Annex No. 2 CONTRACT FOR LEASE OF THE GAS FACILITY NZ xx/2010/RCx concluded pursuant to Article 663 etc. of Act No. 40/1964 (Digest) Civil Code between the following Contracting Parties : The Lessor : (Trade name) Company name Registered Office: Represented by: IČOcode: DIČ code: IČ VAT code: Bank: Account No.: ABO: IBAN: SWIFT ( BIC): Registered in the Commercial Register at ......................... District Court, Section:................, file No.: .................. (hereinafter referred to as „Lessor" ) and The Lessee: SPP - distribúcia, a.s. Registered office: Mlynské nivy 44/b 825 11 Bratislava Represented by: ........................................ IČO code: 35 910 739 DIČ code: 20 21 931 109 IČ VAT code: SK7020000372 Bank /EUR/ : VÚB a.s. Account No.: 1119353 / 0200 IBAN: SK74 0200 0000 0000 0111 9353 SWIFT (BIC): SUBASKBX Bank /EUR/ : Account No.: IBAN: SWIFT (BIC): Tatra banka, a.s. 2627712668 / 1100 SK64 1100 0000 0026 2771 2668 TATRSKBX Registered in the Commercial Register at Bratislava I District Court, Section: Sa, file No.: 3481/B (hereinafter referred to as „Lessee“) Annex No. 2 I. Object and Purpose of Lease I.1. The Lessor is the owner of the gas facility specified in Article I. 2 of this Contract. The Lessor has acquired the ownership rights to the given gas facility by its construction, providing proof of that fact in the form of the Building Authority’s decision permitting the use of the construction: „Name of the construction according to the final inspection decision“, No.: , dated:……….. . (Alternatively) The Lessor has acquired ownership rights to the given gas facility by transfer of these rights from the previous owner, providing proof of that fact by the Purchase Contract (Contract for Donation) No.: .............., dated ............., concluded between (Lessor) and (Previous owner). The Lessor declares that the gas facility specified in Article I. 2 of this Contract was built in compliance with the project documentation (title and number), elaborated by (name and registered office of the designer / design office) approved by the Lessee, and in accordance with the conditions shown in the Building Authority’s decision (No. of the building permit), dated ………... . I.2. The Lessor relinquishes for use to the Lessee the following gas facility: For example: Object C 108 STL gas pipeline - Gas trunk line Sl PE DN 90 mm length 104.00 m - Gas connection PE DN 32 mm length 9.50 m - Gas pressure regulator 1 unit The gas facility is located below the ground surface, buried on lots in the cadastral area: (e.g. Mlynárce, city: Nitra, street: Tokajská 8,10,12. ) I.3. The gas facility specified in Article I. 2 of this Contract is accepted by the Lessee in lease for the purpose of its use in the distribution of natural gas to offtake points connected to the aforesaid gas facility. II. Rights and Obligations of the Contracting Parties II.1. Rights and Obligations of the Lessee II.1.1. The Lessee has the right of usage of the gas facility specified in v Article I. 2 of this Contract. II.1.2. The Lessee is obliged to perform, at his own cost, activities related to the gas facility specified in Article I, Point 2 of this part of the Contract that are unavoidable toward the assurance of safe operation of the gas facility. In particular, the Lessee shall execute the following activities: a) Maintenance and monitoring of the overall technical conditions of the gas facility (patrolling, gas network route checks, leakage checks), b) Professional inspections and professional tests of the gas facility, Annex No. 2 c) Removal of defects of the gas facility without the need for replacement of the line part of the gas pipeline. II.1.3. In the scope of maintenance, the Lessee has the right to carry out interventions in the gas facility as necessary to repair defects and restore the distribution of natural gas. Interventions in the gas facility outside of routine maintenance, as well as changes of the gas facility may be carried out only with prior consent of the Lessor, or in the case specified in Article II, Point II. 2.2. II.1.4. The Lessee is obliged to notify the Lessor, without undue delay, the need of repairs of the gas facility that must be carried out by the Lessor (i.e. in excess of the scope of activities specified in Article II.1.2 of this Contract). II.1.5. The Lessee has the right to execute technical improvements of the leased gas facility only with prior consent of the Lessor. The Lessor and the Lessee have agreed that the costs for technical improvement of the leased gas facility paid by the Lessee shall be depreciated by the Lessee. The Lessor undertakes to refrain from increasing, in the lease time duration, the entry price of the leased property by the price of technical improvement. At the same time the Contracting Parties agreed that, should the lease relationship expire before lapse of the depreciation period of the technical improvement, then the Lessor shall be obliged to pay to the Lessee the sum equaling to the depreciated tax cost of the technical improvement, calculated to the date of expiry of the lease relationship II.1.6. The Lessee is obliged to familiarize, by request, the Lessor with the conditions of the leased gas facility. II.1.7. The Lessee is not authorized to sublease the leased gas facility without prior consent of the Lessor. II.2. Rights and Obligations of the Lessor II.2.1. The Lessor is obliged to relinquish the leased gas facility to the Lessee in conditions suitable for its agreed use. II.2.2. The Lessor shall perform repairs of the gas facility or ensure their performance (further referred to as "repairs"), except for cases defined in Article II.2.1 of the Contract, wherein such repairs must be performed by the Lessee (i.e. the removal of defects of the gas facility without the need for replacement of the line part of the gas pipeline). Unless agreed otherwise between the Lessee and the Lessor in writing, the Lessor shall perform repairs of the gas facility within maximally 3 days from the date of notification of the need. Failure of the Lessor to perform repairs within this deadline shall establish the Lessee’s right to perform these repairs, and the Lessor shall be obliged to refund to the Lessee the costs extended by the Lessee in the repairs of the gas facility II.2.3. The Lessor is obliged to ensure undisturbed use of the gas facility by the Lessee, and to provide him with the necessary cooperation /permit excavations, allow land entry, etc./. Annex No. 2 II.2.4. The Lessor is obliged to ensure the possibility of entry of the Lessee and persons authorized by the Lessee to the land and premises locating the gas facility, including entry with the necessary transport means. II.2.5. At conclusion of this Contract the Lessor submitted to the Lessee documentation, in accordance with the list thereof, which represents an inseparable part of this Contract as its Annex No. 1. /Select the LIST OF DOCUMENTS (A,B,D,) from Annex No.1, depending on the gas facility type that is the object of lease /. III. The Rent III.1. The rent was determined in compliance with Act No. 18/1996 Coll. on prices, as amended by later regulations, and by agreement of both Contracting Parties, in the sum ……………. EUR (in words, ……………..Euros) annually. VAT shall be added to the price thus determined in compliance with applicable legal regulations. Unless the Lessor and Lessee agreed in writing differently, the sum of the rent may not be changed during the validity period of this Contract. III.2. The rent is payable 1 x annually in arrears, always for the preceding calendar year. When the lease relationship is established or expires in the course of the calendar year, the Lessor is entitled to the proportional part of the rent in the amount of 1/12 for each calendar month or part thereof. III.3. The Lessee shall pay the agreed rent on the basis of the Lessor´s invoice. The Lessor shall issue the invoice by the 15th day at latest of the calendar year following the year of the rent. III.4. The Banking charges of the Lessee shall be borne by the Lessee, banking charges of the Lessor shall be borne by the Lessor. III.5. All financial obligations shall be payable in the Euro currency. III.6. Both Contracting Parties exclude assignment of their receivables without prior written agreement. IV. Billing and Payment Conditions IV.1. Each invoice shall contain the following, additionally to the particulars specified by applicable legal regulations: - The designation “invoice”; - IČO codes of both Contracting Parties; - Number of the Contract/Buyer’s order; - Mailing date of the invoice; - Maturity date of the invoice; - Constant symbol; - Form of payment – transfer order; - Sum to be paid; Annex No. 2 - Name, signature and telephone contact of the issuer’s responsible employee; - Imprint of seal of the issuer; - Place of performance of the Contract, - Banking data of both Contracting Parties in the form ABO, IBAN and SWIFT. IV.2 The banking data of the Lessor in the form ABO, IBAN and SWIFT shown in the invoice must be identical to the banking data agreed in the Contract, or else the Lessee shall be entitled to pay the invoiced sum according to the banking data shown in the invoice and shall not, in such case, be responsible for incidental loss occurring to the Lessor in consequence of the incorrectly addressed payment. IV.3. Failure of the invoice to meet all particulars agreed in the Contract shall entitle the Lessee to return the invoice to the Lessor without payment. In such case the Lessor shall not have the right to claim sanctions against the Lessee for late performance of his undertaking but must issue a new invoice with data corresponding to the provisions of the Contract, and specifying a new maturity period. IV.4. Each invoice shall be issued and delivered to the Lessor´s registered office’s address. IV.5. The agreed maturity deadline of invoices, debit notes and credit notes is 60 days from the delivery date of the invoice to the other Contracting Party. Should the last day of maturity period fall, according to the Slovak calendar, on a Saturday, Sunday or a public holiday, then the Contracting Parties shall accept the first following workday as the day of discharge of financial obligation, under the same price conditions and payment terms. IV.6. The day of debiting the Buyer’s account with the debt and crediting the Seller’s account therewith shall be deemed the day of. fulfilment of the financial undertaking. IV.7 Should the Lessee be in default with the performance of his financial obligation, the Lessor shall be entitled to claim default interest from the Lessee, in the sum 0.02 % of the debt for each day of the delay. V. Conditions of Use of the Facility V.1. The Lessee has the right to connect further customers to the leased facility during the lease relationship. V.2. The Lessor consent to the Lessee´s entry of his land where the facility is placed in order to check and maintain the facility.. V.3. The Lessor declares that he has established easements entitling him to have the given gas facilities placed in the lots of placement. The Lessor undertakes that, in case of sale of the gas facility to the Lessee to the effective date of the Contract for Purchase, transfers the rights derived from the existing contracts for the creation of easements to the Lessee at no charge, or to ensure that the owners of land lots where the gas facility is located conclude, at no charge, contracts with the Lessee for the creation of easements, resulting in the Lessee´s entitlement to have the gas facility placed and operated in the given land lots, and to enter these land lots for purposes of maintenance, repair and reconstruction of the gas facility. Annex No. 2 VI. Final Provisions VI.1. This Contract is concluded for an undefined period of time. VI.2. The Contracting Parties have agreed that each Contracting Party may terminate this Contract only for reasons representing violation of the agreed obligations derived from this Contract. The termination must be made in writing and must be delivered to the other Contacting Party. The period of notice is 12 months, commencing from the first day of the calendar month following after delivery of the termination notice to the other Contracting Party. VI.3. The Contracting Parties declare that they are aware of the fact that in the event of expiry of their contractual relationship the Lessee’s right of use of the given facility shall cease, along with the Lessee’s possibilities to distribute natural gas to the offtake points connected to that facility. VI.4. The Lessee undertakes that, in the case of alienation of the gas facility specified in Article I of this Contract, the Lessee shall have the right to buy the facility at the purchase price shown in Point VI.5 of this Contract. This undertaking of the Lessor shall remain in effect during the entire lease period. Should the Lessee opt to utilize his right to buy the facility, the Lessor shall be obliged to conclude with the Lessee a purchase contract, in wording as shown in Annex No. 2, within maximally 30 days from the delivery date of the Lessee´s offer. VI.5. The Lessor undertakes to conclude in the future with the Lessee, under the conditions specified in this Contract, a Purchase Contract, whose object shall be the sale of the gas facility specified in Article I of this Contract at the purchase price determined as the difference between the agreed price in the sum................... Euro (in words, .................... Euros) without VAT, and the sum of rent paid by the Lessee until the day of conclusion of the Purchase Contract. The Contracting Parties have agreed that the Lessor´s undertaking to conclude a Purchase Contract with the Lessee, worded as shown in Annex No. 2 to this Contract, shall remain in force during 5 years from the conclusion of this Contract. The Lessor shall be obliged to conclude the Purchase Contract with the Lessee within 30 days at latest from the delivery day of the Lessee´s conclusion notice. The notice to conclude the Purchase Contract must be made out in writing and must be delivered to the Lessor. VI.6. The Contracting Parties have agreed that in the case of conclusion of the Contract for Purchase according to the preceding provisions of this Article the Lessor shall warrant to the Lessee for the quality of gas facility, and that the warranty period shall be determined by deducting the duration of the Lessee’s use, based on the Contract for Lease, of the gas facility from the period of 60 months. VI.7. All rights and duties not expressly regulated in this Contract shall be governed by the applicable provisions of the Civil Code and by provisions of other generally binding legal regulations. The Contracting Parties agreed that this Contract and relations resulting of it will be governed and interpreted in compliance with laws of the Slovak Republic. All disputes arising out of this Contract shall be finally settled by relevant courts of the Slovak Republic. Annex No. 2 VI.8. If some of the provisions of this Contract are entirely or only partially invalid or unenforceable, or it will become invalid or unenforceable later, it does not affect the validity of other provisions of this Contract. The Contracting Parties commit to replace such provisions immediately by a provision, which will preserve the sense of the original provision and will correspond to the original will of the Contracting Parties and purpose of this Contract. VI.9. The Contracting Parties declare that they have read this Contract, understood its contents, and that they have concluded it voluntarily, in witness whereof they have added their signatures. VI.10. The Contracting Parties consider the contents of this Contract matter of confidentiality and covenant to refrain from enabling third-party access to information contained in this Contract. VI.11. This Contract was made out in six copies, of which the Lessor shall obtain two copies and the Lessee four copies. VI.12. This Contract becomes valid by its signature by both Contracting Parties, and effective on the date ............. . alternatively This Contract becomes valid and effective by its signature by both Contracting Parties. VI.12. This Contract may be amended and supplemented only in the form of written supplements, signed by representatives of both Contracting Parties. VI.13. The List of documents applying to the gas facility representing Annex No. 1 to this Contract, and the Contract for Purchase representing Annex No. 2 to this Contract are indelible components of this Contract. ............................, on the ............................. ...........................,on the ........................... The Lessor: The Lessee: .......................................... ........................................ Annex No. 2 Annex No. 2 Annex No. 1 LIST OF DOCUMENTS Technical documentation for STL and NTL gas pipelines (steel + PE) a) Documents preconditioning approval - Pipeline acceptance record with documents for steel gas lines and connections according to STN 38 6413, Annex D, and for gas lines and connections made from PE according to STN 38 6415, Annex C, containing minimally the following documents: - Building permit, - Confirmed final project documentation, with drawn-in changes, - Initial inspection report of gas pipeline and connection, - Pressure test report, - Geodesic layout of the as-built construction project in a digital format, - Written consent of owners of affected buried facilities and of owners/administrators of railways, factory sidings, roads and water flows to the execution method of parallel runs and crossovers, - Final inspection certificate, - Official test protocol (MPSVR SR decree No. 718/2002), - Records of the latest applicable professional inspection and professional test. b) Other documents - Acceptance documents and records applying to steel gas pipelines according to STN 38 6413, Annex D, and to PE gas pipelines according to STN 38 6415, Annex C, not listed under Point a).
© Copyright 2026 Paperzz