jack arched roof using Rolled steel joists, fired clay bricks with Kafgi mix recommended by by UNESCO Code DSR 1007 DSR 2207 DSR 5.9.9 5.10 DSR 1002 3.16.1 DSR 9999 DSR 0123 DSR 0115 DSR 9999 8.6 864.60 326.70 22.10 25,216.84 252.16839 25,469.01 3820.3511 29,289.36 2928.9358 Description Details of cost for 12 Sqm (2.4mx5m) MATERIAL: Rolled steel Joists of 160mmx60mm size Carriage of steel Centering and shuttering including strutting, propping etc. and removal Centering and shuttering including strutting, propping etc. and removal Arches, domes, vaults up to 6 m span Brick work in gauged arches for span up to 6 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand). Tie rod Kafgi cement mix Sundries Mason 1st class Coolie Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Unit Quantity Rate in Rs Amount in Rs Quintal Tonne 6.92 0.692 4,650.00 94.80 32,178.00 65.60 Sqm 16.00 1,006.65 16,106.40 Cum 1.34 12,153.31 16,334.04 Kg Cum LS day day L.S 4.40 1.08 125 5.50 10.00 58.00 4,500.00 8,517.74 1.70 393.00 297.00 1.70 19,800.00 9,158.27 212.50 2,161.50 2,970.00 98.60 89,926.65 899.26646 90,825.91 13623.887 104,449.80 10444.98 Providing Lime stone slab for roofing and laying them in Lime mortar 1:3 over wooden karries or R.C.C. battens or structural steel sections (karries or battens or structural steel sections to be separetely), including pointing the ceiling joints with lime mortar 1:3 complete: Lime Sand stone Code DSR 11.30.1 Description Details of cost for 10 sqm MATERIAL: Finished work = 10sqm Add wastage 10% =1.00sqm Unit Quantity Rate in Rs Amount in Rs M Rate DSR 9999 3.9 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 8.7 Total = 11.00 sqm Lime stone of size 15"x9"x7" Carriage Lime mortar 1:3 (1 Lime:3 Coarse sand) For Joining and Pointing Lime mortar 1:3 (1 Lime:3 Coarse sand) Labour Mason Brick I Class Bandhani Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm day day day day LS 130 34.06 34.00 1.70 4,420.00 57.90 0.049 0.049 7,588.17 371.82 4.68 1.32 1.68 0.66 26.91 393.00 328.00 297.00 328.00 1.70 1,839.24 432.96 498.96 216.48 45.75 7,883.11 78.83 7,961.94 1,194.29 9,156.23 915.62 Roofing with pot-Providing and laying burnt earthern pots over and between lime concrete/mud mortar using pots of max dia 150mm to 200 mm and pack the gaps between pots with Lime Mortar (1:3) Code DSR 11.30.1 No LS Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 1 sqm MATERIAL: 3.9 Lime Mortar as a filling material between the pots Cum M Rate Burnt Earthern Pots Labour Mason Brick I Class Bandhani Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 Cost of 1 Sqm 0.017 7,588.17 129.00 No 50 12.00 600.00 day day day day LS 0.3 0.13 0.17 0.06 12 393.00 328.00 297.00 328.00 1.70 117.90 42.64 50.49 19.68 20.40 980.11 9.80 989.91 148.49 1,138.40 9.0 FINISHES Lime plaster 1:3 (1 slaked lime : 3 coarse sand) 9.1 20mm Thickness 9.1.1 Code Description Unit Quantity Rate in Rs Amount in Rs DSR 13.1.1 Details of cost for 1 Sqm. MATERIAL: Lime mortar1: 3(1 Lime:3 coarse 3.9 Cum 0.0224 7,588.17 169.97 sand) LABOUR DSR 0123 Mason First Class day 0.134 393.00 52.66 DSR 0115 Coolie day 0.90 297.00 267.30 DSR 0101 Bhisti day 1.10 328.00 362.11 DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72 Total 877.77 Add water charges 1% 8.78 Total 886.55 Add CPOH @ 15% 132.98 Cost of 1 Sqm 1,019.53 9.1.2 Code DSR 13.1.1 3.9 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.1.3 Code 3.9 DSR 0123 DSR 0115 DSR 0101 DSR 9999 15mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar1: 3(1 Lime:3 coarse Cum sand) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 12mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar1: 3(1 Lime:3 coarse Cum sand) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.0174 7,588.17 132.03 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 839.83 8.40 848.23 127.23 975.47 Quantity Rate in Rs Amount in Rs 0.0144 7,588.17 109.27 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 817.07 8.17 825.24 123.79 949.02 9.2 Lime plaster 1:1:1 (1 slaked lime :1 surkhi: 1 fine sand) 9.2.1 Code 20mm Thickness Double Coat Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar1:1:1 (1 Lime:1 surkhi:1 Cum fine sand) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 3.2 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.2.2 Code 3.2 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.2.3 Code 3.2 DSR 0123 DSR 0115 DSR 0101 DSR 9999 15mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar1:1:1 (1 Lime:1 surkhi:1 Cum fine sand) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 12mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar1:1:1 (1 Lime:1 surkhi:1 Cum fine sand) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.022 0.134 0.90 1.10 15.132 8,232.80 181.12 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 888.92 8.89 897.81 134.67 1,032.48 Quantity Rate in Rs Amount in Rs 0.01725 0.134 0.90 1.10 15.132 8,232.80 142.02 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 849.81 8.50 858.31 128.75 987.06 Quantity Rate in Rs Amount in Rs 0.0138 0.134 0.90 1.10 15.132 8,232.80 113.61 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 821.41 8.21 829.63 124.44 954.07 9.3 9.3.1 Code 3.10 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.3.2 Code 3.10 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.3.3 Code 3.10 DSR 0123 DSR 0115 DSR 0101 DSR 9999 Lime plaster 1:2 :1(1 lime putty : 2 coarse sand:1surkhi) 20mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar 1:2:1 (1 slaked lime: 2 Cum coarse sand:1 surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 15mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar 1:2:1 (1 slaked lime: 2 Cum coarse sand:1 surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.0224 6,397.70 143.31 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 851.11 8.51 859.62 128.94 988.56 Quantity Rate in Rs Amount in Rs 0.018 6,397.70 115.16 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 822.96 8.23 831.19 124.68 955.86 12mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime mortar 1:2:1 (1 slaked lime: 2 Cum coarse sand:1 surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.0144 6,397.70 92.13 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 799.93 8.00 807.92 121.19 929.11 9.4 9.4.1 Code Lime plaster 1:2 (1 lime putty : 2 surkhi) 20mm Thickness Description Unit DSR 0123 DSR 0115 DSR 0101 DSR 9999 Details of cost for 1 Sqm. MATERIAL: Lime plaster 1:2 (1 lime putty : 2 Cum surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 9.4.2 15mm Thickness 3.5 Code 3.5 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.4.3 Code 3.5 DSR 0123 DSR 0115 DSR 0101 DSR 9999 Description Unit Details of cost for 1 Sqm. MATERIAL: Lime plaster 1:2 (1 lime putty : 2 Cum surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 12mm Thickness Description Unit Details of cost for 1 Sqm. MATERIAL: Lime plaster 1:2 (1 lime putty : 2 Cum surkhi) LABOUR Mason First Class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.0224 6,565.11 147.06 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 854.86 8.55 863.41 129.51 992.92 Quantity Rate in Rs Amount in Rs 0.01725 0.134 0.90 1.10 15.132 6,565.11 113.25 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 821.05 8.21 829.26 124.39 953.65 Quantity Rate in Rs Amount in Rs 0.0138 0.134 0.90 1.10 15.132 6,565.11 90.60 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 798.40 7.98 806.38 120.96 927.34 9.5 Code Lime plaster 1:2(1 lime putty : 2 coarse Sand) 20mm Thickness First Coat of 12mm and second coat 8mm in each coat Description Unit Quantity Rate in Rs Amount in Rs DSR 0155 DSR 0115 DSR 0101 DSR 9999 Details of cost for 1 Sqm. MATERIAL: Lime mortar1:1 (1 Lime1:2 coarse Cum sand) LABOUR Mason First class day Coolie day Bhisti day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 9.6 Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followed by grinding to fine paste for smooth finish 3.7 Code Description MATERIAL: Marble Powder Lime Dal Gur & Belgiri LABOUR DSR 0155 Mason (Average) DSR 0115 Coolie DSR 9999 Scaffolding and Sundries Total Add water charges 1% Total Add CPOH @ 15% DSR 13.18 & ISOR DSR 9999 DSR 9999 Unit Cum Quintal LS LS day day LS 0.0224 7,005.52 156.92 0.134 0.90 1.10 15.132 393.00 297.00 328.00 1.70 52.66 267.30 362.11 25.72 864.72 8.65 873.37 131.01 1,004.37 Quantity Rate in Rs Amount in Rs 0.05 0.05 9 15 1,000.00 800.00 1.70 1.70 50.00 40.00 15.30 25.50 0.324 0.324 9.672 377.00 297.00 1.70 122.15 96.23 16.44 365.62 3.66 369.27 55.39 424.67 Cost of 1 Sqm 9.7 Code DSR 9999 DSR 0123 DSR 0115 DSR 9999 Preparing and applying of lime mortar plaster 1 Lime:2 fine sand up to a thickness of 3mm over the lime mortar plaster laid. Description Unit MATERIAL: Lime Mortar 1 lime: 2 Fine stand Cum Gur & Belgiri LS LABOUR Mason First class day Coolie day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.005 4 8,256.64 1.70 41.28 6.80 0.27 0.27 9.672 393.00 297.00 1.70 106.11 80.19 16.44 250.83 2.51 253.33 38.00 291.33 9.8 Code ISOR 11.8 DSR 0155 DSR 0115 DSR 0114 DSR 9999 9.9 Code DSR 13.16 DSR 0123 DSR 0115 DSR 0101 DSR 9999 Plastering of the dome in lime mortar 1:2:1(1 Lime:2 coarse sand:1 surkhi ) up to 20mm thickness Description Unit Quantity Rate in Rs Amount in Rs MATERIAL Lime mortar 1:2:1 Cum 0.025 6,397.70 159.94 LABOUR Mason (Average) day 0.1608 377.00 60.62 Coolie day 1.08 297.00 320.76 Bhisti day 1.32 328.00 434.53 Scaffolding and Sundries LS 15.132 1.70 25.72 Total 1,001.58 Add water charges 1% 10.02 Total 1,011.60 Add CPOH @ 15% 151.74 Cost of 1 Sqm 1,163.34 Mud plaster 1:3:1(1 lime slaked : 3 Mud:1 coarse sand) 20mm Thickness First Coat of 12mm and second coat 8mm in each coat Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 1 Sqm. MATERIAL: Mud mortar1:3:1 (1 Lime1:3 mud:1 Cum 0.0224 4,989.45 111.76 coarse sand) LABOUR Mason First class day 0.134 393.00 52.66 Coolie day 0.90 297.00 267.30 Bhisti day 1.10 328.00 362.11 Scaffolding and Sundries LS 15.132 1.70 25.72 Total 819.56 Add water charges 1% 8.20 Total 827.76 Add CPOH @ 15% 124.16 Cost of 1 Sqm 951.92 ORNAMENTAL PLASTER WORK 9.10 9.10.1 Making cornice band with ornamental design as per the conservation Architect's design with lime plaster (1lime:3 finesand) Size 150mm wide and 50mm average thick Code Description Unit ISOR 1.12 Details of cost for 10m. MATERIAL Lime plaster 1:3 (1 lime putty : 3 Fine 3.13 Cum sand) M Rate Bonding Agent (Nitobond SBR) DSR 0006 Spray Machine for water jet spray Labour M Rate Conservator Mason (for ornamental stone work) DSR 0126 1 st class Lit Quantity Rate in Rs Amount in Rs 0.5 8,782.53 4,391.26 0.5 400.00 200.00 day 0.5 250.00 125.00 day 0.05 1,650.00 82.50 day 2 393.00 786.00 DSR 0114 Beldar DSR 0128 Mate DSR 9999 Scaffolding and Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m day day LS 2.5 1 100 297.00 328.00 1.70 Cost of 1 m Size 100mm wide and 50mm average thick Code Description Unit ISOR 1.12 Details of cost for 10m. MATERIAL Lime plaster 1:3 (1 lime putty : 3 Fine 3.13 Cum sand) 742.50 328.00 170.00 6,825.26 68.25 6,893.52 1,034.03 7,927.54 792.75 9.10.2 M Rate Bonding Agent (Nitobond SBR) DSR 0006 Spray Machine for water jet spray M Rate DSR 0126 DSR 0114 DSR 0128 DSR 9999 9.10.3 Code 3.13 M Rate DSR 0126 DSR 0114 DSR 0128 DSR 9999 0.3 8,782.53 2,634.76 400.00 140.00 0.35 250.00 87.50 0.05 1,650.00 82.50 2 393.00 786.00 2.5 1 100 297.00 328.00 1.70 742.50 328.00 170.00 4,971.26 49.71 5,020.97 753.15 5,774.12 577.41 0.35 day Labour Conservator day Mason (for ornamental stone work) day 1 st class Beldar day Mate day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m Cost of 1 m Size 75mm wide and 50mm average thick Description Unit Details of cost for 10m. MATERIAL Lime plaster 1:3 (1 lime putty : 3 Fine Cum sand) Bonding Agent (Nitobond SBR) DSR 0006 Spray Machine for water jet spray M Rate Lit Quantity Rate in Rs Amount in Rs Labour Conservator Mason (for ornamental stone work) 1 st class Beldar Mate Scaffolding and Sundries Lit Quantity Rate in Rs Amount in Rs 0.3 8,782.53 2,634.76 0.3 400.00 120.00 day 0.3 250.00 75.00 day 0.05 1,650.00 82.50 day 2 393.00 786.00 day day LS 2.5 1 100 297.00 328.00 1.70 742.50 328.00 170.00 Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m 4,938.76 49.39 4,988.15 748.22 5,736.37 573.64 Cost of 1 m 9.11 Code Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi:1 Fine sand) Description Unit ISOR 1.13 Details of cost for 10Sqm. MATERIAL Lime plaster 1:1:1(1 lime putty : 1 3.2 Cum Surkhi:1 Fine sand) Labour M Rate Conservator day M Rate Designer for arts day Mason (for ornamental stone work) DSR 0126 day 1 st class DSR 0114 Beldar day DSR 0128 Mate day Scaffolding and Sundries, natural DSR 9999 LS additives Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m Cost of 1 m 9.12 Code ISOR 7.4 3.5 M Rate DSR 0126 DSR 0114 DSR 0128 DSR 9999 Quantity Rate in Rs Amount in Rs 0.486 8,232.80 4,001.14 1 4 1,650.00 1,000.00 1,650.00 4,000.00 25 393.00 9,825.00 14 10 297.00 328.00 4,158.00 3,280.00 851 1.70 1,446.70 28,360.84 283.61 28,644.45 4,296.67 32,941.12 3,294.11 Stucco work in lime, surkhi(1:2) as per traditional practices and design, the mortar should be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per design. Description Unit Details of cost for 10Sqm. MATERIAL Lime plaster 1:2(1 lime putty : 2 Cum Surkhi) Labour Conservator day Mason (for ornamental stone work) day 1 st class Beldar day Mate day Scaffolding and Sundries LS Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m Cost of 1 m Quantity Rate in Rs Amount in Rs 0.0972 6,565.11 638.13 2 1,650.00 3,300.00 20 393.00 7,860.00 20 1 2500 297.00 328.00 1.70 5,940.00 328.00 4,250.00 22,316.13 223.16 22,539.29 3,380.89 25,920.18 2,592.02 LIME POINTING Raised and cut lime pointing 1:2 (1 9.13 Lime:2 surkhi) In Stonework 9.13.1 Code Description ISOR 2.22 Details of cost for 10 Sqm. Materials 3.5 DSR 0123 DSR 0115 DSR 0101 DSR 9999 Lime mortar 1 lime putty:2 surkhi Labour Mason (brick layer) 1 st class Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Unit Quantity Rate in Rs Amount in Rs Cum 0.04 6,565.11 262.60 day day day LS 3 2.96 1.00 8.50 393.00 297.00 328.00 1.70 1,179.00 879.12 328.00 14.45 2,663.17 26.63 2,689.81 403.47 3,093.28 309.33 Cost of 1 Sqm 9.13.2 Code DSR In Brick work 3.5 Lime mortar 1 lime putty:2 surkhi Description Details of cost for 10 Sqm. Materials Unit Cum Labour DSR 0123 Mason (brick layer) 1 st class day DSR 0115 Coolie day DSR 0101 Bhisti day Sundries,Scaffolding and racking out DSR 9999 LS joints Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Recessed lime pointing 1:2 (1 Lime:2 surkhi) 9.14 In Stonework 9.14.1 Code Description Unit ISOR 2.36 Details of cost for 10 Sqm. Materials 3.5 Lime mortar 1 lime putty:2 surkhi Labour DSR 0123 Mason (brick layer) 1 st class DSR 0115 Coolie DSR 0101 Bhisti Quantity Rate in Rs Amount in Rs 0.05472 6,565.11 359.24 2 2 1.80 393.00 297.00 328.00 786.00 594.00 590.40 175.00 1.70 297.50 2,627.14 26.27 2,653.41 398.01 3,051.43 305.14 Quantity Rate in Rs Amount in Rs Cum 0.03 6,565.11 196.95 day day day 1 1.75 1.25 393.00 297.00 328.00 393.00 519.75 410.00 DSR 9999 Sundries for raking out joints, cleaning etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm LS 155.00 1.70 1,783.20 17.83 1,801.04 270.16 2,071.19 207.12 Cost of 1 Sqm 9.14.2 263.50 In Brick Work Code Description Unit 9.12.2 Details of cost for 10 Sqm. Materials 3.5 Lime mortar 1 lime putty:2 surkhi Labour DSR 0123 Mason (brick layer) 1 st class DSR 0115 Coolie DSR 0101 Bhisti Sundries for raking out joints, DSR 9999 cleaning etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Quantity Rate in Rs Amount in Rs Cum 0.02 6,565.11 131.30 day day day 0.92 0.92 1.67 393.00 297.00 328.00 361.56 273.24 549.07 125.00 1.70 212.50 LS 1,527.67 15.28 1,542.95 231.44 1,774.39 177.44 Cost of 1 Sqm 9.15 9.15.1 Code Flush Pointing with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi) In stone Work Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 10 Sqm. Materials 3.5 Lime mortar 1 lime putty:2 surkhi DSR 0123 DSR 0115 DSR 0101 DSR 9999 Labour Mason (brick layer) 1 st class Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cum 0.04 6,565.11 262.60 day day day LS 2 2.5 0.97 155 393.00 297.00 328.00 1.70 786.00 742.50 316.52 263.50 2,371.12 23.71 2,394.84 359.23 2,754.06 275.41 Cost of 1 Sqm 9.15.2 Code DSR 13.31.1 In Brick Work Description Details of cost for 10 Sqm. Materials Unit Quantity Rate in Rs Amount in Rs 3.5 DSR 0123 DSR 0115 DSR 0101 DSR 9999 9.16 Code 3.5 Lime mortar 1 lime putty:2 surkhi Cum Labour Mason (brick layer) 1 st class day Coolie day Bhisti day Sundries,Scaffolding and racking out LS joints Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.036 6,565.11 236.34 1 1 1.25 393.00 297.00 328.00 393.00 297.00 410.00 143 1.70 243.10 1,579.44 15.79 1,595.24 239.29 1,834.52 183.45 Ruled Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi) Description Details of cost for 10 Sqm. Materials Lime mortar 1 lime putty:2 surkhi Labour DSR 0123 Mason (brick layer) 1 st class DSR 0115 Coolie DSR 0114 Beldar Unit Quantity Rate in Rs Amount in Rs Cum 0.3 6,565.11 1,969.53 day day day 0.85 0.85 0.20 393.00 297.00 297.00 334.05 252.45 59.40 DSR 9999 Scaffolding, pumps for watering 8% 209.2 DSR 9999 Sundries & Contingencies 3% Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 9.17 Code 3.5 78.45 2,903.08 29.03 2,932.11 439.82 3,371.93 337.19 Struck or weathered Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi) Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 10 Sqm. Materials Lime mortar 1 lime putty:2 surkhi Cum Labour DSR 0123 Mason (brick layer) 1 st class day DSR 0115 Coolie day DSR 0114 Beldar day Scaffolding, pumps for watering Sundries & Contingencies Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 0.3 6,565.11 1,969.53 1 0.9 0.20 393.00 297.00 297.00 393.00 267.30 59.40 155.3868 74.6 2,919.22 29.19 2,948.41 442.26 3,390.67 339.07 9.18 Code Repointing of raked out joints of Random rubble masonry by using lime mortar 1:1:1 (1Lime:1coarse sand:1Brick jeera) Description ISOR 11.4 Details of cost for 10 Sqm. Materials DSR 0982 Coarse sand DSR 1182 Brick Jeera DSR 0773 Lime DSR 9999 Gur & Belgiri Labour DSR 0123 Mason (brick layer) 1 st class DSR 0114 Beldar Extra Labour for mixing DSR 0115 Coolie DSR 0101 Bhisti DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Unit Quantity Rate in Rs Amount in Rs Cum Cum Quintal LS 0.11 0.11 0.69 33 1,120.00 700.00 800.00 1.70 123.20 77.00 552.00 56.10 day day 3.05 3.00 393.00 297.00 1,198.65 891.00 day day LS 1 1.00 34.00 297.00 328.00 1.70 297.00 328.00 57.80 3,580.75 35.81 3,616.56 542.48 4,159.04 415.90 Cost of 1 Sqm 9.19 Code Repointing of raked out joints of Ashlar masonry by using lime mortar 1:1:1 (1Lime:1coarse sand:1 Surkhi) Description ISOR 11.9 Details of cost for 10 Sqm. Materials DSR 0773 Lime mortar 1:1:1 Labour DSR 0123 Mason (brick layer) 1 st class DSR 0114 Beldar DSR 9999 Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Unit Cum day day LS Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.1 6,806.02 680.60 2.5 3.00 125.00 393.00 297.00 1.70 982.50 891.00 212.50 2,766.60 27.67 2,794.27 419.14 3,213.41 321.34 10.0 STONE WORKS 10.1 10.1.1 Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing filled with a grout of average 12 mm thick lime mortar 1:2 (1 lime : 2 coarse sand) including pointing in lime mortar and an admixtureof pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red Sand stone -Exposed face fine dressed with rough backing 70mm thick Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.1.2 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 Description Details of cost for 1 Sqm MATERIAL: Finished work 70cudm + add wastage 33.3% =23.31 . Total 93.31 Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 93.31x2.30 =214.61 kg = 0.215 t Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Quantity Rate in Rs Amount in Rs 93.31 65.00 606.52 Cum 0.02 7,005.52 151.32 tonne 0.22 94.80 20.38 123.00 1.70 209.10 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 55.00 1.70 93.50 2,488.08 24.88 2,512.96 376.94 2,889.90 LS 60mm thick Description Unit Details of cost for 1 Sqm MATERIAL Finished work 60cudm + add wastage 33.3% =19.98 . Total= 10 cudm 80 Mortar for laying and pointing Cum Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 80x2.30 =184 kg = 0.184 t Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class tonne LS day day Quantity Rate in Rs Amount in Rs 80.00 65.00 520.00 0.02 7,005.52 151.32 0.18 94.80 17.44 118.00 1.70 200.60 1.35 0.03 361.00 393.00 487.35 12.58 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.1.3 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.1.4 Code DSR 1160 3.7 Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm day day day 0.22 0.11 0.22 297.00 297.00 328.00 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 50.00 1.70 85.00 2,381.63 23.82 2,405.44 360.82 2,766.26 50mm thick Description Details of cost for 1 Sqm MATERIAL Finished work 50cudm + add wastage 33.3% =16.65 . Total= 66.65 Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Quantity Rate in Rs Amount in Rs 66.70 65.00 433.55 Cum 0.02 7,005.52 151.32 tonne 0.15 94.80 14.54 105.00 1.70 178.50 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 23.71 1.70 40.31 2,225.49 22.25 2,247.74 337.16 2,584.90 LS 40mm thick Description Details of cost for 1 Sqm MATERIAL: Finished work 40cudm + add wastage 33.3% Mortar for laying and pointing Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 53.32 0.02 65.00 7,005.52 346.58 151.32 DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm tonne DSR 9999 Extra for using Sand dust powder 0.12 94.80 11.63 LS 32.29 1.70 54.90 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 23.71 1.70 40.31 2,012.00 20.12 2,032.12 304.82 2,336.93 10 cudm Cum 39.99 0.02 65.00 7,005.52 259.94 151.32 0.09 94.80 8.72 LS 32.29 1.70 54.90 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 23.71 1.70 40.31 1,922.44 19.22 1,941.67 291.25 2,232.92 LABOUR DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.1.5 Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 30mm thick Details of cost for 1 Sqm MATERIAL: DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 Finished work 30cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm tonne 10.2 10.2.1 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.2.2 Code DSR 1160 3.1.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 Red Sand stone -Exposed face machine cut and table rubbed with rough backing 70mm thick Description Details of cost for 1 Sqm MATERIAL Finished work 70cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding and sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 93.31 0.02 65.00 7,005.52 606.52 151.32 0.21 94.80 20.35 190.00 1.70 323.00 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 95.00 1.70 161.50 3,343.13 33.43 3,376.56 506.48 3,883.05 tonne LS 60mm thick Description Details of cost for 1 Sqm MATERIAL: Finished work 60cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 79.98 0.02 65.00 7,005.52 519.87 151.32 0.18 94.80 17.44 175.00 1.70 297.50 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 tonne LS DSR 9999 Scaffolding and sundries Total Add water charges 1% Total Add CPOH @ 15% L.S 75.00 1.70 Cost of 1 Sqm 10.2.3 50mm thick Code DSR 1160 3.1.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.2.4 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 127.50 3,194.08 31.94 3,226.02 483.90 3,709.93 Description Details of cost for 1 Sqm MATERIAL: Finished work 50cudm + add wastage 33.3% =16.65 . Total= 66.65 Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical Scaffolding and sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Quantity Rate in Rs Amount in Rs 66.65 65.00 433.23 Cum 0.02 7,005.52 151.32 tonne 0.15 94.80 14.53 169.00 1.70 287.30 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day m L.S 0.54 0.40 0.40 0.40 0.40 4.00 65.00 361.00 328.00 297.00 297.00 328.00 9.00 1.70 194.07 132.25 119.75 119.75 132.25 36.00 110.50 3,077.33 30.77 3,108.10 466.22 3,574.32 LS 40mm thick Description Details of cost for 1 Sqm MATERIAL: Finished work 40cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 53.32 0.02 65.00 7,005.52 346.58 151.32 0.12 94.80 11.63 153.00 1.70 260.10 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day 0.54 0.40 0.40 361.00 328.00 297.00 194.07 132.25 119.75 tonne LS DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.2.5 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.3 Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding and sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Description Details of cost for 1 Sqm MATERIAL: Finished work 30cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 10.3.1 70mm thick Details of cost for 1 Sqm MATERIAL Finished work 70cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 93.31x2.30 =214.61 kg = 0.215 t Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar DSR 9999 DSR 0125 DSR 0102 DSR 0114 297.00 328.00 119.75 132.25 m 4.00 9.00 36.00 L.S 35.00 1.70 59.50 2,909.58 29.10 2,938.67 440.80 3,379.48 Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 39.99 0.02 65.00 7,005.52 259.94 151.32 0.09 94.80 8.72 148.00 1.70 251.60 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 30.00 1.70 51.00 2,803.03 28.03 2,831.06 424.66 3,255.72 tonne LS White Sand stone -Exposed face fine dressed with rough backing Description DSR 2216 0.40 0.40 30mm thick Code DSR 1161 3.7 day day Unit 10 cudm Cum tonne LS day day day Quantity Rate in Rs Amount in Rs 93.31 0.02 70.00 7,005.52 653.17 151.32 0.21 94.80 20.35 180.00 1.70 306.00 1.35 0.03 0.22 361.00 393.00 297.00 487.35 12.58 66.53 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.3.2 Code DSR 1161 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.3.3 Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm day day 0.11 0.22 297.00 328.00 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 90.00 1.70 153.00 2,691.10 26.91 2,718.01 407.70 3,125.71 60mm thick Description Details of cost for 1 Sqm MATERIAL: Finished work 60cudm + add wastage 33.3% =19.98 . Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm = 80x2.30 =184 kg = 0.184 t Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 79.98 0.02 70.00 7,005.52 559.86 151.32 0.18 94.80 17.44 165.00 1.70 280.50 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 80.00 1.70 136.00 2,552.38 25.52 2,577.91 386.69 2,964.59 tonne LS 50mm thick Code Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 1 Sqm MATERIAL DSR 1161 Finished work 50cudm + add wastage 33.3% =16.65 . 10 cudm 3.7 Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm DSR 2216 66.65 70.00 466.55 Cum 0.02 7,005.52 151.32 tonne 0.15 94.80 14.53 DSR 9999 Extra for using Sand dust powder and polimer LS 162.00 1.70 275.40 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 361.00 328.00 487.35 12.58 66.53 40.43 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 75.00 1.70 127.50 2,449.73 24.50 2,474.23 371.13 2,845.36 LABOUR DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.3.4 Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 40mm thick Code Description Unit Quantity Rate in Rs Amount in Rs Details of cost for 1 Sqm MATERIAL DSR 1161 3.1.7 DSR 2216 DSR 9999 Finished work 40cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer 10 cudm Cum 53.32 0.02 70.00 7,005.52 373.24 151.32 0.12 94.80 11.63 155.00 1.70 263.50 day day day day day 1.35 0.03 0.22 0.11 0.22 361.00 393.00 297.00 297.00 328.00 487.35 12.58 66.53 33.26 73.47 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 65.00 1.70 110.50 2,317.45 23.17 2,340.62 351.09 2,691.72 tonne LS LABOUR DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 10.3.5 30mm thick Code Description Unit DSR 1161 Details of cost for 1 Sqm MATERIAL Finished work 30cudm + add wastage 33.3% 10 cudm 3.7 Mortar for laying and pointing Cum DSR 2216 Carriage of stone blocks white & red sand stone & kota tonne DSR 9999 Extra for using Sand dust powder and polimer LS Quantity Rate in Rs Amount in Rs 39.99 70.00 279.93 0.02 7,005.52 151.32 0.09 94.80 8.72 150.00 1.70 255.00 LABOUR Dressing charges DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35 DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58 DSR 0114 Beldar day 0.22 297.00 66.53 DSR 0115 Coolie day 0.11 297.00 33.26 DSR 0100 Bandhani Fixing charges day 0.22 328.00 73.47 DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07 DSR 0100 Bandhani day 0.40 328.00 132.25 DSR 0114 Beldar day 0.40 297.00 119.75 DSR 0115 Coolie day 0.40 297.00 119.75 DSR 0101 Bhisti day 0.40 328.00 132.25 DSR 1237 Cutting sand stone slab up to 50 mm thick by mechanical device m 4.00 9.00 36.00 DSR 9999 Scaffolding L.S 60.00 1.70 102.00 Total Add water charges 1% 2,204.23 22.04 Total 2,226.27 Add CPOH @ 15% 333.94 Cost of 1 Sqm 2,560.22 10.4 White Sand stone -Exposed face machine cut and table rubbed with rough backing 10.4.1 70mm thick Code DSR 1161 3.1.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 Description Details of cost for 1 Sqm MATERIAL: Finished work 70cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 93.31 0.02 70.00 7,005.52 653.17 151.32 0.21 94.80 20.35 195.00 1.70 331.50 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day 0.54 0.40 361.00 328.00 194.07 132.25 tonne LS DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 10.4.2 60mm thick Code DSR 1161 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.4.3 Code DSR 1160 3.7 DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 day day day m L.S Description Details of cost for 1 Sqm MATERIAL Finished work 60cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder and polimer LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Cum 0.40 0.40 0.40 4.00 85.00 297.00 297.00 328.00 9.00 1.70 119.75 119.75 132.25 36.00 144.50 3,381.29 33.81 3,415.10 512.27 3,927.37 Quantity Rate in Rs Amount in Rs 79.98 0.02 70.00 7,005.52 559.86 151.32 0.18 94.80 17.44 185.00 1.70 314.50 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 78.00 1.70 132.60 3,256.17 32.56 3,288.73 493.31 3,782.04 tonne LS 50mm thick Description Details of cost for 1 Sqm MATERIAL Finished work 50cudm + add wastage 33.3% =16.65 . Total= 66.65 Extra for using Sand dust powder and polimer Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Unit 10 cudm Quantity Rate in Rs Amount in Rs 66.65 70.00 466.55 Cum 0.02 7,005.52 151.32 tonne 0.15 94.80 14.53 175.00 1.70 297.50 2.70 0.06 0.45 0.22 361.00 393.00 297.00 297.00 974.70 25.15 133.06 66.53 LS day day day day DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.4.4 Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm DSR 2216 DSR 9999 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 10.4.5 Code DSR 1161 3.7 DSR 2216 DSR 9999 0.45 328.00 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 75.00 1.70 127.50 3,137.86 31.38 3,169.23 475.39 3,644.62 40mm thick Code DSR 1161 3.7 day Description Details of cost for 1 Sqm MATERIAL Finished work 40cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit 10 cudm Cum Quantity Rate in Rs Amount in Rs 53.32 0.02 70.00 7,005.52 373.24 151.32 0.12 94.80 11.63 165.00 1.70 280.50 day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 65.00 1.70 110.50 3,007.64 30.08 3,037.72 455.66 3,493.37 tonne LS 30mm thick Description Details of cost for 1 Sqm MATERIAL Finished work 30cudm + add wastage 33.3% Mortar for laying and pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Extra for using Sand dust powder Unit 10 cudm Cum tonne LS Quantity Rate in Rs Amount in Rs 39.99 0.02 70.00 7,005.52 279.93 151.32 0.09 94.80 8.72 157.00 1.70 266.90 DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0125 DSR 0100 DSR 0114 DSR 0115 DSR 0101 DSR 1237 DSR 9999 LABOUR Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1st Class Beldar Coolie Bandhani Fixing charges Mason (for plain stone work) 2nd class Bandhani Beldar Coolie Bhisti Cutting sand stone slab up to 50 mm thick by mechanical device Scaffolding Total Add water charges 1% Total Add CPOH @ 15% day day day day day 2.70 0.06 0.45 0.22 0.45 361.00 393.00 297.00 297.00 328.00 974.70 25.15 133.06 66.53 146.94 day day day day day 0.54 0.40 0.40 0.40 0.40 361.00 328.00 297.00 297.00 328.00 194.07 132.25 119.75 119.75 132.25 m 4.00 9.00 36.00 L.S 63.00 1.70 107.10 2,894.42 28.94 2,923.37 438.50 3,361.87 Cost of 1 Sqm 10.5 Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing filled with a grout of average 20 mm thick lime mortar 1:2 (1 lime : 2 coarse sand) including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixtureof pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : 25 mm thick Kota stone slabs exposed face dressed and rubbed Code DSR 1169 3.7 DSR 9999 DSR 2216 DSR 0125 DSR 0114 DSR 0115 DSR 0139 DSR 9999 10.6 Description Details of cost for 10 sqm. MATERIAL Kota stone slab 25mm thick (rough chiseled) Limemortar 1:2 (1 Lime :2 Coarse sand) Lime mortar for pointing Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm LABOUR Mason (for plain stone work) 2nd class Beldar Coolie Skilled Beldar (For floor rubbing etc) Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Unit Sqm Cum LS tonne day day day day LS Quantity Rate in Rs Amount in Rs 11.50 0.24 235.00 210 7,005.52 1.70 2,415.00 1,681.32 399.50 0.66 94.80 62.69 7.80 7.80 5.16 12.96 133.85 361.00 297.00 297.00 328.00 1.70 2,815.80 2,316.60 1,532.52 4,250.88 227.54 15,701.85 157.02 15,858.87 2,378.83 16,015.89 1,601.59 Wall lining butch work upto 10 m height with Dholpur stone 40 mm thick rough facing on the exposed surface with stone strips of minimum length 300 mm and required width, including embedding every tenth layer and bottom most layer in masonry or concrete after making necessary chases of size 75x75 mm and by providing layer of 75 mm thick strips i/c 20 mm thick bed of lime mortar 1:3 (1 lime : 3 coarse sand) i/c ruled pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment to match the shade of stone complete as per direction of Engineer-incharge 40 mm thick Dholpur stone slabs Code DSR 7.36 DSR 1165 Description Unit Details of cost for 1 sqm. MATERIAL Dholpur stone 40mm thick Wall face = 1.00sqm. Deduct for Sqm embed within 3x0.04x0.10=0.012 sqm Quantity Rate in Rs Amount in Rs 0.94 215 201.80 DSR 1163 White sand stone slab 75 mm thick (un-dressed) Sqm 0.13 300 39.00 DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm 0.94x0.04 =0.0376 cum. 0.13x0.075 =0.01 cum=0.0476 Cum=47.6 cudm tonne 0.11 94.80 10.38 DSR 1237 Cutting marble or sand stone slab up to 50mm thick by mechanical device assuming 50mm thick strips 20x1.0 = 20metre lime mortar with coarse sand 1:2 for (a) stone backing 12mm thick = 0.0144 cum (b) for fixing of stone = 0.40/25 = 0.0160 cum Total = 0.0304 cum m 20.00 9.00 180.00 3.7 Limemortar 1:2 (1 Lime :2 Coarse sand) 20mm thickness Cum 0.03 7,005.52 212.97 m 3.00 77.65 232.95 LS 48.52 1.70 82.48 day day day day LS 0.30 0.30 0.60 0.04 32.29 393.00 361.00 297.00 328.00 1.70 117.90 108.30 178.20 11.81 54.90 1,430.68 11.98 1,442.65 181.46 1,624.11 DSR 0126 DSR 0125 DSR 0114 DSR 0101 DSR 9999 Making chases up to 7.5x7.5 cm in walls including making good and finishing with matching surface after housing G.I. pipe etc Lime mortar for pointing LABOUR Mason (for ornamental stone work) 1 st class Mason (for plain stone work) 2nd class Beldar Bhisti Sundries and scaffolding brushes etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 10.7 Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 20 mm thick in lime mortar 1:3 (1 lime : 3 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). DSR 18.78 DSR 9999 Code DSR 8.1.1.2 DSR 7453 DSR 2216 3.9 DSR 0126 DSR 0100 DSR 0114 DSR 0115 DSR 0128 DSR 0102 DSR 9999 Description Unit Details of cost for 1 sqm. MATERIAL Raj nagar plain white marble (table rubbed and polished) 18 Sqm mm thick (slab area more than 0.50 sqm) Carriage of stone blocks white & red sand stone & kota tonne stone slab Limemortar 1:3 (1 Lime :3 Coarse sand) 20mm thickness LABOUR Mason (for ornamental stone work) 1 st class Bandhani Beldar Coolie Mate Blacksmith 1st class Sundries and scaffolding Total Add water charges 1% Total Quantity Rate in Rs Amount in Rs 1.20 1,100.00 1,320.00 0.06 94.80 5.69 Cum 0.03 7,588.17 254.96 day day day day day day LS 0.80 0.80 0.80 0.80 0.40 0.32 32.29 393.00 328.00 297.00 297.00 328.00 393.00 1.70 315.97 263.71 238.79 238.79 129.89 127.33 54.90 2,950.03 29.50 2,979.53 Add CPOH @ 15% 446.93 3,426.46 Cost of 1 Sqm 10.8 Marble work gang saw cut (polished and machine cut) of thickness 18 mm for cladding over dome (veneer work), backing filled with a grout of average 20 mm thick in lime mortar 1:3 (1 lime : 3 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). Code DSR 8.1.1.2 DSR 7453 DSR 2216 3.9 DSR 0126 DSR 0100 DSR 0114 DSR 0115 DSR 0128 DSR 0102 DSR 9999 10.12 Description 1,100.00 1,540.00 0.06 94.80 5.69 Limemortar 1:3 (1 Lime :3 Coarse sand) 20mm thickness Cum 0.04 7,588.17 305.95 day day day day day day LS 1.01 1.01 1.01 1.01 0.50 0.41 32.29 393.00 328.00 297.00 350.00 120.00 510.00 1.70 394.97 329.64 298.49 351.75 59.40 206.55 54.90 3,547.33 35.47 3,582.80 537.42 4,120.22 LABOUR Mason (for ornamental stone work) 1 st class Bandhani Beldar Coolie Mate Blacksmith 1st class Sundries and scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including providing and fixing with 4 Nos gun metal cramp 25x6 mm 30 cm long and dowel bars 7.5 cm long 6 mm dia as per design Description Unit 61.26 DSR 1160 Red sand stone block 3.7 lime Mortar 1:2 (1lime:2 coarse sand)for laying and pointing Cum DSR 0125 DSR 0102 DSR 0114 DSR 0115 DSR 0100 DSR 0373 DSR 0125 DSR 0102 DSR 0114 DSR 0115 Quantity Rate in Rs Amount in Rs Details of cost for 1 bracket MATERIAL Quantity of stone for 1 bracket 1 x 55 x 22.5 x 45cm = 0.056cum or 56 cudm. Considering 10% wastage DSR 2216 Quantity Rate in Rs Amount in Rs 1.40 Code DSR 7.31 Unit Details of cost for 1 sqm. MATERIAL Raj nagar plain white marble (table rubbed and polished) 18 Sqm mm thick (slab area more than 0.50 sqm) Carriage of stone blocks white & red sand stone & kota tonne stone slab Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm LABOUR: Dressing charges Mason (for plain stone work) 2nd class Blacksmith 1 st class Beldar Coolie Bandhani Cramp Gun metal 25x6x300 mm Fixing charges Mason (for plain stone work) 2nd class Blacksmith 1 st class Beldar Coolie 10 cudm 61.26 65.00 398.17 0.21 7,005.52 147.12 tonne 0.14 94.80 13.36 day day day day day Each 1.79 0.04 0.27 0.14 0.27 4.00 361.00 393.00 297.00 297.00 328.00 80.00 647.13 14.54 80.49 40.24 88.89 320.00 day day day day 0.30 0.04 0.15 0.15 361.00 393.00 297.00 297.00 106.74 15.85 43.91 43.91 DSR 0100 DSR 0101 DSR 0126 DSR 9999 Bandhani Bhisti Extra labour for ornamental finish Mason (for ornamental stone work) 1 st class Sundries and scaffolding brushes etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm day day 0.15 0.15 328.00 328.00 48.49 48.49 day 1.14 393.00 448.02 265.00 1.70 450.50 2,955.83 29.56 2,985.39 447.81 3,433.20 LS 10.13 Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured along the slope in lime mortar 1:1:1 (1 lime : 4 coarse sand) with 12 mm diameter anchoring steel bar, 45 cm long, fixed in each stone and supported on and including with bricks cove in lime mortar 1:4 (1lime : 4 coarse sand), including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an admixture of pigment matching the stone shade 10.12.1 Red sand stone Code Description Unit Quantity Rate in Rs Amount in Rs MATERIAL DSR 7.28.1 Details of cost for a chajja of 2.00 sqm (finished work) DSR 1002 Chisel dressed 80cm sloping length plus 20cm bearing Area = 2.5xl.00=2.50sqm Red sand stone slab 40 mm thick (un-dressed) Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm LABOUR: Dressing charges Mason (for plain stone work) 2nd class Anchoring steel bars 12mm dia. 45cm long 5 Nos. @ 0.80kg/m = 0.02q Mild steel round bar 12 mm dia and below DSR 9999 Cutting threads and cost of nuts, washers, etc LS 67.34 1.70 114.48 DSR 9999 DSR 9999 Pigment Extra for using lime Fixing charges Mason (for plain stone work) 2nd class Beldar Sundries and scaffolding brushes etc Brick cover support 4 courses with bricks of class designation 75 4x7+5+5=38cm girth 2.5m length Cost of Brick cover support. LS LS 25.00 98.00 1.70 1.70 42.50 166.60 day day LS 1.20 1.80 355.00 361.00 297.00 1.70 433.20 534.60 603.50 LS 175.00 1.70 297.50 0.02 9,613.35 207.65 DSR 1164 DSR 2216 DSR 0125 DSR 0125 DSR 0114 DSR 9999 DSR 9999 5.6.1 Sqm 2.75 190.00 522.50 tonne 0.25 94.80 23.98 day 0.50 361.00 180.50 quintal 0.02 4,500.00 90.00 Brick work in triangular gap above cover with bricks of class designation 7.5 in lime mortar 1:1:1(1lime:1 surkhi:1 fine Cum sand)-1/2x2.5x0.2x0.07=0.018cum Total Add water charges 1% Total Add CPOH @ 15% Cost of 2 Sqm 3,217.01 30.09 3,247.10 455.92 3,703.02 1,851.51 Cost of 1 Sqm 10.12.2 Code DSR 7.28.2 White sand stone Description Details of cost for a chajja of 2.00 sqm (finished work) Unit Quantity Rate in Rs Amount in Rs Chisel dressed 80cm sloping length plus 20cm bearing Area = 2.5xl.00=2.50sqm DSR 1165 white sand stone slab 40 mm thick (un-dressed) Sqm 2.75 215.00 591.25 DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm tonne 0.25 94.80 23.98 day 0.50 361.00 180.50 quintal 0.02 4,500.00 90.00 DSR 1002 LABOUR: Dressing charges Mason (for plain stone work) 2nd class Anchoring steel bars 12mm dia. 45cm long 5 Nos. @ 0.80kg/m = 0.02q Mild steel round bar 12 mm dia and below DSR 9999 Cutting threads and cost of nuts, washers, etc LS 67.34 1.70 114.48 DSR 9999 DSR 9999 Pigment Extra for using lime Fixing charges Mason (for plain stone work) 2nd class Beldar Sundries and scaffolding brushes etc Brick cover support 4 courses with bricks of class designation 75 4x7+5+5=38cm girth 2.5m length =38cmx2.5m=95cm Cost of Brick cover support. Brick work in triangular gap above cover with bricks of class designation 7.5 in lime mortar 1:1:1(1lime:1 surkhi:1 fine sand)-1/2x2.5x0.2x0.07=0.018cum Total Add water charges 1% Total Add CPOH @ 15% Cost of 2 Sqm Cost of 1 Sqm LS LS 25.00 98.00 1.70 1.70 42.50 166.60 day day LS 1.20 1.80 355.00 361.00 297.00 1.70 433.20 534.60 603.50 LS 175.00 1.70 297.50 0.02 9,613.35 207.65 DSR 0125 DSR 0125 DSR 0114 DSR 9999 DSR 9999 5.6.1 Cum 3,285.76 30.78 3,316.54 466.33 3,782.88 1,891.44 10.14 Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm wide projection in lime mortar 1:3 (1 lime : 3 coarse sand) including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an admixture of pigment matching the stone shade 10.14.1 Red sand stone Code DSR 7.29.1 Description Unit Quantity Rate in Rs Amount in Rs Details of cost for (2.5x0.75m)= 1.875 sqm MATERIAL Taking 2.5mx75cm projection + 15cm bearing = 2.5x0.9 = 2.25 sqm DSR 1164 Red sand stone slab 40 mm thick (un-dressed) Sqm 2.25 190.00 427.50 DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm tonne 0.21 94.80 19.62 LABOUR: Dressing charges DSR 0125 Mason (for plain stone work) 2nd class day 0.45 361.00 162.45 DSR 9999 DSR 9999 Pigment Extra for using lime Fixing charges Mason (for plain stone work) 2nd class Beldar LS LS 6.25 26.91 1.70 1.70 10.63 45.75 day day 0.72 0.96 361.00 297.00 259.92 285.12 DSR 0125 DSR 0114 DSR 9999 Sundries and scaffolding brushes etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 1.875 Sqm LS 415.00 1.70 Cost of 1 Sqm 10.14.2 Code DSR 7.29.2 DSR 1165 DSR 2216 DSR 0125 DSR 9999 DSR 9999 DSR 0125 DSR 0114 DSR 9999 10.15 Code DSR 7.30 DSR 2216 705.50 1,916.49 19.16 1,935.65 290.35 2,226.00 1,187.20 White sand stone Description Details of cost for (2.5x0.75m)= 1.875 sqm MATERIAL Taking 2.5mx75cm projection + 15cm bearing = 2.5x0.9 = 2.25 sqm White sand stone slab 40 mm thick (un-dressed) Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm LABOUR: Dressing charges Mason (for plain stone work) 2nd class Pigment Extra for using lime Fixing charges Mason (for plain stone work) 2nd class Beldar Sundries and scaffolding brushes etc Total Add water charges 1% Total Add CPOH @ 15% Cost of 1.875 Sqm Cost of 1 Sqm Unit Quantity Rate in Rs Amount in Rs Sqm 2.25 215.00 483.75 tonne 0.21 94.80 19.62 day LS LS 0.45 6.25 26.91 361.00 1.70 1.70 162.45 10.63 45.75 day day LS 0.72 0.96 478.00 361.00 297.00 1.70 259.92 285.12 812.60 2,079.84 20.80 2,100.63 315.10 2,415.73 1,288.39 30 mm red sand stone sun-shade (chisel-dressed) supported on red sand stone brackets, fixed in walls with lime mortar 1:3 (1 lime : 3coarse sand), including finishing complete Description Unit Details of cost for window 1.6m length and 0.70m width = 1.12 sqm MATERIAL overall width 0.70+0.15=0.85 metres. Total area = 1.6x0.85=1.36sqm Red stone brackets (chisel dressed) 30mm average thickness over all width of brackets 0.53+0.23=0.76m 2x0.3x0.76=0.46 Total 1.36+0.46 =1.82sqm Add wastage @10% = 0.18sqm. Total = 2.00 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Quantity Rate in Rs Amount in Rs tonne 0.14 94.80 13.08 0.01 7,588.17 68.29 1.03 0.60 286.00 361.00 297.00 1.70 372.55 178.20 486.20 1,378.33 13.78 1,392.11 3.9 Lime Mortar 1:3(1 Lime: 3 Coarse sand) LABOUR: Dressing & Fixing charges Cum DSR 0125 DSR 0114 DSR 9999 Mason (for plain stone work) 2nd class Beldar Sundries and scaffolding brushes etc Total Add water charges 1% Total day day LS Add CPOH @ 15% 208.82 1,600.93 Cost of 1 Sqm 10.16 Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in lime mortar 1:1:1 (1 lime : 1Surkhi:1 Fine sand), including pointing with lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment matching the stone shade 10.16.1 Red Sand stone Code Description Unit Quantity Rate in Rs Amount in Rs DSR 7.32.1 & Details of cost for cornices (30cm long 30cm deep and ISOR 2.19 7.5cm project-iron) = 6.75cudm or 0.00675 cum. MATERIAL: 6.6.1.1 DSR 9999 DSR 0125 DSR 0114 Rate as per Item Number 6.6.1.1 of SH: Extra for using stone dust powder and labour for making cornices LABOUR Mason (for plain stone work) 2nd class cum 0.01 30,640.50 L.S 6.40 1.70 10.87 day 0.15 361.00 54.15 Beldar Total day 0.15 297.00 44.55 109.57 Add water charges 1% 1.10 Total 110.67 Add CPOH @ 15% 16.60 127.27 334.09 Cost of 0.00675 Cum Cost of 1 Cum 10.16.2 DSR 7.32.2 6.6.2.2 DSR 9999 DSR 0125 DSR 0114 206.82 49,495.21 White Sand stone Details of cost for cornices (30cm long 30cm deep and 7.5cm project-iron) = 6.75cudm or 0.00675 cum. MATERIAL: Rate as per Item Number 6.6.1.2 of SOR: Extra for using stone dust powder and labour for making cornices LABOUR Mason (for plain stone work) 2nd class Beldar Total Add water charges 1% Total cum 0.01 31,316.52 L.S 6.40 1.70 10.87 day day 0.16 0.16 361.00 297.00 55.96 46.04 112.86 1.13 113.99 17.10 131.09 342.48 50,737.35 Add CPOH @ 15% Cost of 0.00675 Cum Cost of 1 Cum 211.39 10.17 Providing and fixing stone jali 40 mm thick throughout in lime mortar 1:3 (1 lime : 3 coarse sand), including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc 10.17.1 Red sand stone Code DSR 7.33.1 DSR 1164 DSR 2216 Description Details of cost for 1 sqm. MATERIAL Red sand stone slab 30 mm thick (un-dressed) Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm Unit Quantity Rate in Rs Amount in Rs Sqm 1.10 190.00 209.00 tonne 0.10 94.80 9.59 3.9 DSR 0125 DSR 0114 DSR 9999 Lime Mortar 1:3(1 Lime: 3 Coarse sand) LABOUR: Mason (for plain stone work) 2nd class Beldar Sundries Total Add water charges 1% Total Add CPOH @ 15% Cum 0.02 7,588.17 113.82 day day LS 21.59 14.37 80.73 361.00 297.00 1.70 7,793.99 4,266.41 137.24 12,530.05 125.30 12,655.35 1,898.30 14,553.66 Cost of 1 Sqm 10.17.2 White sand stone C Code Description Unit Quantity Rate in Rs Amount in Rs DSR 7.33.2 Details of cost for 1 sqm. MATERIAL DSR 1165 White sand stone slab 30 mm thick (un-dressed) Sqm 1.10 215.00 236.50 DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab @ 2.30kg/cudm tonne 0.10 94.80 9.59 Cum 0.02 7,588.17 113.82 day day LS 21.72 14.45 80.73 361.00 297.00 1.70 7,839.84 4,291.50 137.24 12,628.50 126.28 12,754.78 1,913.22 14,668.00 3.9 DSR 0125 DSR 0114 DSR 9999 Lime Mortar 1:3(1 Lime: 3 Coarse sand) LABOUR Mason (for plain stone work) 2nd class Beldar Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm 10.18 Sandstone flooring as a plinth protection around the building using sand stone of 50mm thick & 1:1:1 lime mortar (1 lime:1surkhi:1 coarse sand) for filling up the joints. 10.18.1 Red Sand stone C Code DSR 11.28.1 Description Details of cost for 10 sqm Material Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm Unit Quantity Rate in Rs Amount in Rs DSR 1174 Red sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 11.00 172.00 1,892.00 DSR 9999 Carriage Lime mortar 1:(1 Lime:1 surkhi: 1 Coarse sand) i. For bedding ii. For Joining Lime mortar 1:1:1 (1 Lime:1 surkhi: 1 Coarse sand) LABOUR Mason Brick I Class Bandhani Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm LS 34.06 1.70 57.90 0.22 0.03 0.25 6,806.02 1,701.50 5.43 1.93 0.96 0.47 150.00 393.00 328.00 297.00 297.00 1.70 2,132.03 631.40 285.86 140.33 255.00 7,096.03 70.96 7,166.99 1,075.05 8,242.03 3.3 DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 day day day day LS Cost of 1 Sqm 10.18.2 C Code DSR 11.28.2 824.20 White Sand stone Description Details of cost for 10 sqm Material Finished work = 10sqm Add wastage 10% =1.00sqm Total = 11.00 sqm Unit Quantity Rate in Rs Amount in Rs DSR 1175 Red sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 11.00 225.00 2,475.00 DSR 9999 Carriage Lime mortar 1:(1 Lime:1 surkhi: 1 Coarse sand) i. For bedding ii. For Joining LS 34.06 1.70 57.90 0.25 6,806.02 1,701.50 5.43 1.93 0.96 0.47 150.00 393.00 328.00 297.00 297.00 1.70 2,132.03 631.40 285.86 140.33 255.00 7,679.03 76.79 7,755.82 1,163.37 8,919.19 891.92 3.3 Lime mortar 1:1:1 (1 Lime:1 surkhi: 1 Coarse sand) DSR 0123 DSR 0100 DSR 0115 DSR 0114 DSR 9999 Mason Brick I Class Bandhani Coolie Bhisti Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm 0.22 0.03 day day day day LS Cost of 1 Sqm 11.0 REPAIRS AND RECONSTRUCTION Repairs to plaster of thickness 10 mm to 30 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, preparation of mortar by traditional practice (by hand grinder) in 3 course & loi, tamping, beating, till the shrinkage cracks are disappear disposal of rubbish to the dumping ground within 50 metres lead with lime moratr 1:2 (1 lime: 2 surkhi) 11.1 10 to 30mm thick Code ISOR 4.2 Description Details of cost for 2.5Sqm. MATERIAL Unit 3.7 Lime plaster 1:2 (1 lime putty : 2 Coarse sand) DSR 0155 DSR 0114 DSR 0101 DSR 9999 LABOUR Mason (Average) Beldar Bhisti Scaffolding and Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm 11.2 Code DSR 14.13 Quantity Rate in Rs Amount in Rs Cum 0.23 7,005.52 1,611.27 day day day LS 1.21 1.83 0.92 1.88 456.17 543.51 301.76 3.20 2,915.90 29.16 2,945.06 441.76 3,386.82 1,354.73 377.00 297.00 328.00 1.70 Regrading terracing of mud phaska covered with tiles or brick, in lime by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in lime mortar 1:3 (1 lime : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 metres lead. Description Unit Quantity Rate in Rs Amount in Rs Details of cost of 10 Sqm MATERIAL (i) Dismantling tiles/bricks in lime mortar including removing mud plaster and cleaning the LABOUR DSR 0123 Mason First Class day 0.54 393.00 212.22 DSR 0114 Beldar day 0.54 297.00 160.38 (ii) Preparing the surface, for mud phuska to proper slope, relaying mud plaster gobri leeping DSR 0155 Mason First Class day 0.27 393.00 106.11 MATERIAL DSR 3.18 Mud mortar Cum 0.24 366.20 87.89 DSR 0308 Bhusa Quintal 0.08 400.00 33.60 Gobri mortar DSR 3.18 Mud mortar Cum 0.12 366.20 43.94 LABOUR DSR 0114 Beldar day 0.25 297.00 74.25 (iii) relaying tiles/bricks including lime mortar 1:3 (1 lime: 3 fine sand) for grouting 3.12 lime mortar 1:3 (1 lime: 3 fine sand) Cum 0.09 8,782.53 803.60 DSR 0123 Mason First Class day 1.80 393.00 707.40 DSR 0114 DSR 0101 DSR 9999 DSR 9999 Beldar Bhisti Disposal for mulba Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm day day LS LS 2.25 1.50 15.00 155.00 297.00 328.00 1.70 1.70 Cost of 1 Sqm 11.3 668.25 492.00 25.50 263.50 3,678.64 36.79 3,715.43 557.31 4,272.74 427.27 Removing brick tiles in 5 to 6 cm thick lime terracing from existing roof and relaying an average thickness 7.5 cm laid to fall with 25mm nominal brick size aggregate and 50% lime mortar 1:2 (lime putty : 2surkhi) rammed and finished with gur and belgiri treatment complete and covered with flat brick tiles of class designation 100 or 50mm thick red sand stone grouted with lime mortar 1:3(1 lime : 3 fine sand) mixed with 2% of integral water proofing compound by weight of lime, over 12mm layer of lime mortar 1:3(1lime:3 fine sand) or 25mm thick lime surkhi mortar 1:1:1(1 lime:1 surkhi:1fine sand) including filling the joints in rich lime mortar mixed with water proofing compound and pigment to match the shade of stone and finished neat. Code DSR 14.13 Description Unit Quantity Rate in Rs Amount in Rs Details of cost of 10 Sqm LABOUR 13.1.2 (i) Removing Brick tiles from existing roof Sqm 10.00 140.43 1,404.31 (ii) Preparing the surface, for lime mortar to proper slope, relaying lime mortar 1:2 (1lime putty: 2 Surkhi) DSR 0123 Mason First Class day 0.35 393.00 137.55 MATERIAL 8.1 Lime mortar 1:2 (1 lime: 2surkhi) Cum 1.01 9,341.38 9,458.15 (iii) relaying tiles/bricks including lime mortar 1:2 (1 lime: 2 fine sand) for grouting Flat brick/ terracotta tiles with lime mortar 1:2 (1 8.2 Sqm 10.50 624.91 6,561.55 lime: 2 fine sand) DSR 9999 Disposal for mulba LS 35.00 1.70 59.50 DSR 9999 Sundries LS 125.00 1.70 212.50 Total 17,833.56 Add water charges 1% 178.34 Total 18,011.90 Add CPOH @ 15% 2,701.78 Cost of 10 Sqm 20,713.68 Cost of 1 Sqm 2,071.37 11.4 11.4.1 Code DSR 14.14 DSR 0114 DSR 0115 Replacing Red/white sand stone slabs in roofing, laid in lime mortar 1:3 (1 lime : 3 coarse sand), including necessary repairs and lime pointing with same mortar complete, including disposal of rubbish to dumping ground within 50 metres of lead : Red/ White Sand stone Description Unit Details of cost of 10 Sqm LABOUR Dismantling existing stone, slabs roofing 1x10.00 sqmx0.05m = 0.50 cum Beldar day Coolie day Quantity Rate in Rs Amount in Rs 0.95 0.45 297.00 297.00 282.15 133.65 DSR 9999 Sundries LS 25.00 1.70 42.50 DSR 9999 Cleaning the surface including necessary repairs LS 55.00 1.70 93.50 Sqm 11.00 172.00 1,892.00 Sqm 1.39 94.80 131.91 Cum 0.11 7,588.17 849.87 day day day day LS Cum 3.50 4.00 3.50 1.50 125.00 0.50 393.00 328.00 297.00 328.00 1.70 106.64 1,375.50 1,312.00 1,039.50 492.00 212.50 53.32 7,910.41 79.10 7,989.51 1,198.43 9,187.94 918.79 DSR 1174 DSR 2216 3.1.9 DSR 0123 DSR 0100 DSR 0115 DSR 0101 DSR 9999 DSR 2264 MATERIAL Red sand stone slab 45 mm to 50 mm thick (undressed) Carriage of stone blocks white & red sand stone & kota stone slab Lime mortar 1:3(1lime:3 coarse sand) LABOUR Mason First class Bandhani Coolie Bhisti Sundries Carriage of rubbish Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm DSR 0114 DSR 0115 DSR 9999 Granite/ Marble stone Description Unit Details of cost of 10 Sqm LABOUR Dismantling existing stone, slabs roofing 1x10.00 sqmx0.05m = 0.50 cum Beldar day Coolie day Sundries LS DSR 9999 Cleaning the surface including necessary repairs LS 11.4.2 Code DSR 14.14 MATERIAL Granite of any colour, 30 mm thick (slab area DSR 7296 upto 0.50 sqm) Carriage of stone blocks white & red sand stone DSR 2216 & kota stone slab 3.9 Lime mortar 1:3(1lime:3 coarse sand) LABOUR DSR 0123 Mason First class DSR 0100 Bandhani DSR 0115 Coolie DSR 0101 Bhisti DSR 9999 Sundries DSR 2264 Carriage of rubbish Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 0.95 0.45 25.00 297.00 297.00 281.45 282.15 133.65 7,036.25 55.00 1.70 93.50 Sqm 11.00 2,300.00 25,300.00 Sqm 1.39 94.80 131.91 Cum 0.11 7,588.17 849.87 day day day day LS Cum 0.85 1.00 0.75 0.50 98.00 0.50 393.00 328.00 297.00 328.00 1.70 106.64 334.05 328.00 222.75 164.00 166.60 53.32 35,096.06 350.96 35,447.02 5,317.05 40,764.07 4,076.41 11.5 Code ISOR 8.1 DSR 0773 DSR 0773 DSR 0773 DSR 0983 DSR 0006 M Rate M rate DSR 0123 DSR 0114 DSR 0128 DSR 9999 DSR 9999 Providing post dated Damp Proof Course (DPC) by raking out mortar from brickwork atleast 75mm deep from both faces of wall at plinth height. The cavities formed must be cleaned by flushing with clean water. The clean surface with open cavities are next treated with limewater to attempt to consolidate the friable areas. The consolidation treatment is followed by pressure grouting with a line of close-spaced drilling (average 150mm centres) to be made and silicone solutions in solvent and the siliconate/latex mixture are pumped in under pressure. Description Details of cost of 10 m MATERIAL Lime for plaster work on both sides Lime to consolidate the fabric Lime for cleaning after racing out the existing pointing fine sand including wastage Equipment Gusmer for spray of chemicals Grouting Machine LABOUR Conservator Mason 1st class Beldar Mate Labour for drilling holes Sundries & Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 m Cost of 1 m Unit Quantity Rate in Rs Amount in Rs Quintal Quintal 2.00 2.00 800.00 800.00 1,600.00 1,600.00 Quintal 0.50 800.00 400.00 Cum 4.20 650.00 2,730.00 Days Days 4.00 4.00 250.00 1,000.00 1,000.00 4,000.00 Days Days Days Days LS LS 1.00 10.00 10.00 8.00 130.00 250.00 1,650.00 393.00 297.00 328.00 1.70 1.70 1,650.00 3,930.00 2,970.00 2,624.00 221.00 425.00 23,150.00 231.50 23,381.50 3,507.23 26,888.73 2,688.87 Stone consolidation-removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar(1:3) wherever necessary C Code Description Unit Quantity Rate in Rs Amount in Rs DSR 11.28.1 Details of cost for 1cum Material DSR 1157 Stone for masonry work Cum 0.61 700.00 423.50 DSR 1154 Through and bond stone 100 nos. 3.00 1,200.00 36.00 DSR 2215 Carriage LS 1.37 125.47 171.89 3.3 Lime mortar 1:3(1 Lime:3 Coarse sand) 0.30 7,588.17 2,276.45 LABOUR DSR 0123 Mason Brick I Class day 2.86 361.00 1,031.02 DSR 0100 Bandhani day 1.91 328.00 625.82 DSR 0115 Coolie day 0.85 297.00 253.04 DSR 0114 Bhisti day 0.11 328.00 35.42 DSR 9999 Sundries LS 3.00 1.70 5.10 Total 4,858.25 Add water charges 1% 48.58 Total 4,906.84 Add CPOH @ 15% 736.03 Cost of 1 Cum 5,642.86 11.6 12.0 TREATMENT OF CRACKS 12.1 Repairing of .5mm to 5 mm wide open joints / cracks in all types of sand stone masonry work including scrapping of loose jointing material from cracks. The inner side to be filled/pointed with lime mortar with wooden trowel and fixing grouting nipple from outer side as directed by Architect. Then apply lime mortar by injection grouting through 5mm diameter nozzle through the pre fix nipple up to total thickness of existing stone wall and removing the PVC nipple pipe, lime moratr of mix lime & sand 1:1 mix with polymer using katha or other additives to achieve require matching colour and including cost of all materials, labour, machinery, equipment, curing and cleaning the site as directed. Code ISOR 9.1 Description Details of cost of 10 lit MATERIAL 3.3 Lime mortar 1:1:1 Equipment DSR 0006 sprayer for chemicals M Rate Grouting Machine M Rate Stone cutter machine LABOUR Mrate Conservator DSR 0123 Mason 1st class DSR 0114 Beldar DSR 0128 Mate DSR 9999 Sundries , Polimer & Scaffolding Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 lit Unit Quantity Rate in Rs Amount in Rs Cum 0.03 6,806.02 204.18 Days Days Days 0.05 0.01 0.05 250.00 1,000.00 650.00 12.50 10.00 32.50 Days Days Days Days LS 0.01 0.25 0.25 0.05 89.00 1,650.00 393.00 297.00 328.00 1.70 16.50 98.25 74.25 16.40 151.30 615.88 6.16 622.04 93.31 715.35 71.53 Cost of 1 lit 12.2 Code DSR 8737 DSR 8666 DSR 0123 DSR 0114 DSR 9999 Providing and fixing chicken wire mesh (6mm x 6mm) of 24 gauge 200 mm wide along the joints of R.C.C. work and brick work with hooks/nails etc. complete so as to receiving the plastering work over chicken mesh as per the direction of Engineer-in-charge. Description Rate for 1 sqm. Stainless steel Wire mesh Stainless steel screws Labour for cutting and fixing at any height. Mason Beldar Sundries Total Add water charges 1% Total Add CPOH @ 15% Cost of 1 Sqm Unit Quantity Rate in Rs Amount in Rs sqm 100 Nos 1.02 120.00 830.00 32.00 846.60 38.40 day day LS 0.05 0.05 48.00 393.00 297.00 1.70 19.65 14.85 81.60 1,001.10 10.01 1,011.11 151.67 1,162.78 12.3 Code DSR 0123 DSR 0114 DSR 9999 12.4 Code Steel-rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless steel rods of 90cms length of which 15cm on either side and cold bending at 90degrees. The stainless steel clamps to be fixed perpendicular to the crack by drilling in stone and fixing with cement and aradite mixture in such a way that the entire length of the rod is in complete contact of the stone and the bent ends are fully inserted in the cracked stone. Use 316 grade stainless steel charge per hole.steel rod charges are counted per kg.Holes with 6mm, 8mm, 10mm or 12mm dia.as per requirement of position. Description Rate of Each Rod Steel rods of 8mm Labour for drilling the hole, bending and fixing and fixing at any height. Mason Beldar Sundries, white cement araldite mixture Total Add water charges 1% Total Add CPOH @ 15% Cost of Each rod Unit Quintol day day LS Quantity Rate in Rs Amount in Rs 0.01 4,200.00 21.00 0.09 0.09 48.00 393.00 297.00 1.70 35.37 26.73 81.60 164.70 1.65 166.35 24.95 191.30 Stitching of cracks in brick masonry with stone lintels of 450x 200x50 mm . Chasing, grooving the brick masonry and inserting the stone lintel. All around the stone, lime mortar should be properly packed . Description Unit Quantity Rate in Rs Amount in Rs Rate of Each Stone lintel of size 450x200x50 No 1.00 150.00 150.00 Labour for chasing and grooving the brick surface and inserting the stone lintel over the lime mortar DSR 0123 DSR 0114 DSR 9999 12.5 Code DSR 0114 DSR 0115 DSR 9999 Mason First class Beldar Sundries, lime mortar,etc Total Add water charges 1% Total Add CPOH @ 15% day day LS Cost of Each stone 0.05 0.05 20.00 393.00 297.00 1.70 19.65 14.85 34.00 218.50 2.19 220.69 33.10 253.79 Propping with steel to support the leaned structure ( roof and wall) using pipes, channels, angles, girders , wooden wages to prevent further leaning/ collapse Description Unit Quantity Rate in Rs Amount in Rs Rate for 1 sqm. Materials Pipes, Shannels, girders, Wooden wages, etc LS 225.00 1.70 382.50 Labour Beldar day 0.70 297.00 207.90 Coolie day 0.80 297.00 237.60 Sundries LS 10.00 1.70 17.00 Total 845.00 Add water charges 1% 8.45 Total 853.45 Add CPOH @ 15% 128.02 Cost of 1Sqm 981.47 13.0 DISMANTLING WORKS Dismantling tile work in floors and roofs laid in lime mortar including stacking material within 50m lead for thickness of tiles. For thickness of tiles above 10mm to 25 mm 13.1.1 Code Description Unit Quantity Rate in Rs Amount in Rs DSR 15.23.1 Details of cost for 10 Sqm LABOUR DSR 0123 Mason Brick layer first class day 1.00 393.00 393.00 DSR 0114 Beldar day 0.75 297.00 222.75 DSR 0115 Coolie day 0.85 297.00 252.45 DSR 9999 Sundries L.S 55.00 1.70 93.50 Total 961.70 Add water charges 1% 9.62 Total 971.32 Add CPOH @ 15% 145.70 Cost of 10 Sqm 1,117.01 Cost of 1 Sqm 111.70 13.1 For thickness of tiles above 25 mm and up to 40 mm 13.1.2 Code Description Unit DSR 15.23.1 Details of cost for 10 Sqm LABOUR DSR 0123 Mason Brick layer first class day DSR 0114 Beldar day DSR 0115 Coolie day DSR 9999 Sundries L.S Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Cost of 1 Sqm Quantity Rate in Rs Amount in Rs 1.30 1.00 0.95 70.00 393.00 297.00 297.00 1.70 510.90 297.00 282.15 119.00 1,209.05 12.09 1,221.14 183.17 1,404.31 140.43 Careful removal of existing deteriorated/ damaged/ weathered lime plaster without damaging the surface below it. Code Description Unit Quantity Rate in Rs Amount in Rs DSR 15.23.1 Details of cost for 10 Sqm LABOUR DSR 0123 Mason First class day 1.00 393.00 393.00 DSR 0114 Beldar day 1.00 297.00 297.00 DSR 0115 Coolie day 1.25 297.00 371.25 DSR 9999 Sundries and scaffolding L.S 700.00 1.70 1,190.00 Consumables like Hand gloves, safety glass and DSR 9999 L.S 150.00 1.70 255.00 belt, helmet Total 2,506.25 Add water charges 1% 25.06 Total 2,531.31 Add CPOH @ 15% 379.70 Cost of 10 Sqm 2,911.01 Cost of 1 Sqm 291.10 13.2 13.3 Code DSR 0114 DSR 0114 Raking out the joints of country/Nankshahi brick, scooping out dead and decayed mortar very slowly and carfully with scooping rods, then washing complete with hand spray pump. Preparing the surface for replastering including disposal of rubbish with 250m lead Description Details of cost for 10 Sqm. Labour for Raking Beldar Labour for Washing Beldar Scaffolding, pumps for watering Sundries & Contingencies @ 4% Total Add water charges 1% Total Add CPOH @ 15% Cost of 10 Sqm Unit Cost of 1 Sqm Quantity Rate in Rs Amount in Rs day 2.25 297.00 668.25 day 2.75 393.00 1,080.75 141.93 68.12 1,959.05 19.59 1,978.64 296.80 2,275.44 227.54 Raking out joints of brick masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for re13.4 pointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead. Code Description Unit Quantity Rate in Rs Amount in Rs DSR 15.23.1 Details of cost for 10 Sqm LABOUR DSR 0123 Mason First class day 1.20 393.00 471.60 DSR 0114 Beldar day 1.00 297.00 297.00 DSR 0115 Coolie day 1.00 297.00 297.00 DSR 0101 Bhisti day 0.70 377.00 263.90 DSR 9999 Sundries and scaffolding L.S 300.00 1.70 510.00 Total 1,839.50 Add water charges 1% 18.40 Total 1,857.90 Add CPOH @ 15% 278.68 Cost of 10 Sqm 2,136.58 Cost of 1 Sqm 213.66 14.1 Code DSR 1010 DSR 1024 DSR 0111 DSR 0114 DSR 9999 14.2 Code DSR 1010 DSR 1024 DSR 0111 DSR 0114 DSR 9999 14.3 Code DSR 1010 DSR 1024 DSR 0111 DSR 0114 DSR 9999 14.4 14.0 WOOD REPAIR WORKS Reinforcing timber beams with steel plates of size 100 x300x12 mm with bolts and nuts Description Unit Quantity Rate in Rs Amount in Rs Details of cost of each steel plate MATERIAL Mild Steel Plates Quintal 0.03 4,700.00 159.39 Galvanised steel bolts & nuts Each 8.00 12.00 96.00 LABOUR Carpenter I st class Days 0.10 297.00 29.70 Beldar Days 0.20 297.00 59.40 Sundries & Scaffolding LS 12.00 1.70 20.40 Total 364.89 Add water charges 1% 3.65 Total 368.54 Add CPOH @ 15% 55.28 Cost of Each plate 423.82 Reinforcing timber beams with flitch plates that is sandwiched between two timber members o increase the strenght of beams Description Unit Quantity Rate in Rs Amount in Rs Details of cost of 1m MATERIAL Mild Steel Plates Quintal 0.11 4,700.00 531.29 Galvanised steel bolts & nuts Each 25.00 12.00 300.00 LABOUR Carpenter I st class Days 0.50 297.00 148.50 Beldar Days 0.50 297.00 148.50 Sundries & Scaffolding LS 24.00 1.70 40.80 Total 1,169.09 Add water charges 1% 11.69 Total 1,180.78 Add CPOH @ 15% 177.12 Cost of 1m 1,357.90 Reinforcement of existing wooden beams with L shape Angles 70x70x6 at the bottom of the beam Description Unit Quantity Rate Amount Details of cost of 1m MATERIAL L angle structural steel Quintal 0.08 4,700.00 355.32 Galvanised steel bolts & nuts Each 25.00 12.00 300.00 LABOUR Carpenter I st class Days 0.50 297.00 148.50 Beldar Days 0.50 297.00 148.50 Sundries & Scaffolding LS 24.00 1.70 40.80 Total 993.12 Add water charges 1% 9.93 Total 1,003.05 Add CPOH @ 15% 150.46 Cost of 1m 1,153.51 Consolidation of woodwork with sawdust and polyster resin of low viscosity, wherein the work needs to completed in similar application and then smoothen and finished as per the Engineer incharge. Code DSR 2402 DSR 9999 M Rate DSR 0111 DSR 0114 DSR 9999 Description Details of cost of 3 Sqm MATERIAL Epoxy resin Saw dust LABOUR Conservator Carpenter Class I Beldar Sundries & Scaffolding Total Add Tools and Planks 1% Total Add CPOH @ 15% Cost of 3 Sqm Unit Cost of 1 Sqm Quantity Rate Amount Kg LS 4.00 93.00 150.00 1.70 600.00 158.10 Days Days Days LS 0.75 0.50 2.00 24.00 1,650.00 393.00 297.00 1.70 1,237.50 196.50 594.00 40.80 2,826.90 28.27 2,855.17 428.28 3,283.44 1,094.48 References 1. Building Construction, Sushil Kumar 2. Practical Handbook on Building Construction, NABHI Publication. 3. What are Lime Mortars, GurmeetS.Rai, ParomitaDesarkar, INTACH Publication 4. Why use Lime? Sangeeta Bias, INTACH Publication 5. Conservation Manual, Sir.John Marshall, Published by Calcutta Superintendent Government Printing India, 1923 6. Delhi schedule of Rates 1972, CPWD Publication 7. Delhi schedule of Rates 1985, CPWD Publication 8. Delhi schedule of Rates 2013, CPWD Publication 9. Basic Schedule of Rates 2011, Department of Archaeology and Museums, Rajasthan – Jaipur 10. IS 2118-1980 Construction of Jack Arch Type of Built-Up Floor or Roof 11. IS 2250-1981 Preparation and Use of Masonry Mortars 12. IS 2394-1984 Application of Lime Plaster Finish 13. IS 3036 -1992 Laying Lime concrete for a Waterproofed Roof Finish 14. IS 3620-1979 Specification for Laterite stone Block for Masonry 15. IS 13935-2009 Seismic Evaluation, Repair and Strengthening of Masonry Building 16. Estimation of INTACH’s Projects 17. Schedule of Rates Mohanani ASI Engineer Annexure I Cintec Anchor Rate List S.No. Item Providing and placing of anchors in cored holes of predefined lengths, diameters & locations obtained as output from analysis of the simulated model of the bridge using existing material properties and geometrical conditions Coring should be done by use of high speed low vibratory coring machine with diamond core bits. It should impart minimal or no vibration to the structure being strengthened. The coring motor & bit should be capable to core at least upto 3m in straight line. Each patented anchor will comprise of three components(Except Cintec RAC anchor which does not contain any separate grout delivery pipe) detailed as below: (a) Reinforcing Member:- Stainless steel Rebar/studd/tube of Grade 304 conforming to BS 6323/6744/6105 & ASTM A554/A312 as per applicability. The diameter and size of the reinforcing members will based upon the structural requirement of structure. (b) Presstec Grout:- The Presstec grout is a one component dry powder mix. Its basic ingredient includes natural mineral and portland product with graded aggregates, including sand and lime. The constituents, when proportioned with water, produce a pumpable, non-shrinking grout. The grout does not contain any epoxy & resin binders. Presstec grout is a proprietary, pure mineral grout, conforming to German DIN standards. (i) DIN 1045 (ii) DIN 18200 (iii) DIN 18555 (iv) DIN 18557 (c) Sock:- This should be a specially woven polyester based tubular sock with expansion properties to suit the diameter of the bore hole in the substrate. The sock should have property to expand in lateral direction only. The mesh of the sock is to be designed to contain the aggregates of mixed grout while still allowing the milk of grout to flow from its pores. Qty. Unit Rate (Rs/Unit) (d) Grout Delivery Pipe:- A 10-12mm dia. PVC hollow pipe for delivery of grout under pressure inside the sock & around the reinforcing rebar/stud such that the grout inflates the sock all arond the rebar/stud starting from far inside end, moving outward towards the front & forming mechanical bond between rebar/stud & substrate. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Cintec RAC Anchor of 10mm diameter hollow stainless steel tube in cored hole of 32mm diameter and upto maximum length of 1000mm. Cintec Anchor of 10mm diamter Rebar/studd in cored hole of 32mm diameter. Cintec Anchor of 10mm diamter Rebar/studd in cored hole between 32mm and 40mm diameter. Cintec Anchor of 10mm diamter Rebar/studd in cored hole between 40mm and 50mm diameter Cintec Anchor of 10mm diamter Rebar/studd in cored hole between 50mm and 55mm diameter Cintec Anchor of 12mm diamter Rebar/studd in cored hole of 32mm Cintec Anchor of 12mm diamter Rebar/studd in cored hole between 32mm and 40mm diameter Cintec Anchor of 12mm diamter Rebar/studd in cored hole between 40mm and 50mm diameter Cintec Anchor of 12mm diamter Rebar/studd in cored hole between 50mm and 55mm diameter Cintec Anchor of 12mm diamter Rebar/studd in cored hole between 55mm and 60mm diameter Cintec Anchor of 12mm diamter Rebar/studd in cored hole between 60mm and 65mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole of 40mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 40mm and 50mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 50mm and 55mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 55mm and 60mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 60mm and 65mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 65mm and 70mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 70mm and 75mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 75mm and 80mm diameter 1 meter 18720 1 meter 42720 1 meter 44460 1 meter 46200 1 meter 47940 1 meter 49680 1 meter 51420 1 meter 53160 1 meter 54900 1 meter 56640 1 meter 58380 1 meter 58500 1 meter 60240 1 meter 61980 1 meter 63720 1 meter 65460 1 meter 67200 1 meter 68940 1 meter 70680 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 80mm and 85mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 85mm and 90mm diameter Cintec Anchor of 20mm diamter Rebar/studd in cored hole between 90mm and 100mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole of 50mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 50mm and 55mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 55mm and 60mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 60mm and 65mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 65mm and 70mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 70mm and 75mm diameter Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 75mm and 80mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 80mm and 85mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 85mm and 90mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 90mm and 100mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 100mm and 120mm diameter. Cintec Anchor of 25mm diamter Rebar/studd in cored hole between 120mm and 150mm diameter. Cintec Anchor of 32mm diamter Rebar/studd in cored hole of 65mm diameter. Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 65mm and 70mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 70mm and 75mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 75mm and 80mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 80mm and 85mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 85mm and 90mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 90mm and 100mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 100mm and 120mm diameter Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 120mm and 150mm diameter 1 meter 72420 1 meter 74160 1 meter 75900 1 meter 76200 1 meter 77940 1 meter 79680 1 meter 81420 1 meter 83160 1 meter 84900 1 meter 86640 1 meter 88380 1 meter 90120 1 meter 91860 1 meter 94320 1 meter 97320 1 meter 96000 1 meter 97740 1 meter 99480 1 meter 101220 1 meter 102960 1 meter 104700 1 meter 106440 1 meter 108900 1 meter 111900 44 Cintec Anchor of 32mm diamter Rebar/studd in cored hole between 150mm and 300mm diameter 1 meter 117900 Final length & dia of anchor for strengthening of a distress, is characterstic to distress in the structure hence, the same will be decided on case to case basis. The above is inclusive of the cost of manufacturing the tailor made anchors as per structural requirements, packing of material and freight from UK to India, custom duty and all other applicable taxes, etc. Anchor prices are chargeable in intervals of 0.5meter. Hence if anchor length of specific dimensions is say 6.30 meters, the anchor rate will be calculated for 6.5meters. NOTE: 1 The above rates are inclusive of all applicable taxes as per prevailing Government regulations. 2 Facilities which are required to be provided free of cost for execution of the work within 50m of work area are as below: (a) Godown at site for storage of material. Min. space required is 200sqft & maximum space may vary based of quantity of anchor material requrired for the project. (b) Power supply for all site work including but not limiting to lighting, coring & anchor intallation. ( c) Water as required to carry out the work. (d) Accomodation for atleast 10 persons. 3 The above rates are valid for a period of 1 year from the date of this schedule. 4 Base exchange rate considered at 100INR = 1 GBP. Incase of fluctuation beyond 5%, the differential rate as applicable, increase or decrease will be applicable upon 66% of the above quoted cost. 5 It may be kindly be noted that the aforesaid job will be executed through our authorised applicators only. 6 We will also like to add that since our technology is tailor made, in some cases certain additional investigative analysis may be required for which charges will be as per actuals.
© Copyright 2026 Paperzz