Support to eliminate the impact from mines and ERW in Yemen- phase IV 00085825 Periodic Progress Report: July – September 2014 Implementing Agency: Country/Region or Area: Project Title and ID: Project Duration: Reporting Period: Contact Person/s: Funded by: United Nations Development Programme Yemen Support to eliminate the impact from mines and ERW in Yemenphase IV - 00085825 01/03/2013 to 28/02/2017 July to September 2014 Aleen Hamza, programme Officer, [email protected] Government of Yemen, United Nations Development programme, Government of Japan, Government of USA (US – DoS), United Nations Office for Humanitarian Coordination Assistance (CERF and ERF) 1 Progress Review UNDP Country Programme Document outcome 26 : Local authorities and communities effectively engaged in sustainable management of natural resources, biodiversity conservation, and adaptation to climate change and disaster risk reduction (DRR) by 2015. UNDP Strategic Plan outcome 6: Early Recovery and Rapid return to sustainable development pathways are achieved in post-conflict and post-disaster settings UNDP Strategic Plan Output 6.2: National and local authorities / instiutions enabled to lead the community engagement, planning, coordination, delivery and monitoring of recovery efforts Project/Programme Outcome : Support to eliminate the impact from mines and ERW in Yemen Indicator : CPD outcome indicator : % of mine polluted areas cleared (both legagy areas and newly contaminated area) Strategic Plan Output Indicator 6.1.1: Extent to which authorities supported by UNDP have institutional arrangements, plans, physical and human resources in place within eighteen months to lead the design and implementation of early recovery efforts to ensure safer return to sustainable development. Strategic Plan Output Indicator 6.1.2: Extent to which a financing or aid management mechanism is accountably and effectively used for early recovery within six to eighteen months Baseline : Target: Current Status : Year :2011 Status : Legacy mined cleared by impact up to 2011 High: 90.7% Medium: 99.8% Low: 82.5% Year :2013 Status : average 1.3 (see annex 3 for details) Year :2015 value: 100% Mines clearance of legacy areas identified in 2000 LIS To be updated in December 2014 Year :2017 value: average 2.3 To be updated in December 2014 Year :2013 Status : average 2 (see annex 3 for details) Year :2017 value: average 2.3 To be updated in December 2014 2 Output 1 Enhanced national capacity in planning, management and monitoring of mine action activities (ongoing during the project’s all four years period). Timeframe (in the AWP) Planned activities in the AWP Q1 Q2 Q3 Q4 Level of implement ation Progress and results achieved 100% Such national mine action strategy has been developed within NMAC/YEMAC Request for the extension of Article 5 of the Ottawa APMBC. Yemen was granted five years extension (till 01 March 2020) during this treaty June 2014 inter-sessional meeting held in Maputo, Zimbabwe 60% Reviews and updates are being performed under the leadership of a UNDP mine action specialist where the review and update of 6 out of 22 chapters have almost been accomplished 70% Essential training of one YEMAC IMSMA specialist (YEMAC IMSMA Department Director) has been accomplished as well as the transitional upgrade to IMSMA version 5.3, which is now operational by YEMAC IMSMA staff. Monthly ‘Map Supply’ on demining field operations effected. 100% Two modern map plotters were purchased for this purpose. Map supply service by YEMAC IMSMA department has been available since early 2014 when and requested especially by the UN entities in Yemen Refresher trainings continued as appropriate 75% The UK through the Defence Attaché at the Embassy in Sana’a offered the training of one YEMAC staff as a trainer of trainers of UXO/IED planned to be organized in 2014 pending completion of English language qualification. The nominated staff is still having English language training in Sana'a in preparation for this specialized training course. This will assist in partially filling the current shortage in UXO/IED TOTs National Mine Action Strategy (2013 – 2017) approved and disseminated. x x Update of national SOPs completed X x IMSMA Upgrade to latest version Strategy discussed with GICHD. x x X Re-registration of all YEMAC staff by a special committee established in December 2013 was completed in early January 2014 Preparations are underway in organizing the training of a YEMAC team on UXO/IED by a specialized 3 overseas company A one month comprehensive refresher training workshop was conducted at the MDDU centre in collaboration with the USA Marshal Institute. A trainer from the American Marshal Institute conducted the training during the period 23 August – 24 September 2014. The following attended this training: MDD group 3 staff; 3 MDD trainers; 2 MDD field supervisors; 4 MDD handlers Plan on equipment replacement implemented 0 Most of the 2014 procurement plan was deferred to next year due mainly to the non– availability of funds. Some procurement items have to be provided this year such MDD food and medicines costing about US$ 50,000 and that should e imported from Germany Regional and international workshop seminars and conferences attended by appropriate staff 75% The YEMAC Director attended a Regional Senior Managers’ Course in ERW and Mine Action, in Dushanbe, Tajikistan, during the period 12 – 30 May 2014 organized by the James Madison University and the Centre for International Stabilization and Recovery and partially funded by the US Depar4tment of State. The Deputy Director of YEMAC QA department attended a regional workshop on QA Management held in Arabic in Beirut during the period 05 – 09 May 2014 and sponsored by GICHD. The YEMAC Project Officer attended a training workshop on Contracting in Mine Action held in Geneva during the period 05-09 May 2014 and sponsored by GICHD. Staff and admin costs met X X Monthly advocacy and fact sheet approved and production started X X X X X X 75% YEMAC staff entitlements and Head Office, branches and units costs are being smoothly paid as planned. 75% A fact sheet is being regularly reviewed and updated as required and bulletin is being periodically prepared and disseminated by UNOCHA in collaboration with YEMAC Financial utilization for the output Annual budget : Expenditures: Percentage of utilization : 70% Outputs Key results a. Enter information about the main results achieved at the output level : explain how the results achieved at the activity level are contributing to the achievement of the output. b. Specify the evidence you have to support the results achieved (how do you know that you have achieve the results mentioned above). 4 Output 2 Conducted safe, effective and efficient mine and ERW clearance operations (ongoing during the project’s all four years period). Timeframe (in the AWP) Planned activities in the AWP Q1 Q2 Non -technical survey in Sana’a, Abyan, Amran, Haijah and Saada conducted where situation allows Q3 Q4 Level of implement ation 70 % x Progress and results achieved A 20 days non – technical survey plan scheduled to start in late June 2014 was slightly amended and shifted to July 2014. It was conducted in 3 districts in Sa’dah governorate (As Safra, Sa’dah city, Sehar) and in 2 districts in Sana’a ( Arhab, Bani Al Harth) identifying new suspected hazardous areas of about 14.6 million m2 in Sa’dah and of about 2.9 million m2 in Sana’a. Another non – technical survey was conducted during September 2014 in 4 districts in Abyan governorate (Ahwar, Al Wadhee’a, Lowdar and Moodiyah) resulting in new suspected hazardous areas of about 8.6 million m2. Technical survey of approximately 39.3 million sq meters mainly in newly hazardous areas in Sana’a, Abyan, Saada, Amran and Hajjah 9% During the reporting period 275,000 m2 were technically surveyed, 215,494 m2 of which were marked as mine fields. These survey and marking activities were conducted in the districts of Khanfar and Zinjbar in Abyan governorate and the district of Bani Al Hareth in Sana’a. Month January 2014 x 37 % x Total suspected 237,520 240,000 February 2014 179,592 940,408 1,120,000 May 2014 74,402 25,598 100,000 June 2014 486,560 1,332,240 1,818,800 August 2014 134.494 45.506 180.000 81.000 14.000 95.000 958,528 2,595.272 3,553,800 Total x Released 2,480 September 2014 Mines/ERW clearance of approximately 2.281 million aqure meters Marked 837,476 m2 of mine fields were cleared from the threat of landmine/ERW and freed for the use of civilians. Details are as follows: 5 Clearance by month and unit, team and group Month Clearan ce Units January 2014 65,560 14,110 37,764 115,990 233,424 February 2014 45,683 5,447 38,611 115,775 205,516 6,730 - - - 6,730 May 2014 17,220 1,050 6,504 1,600 24,520 June 2014 33,081 9,735 34,210 244,800 321,826 September 2014 17,360 4,000 4,100 20,000 45,460 185,634 34,342 119,335 498,165 837,476 March 2014 Total Survey Groups Dogs Groups UXO Groups Total 397devices were discovered and destroyed during the period: Device Type Anti-personnel Anti-tanks UXOs Total Quality Assurance (QA), Quality Control (QC) and Handover of Cleared Mine Fields: Number 8 5 384 397 Quality Assurance (QA) and Quality Control (QC) and hand over of Cleared Mine Fields Jan – Sep 2014: Quarter 1, 2014 In the 1st quarter 2014 the QA teams inspected the survey and clearance teams that were working in 4 mine fields/areas in Zinjbar and Khanfar districts, Abyan governorate in January 2014. In February 2014, they continued work in Abyan, then moved to Thula in Amran governorate and withdrew in early March 2014 due to lack of funding. 6 Quarter 2, 2014 In 2nd quarter 2014, they worked during the quarter in Al Dhale’ and Ibb governorates. A 3 rd group worked in Taiz governorate. QA was completed in 7 cleared mine fields in these governorates with an area of 64,781 m2 while it is still in progress in 3 other cleared mine fields with an area of 118,845 m 2 . The reporting period also witnessed the handover of 5 quality– assured cleared mine fields to the local authorities in Al Waziyah district, Taiz governorate, in a public ceremony specially held for this purpose. An MRE team also participated in this event. Quarter 3, 2014 During the 3rd quarter 2014, the QA and QC teams conducted the following activities during the 3 rd quarter 2014: Mine awareness in quality assured areas implemented Handover of 3 cleared mine fields with a total area of 6,153 m2 to the local authorities in Al Hasha district, Al Dhale’a governorate. Post clearance MRE was also conducted during the handover by the YEMAC post clearance MRE team. Quality control of 5 mine fields as follows: A 87,764 m2 mine field in Al Shuaib district, Al Dhale’a governorate A 2,731 m2 mile field in Qa’atabah district, Al Dhale’a governorate 2 mine fields with areas of 3,200 m2 and 4,080 m2 in Zinjbar district, Abyan governorate A 6,000 m2 mine field in Khanfar district, Abyan governorate Quality assurance of 2 mine fields in Hosn Shaddad and Al Maraqed, Zinjbar district, Abyan governorate This is part of the above QA, QC and hand over activity Financial ization for the output Annual budget : Expenditures: Percentage of utilization : Outputs Key results a. Enter information about the main results achieved at the output level: explain how the results achieved at the activity level are contributing to the achievement of the output. b. Specify the evidence you have to support the results achieved (how do you know that you have achieve the results mentioned above). 7 8 Output 3 Enhanced Capacity of Mine Detection Dog (MDD) Centre (ongoing during the project’s all four years period). Timeframe (in the AWP) Planned activities in the AWP Q1 Breed 12 new MDDs Q2 Q3 Q4 Level of implement ation 0% Progress and results achieved The MDD centre started, on 01 July 2014, the training of 8 new puppies on balls. One died, another one was not interested while the remaining 6 are under the training programme. Deliver 8 new MDs for field operations There are 8 puppies under training and planned to be handed over for field mines/ERW detection in late December 2014 or early January 2015. Clearance of 741000sq meters (already included in 2 above) Mine detection dogs group 3 conducted mine clearance in Bani Al Hareth district, Sana’a during the reporting period clearing 4,100 m2 as indicated above. Financial utilization for the output Annual budget : Expenditures: Percentage of utilization : Outputs Key results a. Enter information about the main results achieved at the output level : explain how the results achieved at the activity level are contributing to the achievement of the output. b. Specify the evidence you have to support the results achieved (how do you know that you have achieve the results mentioned above). 9 Output 4 Supported Mine Risk Education (ongoing during the project’s all four years period). Timeframe (in the AWP) Planned activities in the AWP Q1 Q2 Q3 Q4 Level of implement ation 64% 497000 individuals benefiting from MRE campaigns in 9 governorates (mainly UNICEF funded) Progress and results achieved 317,889 of the local population in affected areas benefitted from the MRE activities implemented during the reporting period in partnership with, and co-funding of UNICEF as follows: Month X X X Men Woman Total Villages Jan. 7,431 4,563 11,994 88 Feb. 49,536 65,277 114,813 329 Mar 23,461 16,331 39,792 261 Apr 31,546 18,544 50,090 247 May 30,482 21,095 51,577 333 Jun 16,808 5,871 22,679 289 Aug 2,124 1,124 3,248 56 Sept 13,359 10,337 23,696 93 174,747 143,142 Total 317,889 1,696 Annual budget : Financial utilization for the output Expenditures: Percentage of utilization : Outputs Key results a. Enter information about the main results achieved at the output level : explain how the results achieved at the activity level are contributing to the achievement of the output. b. Specify the evidence you have to support the results achieved (how do you know that you have achieve the results mentioned above). 10 Output 5 Landmine/ERW Survivors supported (Mines action victims) (ongoing during the project’s all four years period. Timeframe (in the AWP) Planned activities in the AWP Q1 Q2 Q3 Q4 Level of implement ation 98 % Survey and medically examine 759 survivors in 9 governorates Progress and results achieved Victims’ medical survey Medical survey during the reporting period was conducted in the 3 governorates of Al –Dhale’a, Lahej and Abyan benefitting 438 landmines/ERW victims: Month March 2014 May 2014 August 2014 Governora te No. of Districts Al-Dhale’a 3 Lahej Abyan Total x x No. of Villages Male Children Male Adults Female Children Female Adults Total 14 18 120 6 10 154 3 21 10 242 10 18 280 2 1 1 2 0 1 4 8 36 29 364 16 29 438 x Victims’ medical examination Medical examination during the reporting period benefitted 308 landmines/ERW victims in the 2 governorates of Al –Dhale’a and Abyan : Month Governora te No. of Districts March 2014 Al-Dhale’a 3 August 2014 Abyan Sep 2014 Abyan Total No. of Villages Male Children Male Adults Female Children Female Adults Total 14 8 81 5 8 102 2 13 12 88 1 4 105 2 16 12 83 1 5 101 7 43 32 252 7 17 308 11 136% Medically support 831 survivors in 9 governorates Victims’ medical support 1,134 medical support items were provided to 488 landmines/ERW victims in 4 governorates during the reporting period: Med. Support Type x x Abyan Abyan Total Jun 2014 Aug 2014 Sep 2014 8 12 17 14 8 59 Eye glasses 23 42 35 25 22 147 Wheeling chairs 20 29 8 13 4 74 Artificial limbs 11 17 18 11 6 63 Surgery/eye surgery 12 17 12 17 12 70 Physical therapy 15 23 23 27 30 118 Medical investigation 45 102 100 65 101 413 Medical shoes 16 20 18 24 24 102 Medical belts 5 2 7 1 1 16 20 14 8 12 18 72 175 278 246 209 226 1,134 No. of victims 70 102 110 105 101 488 No. of districts 3 3 3 3 2 13 No. communities 8 14 21 13 16 72 Total x Lahej Apr 2014 Crutches Support rehabilitation and reintegration in local societies benefiting about 150 survivors through YALS survivors vocational training and micro income generating projects in 8 governorates including Abyan, Hajjah and Sa’dah Al – Dhae’a Feb 2014 Hearing aids x Hajjah 100% x A 50,000 grant was provided to YALS during the 2nd quarter 2014. The vocational training conducted and income generating micro projects implemented covered an average from 130 to 150 direct and indirect landmines/ERW victims in 10 governorates including Abyan, Hajjah and Sa’dah 12 Financial utilization for the output Annual budget : Expenditures: Percentage of utilization : Outputs Key results a. Enter information about the main results achieved at the output level : explain how the results achieved at the activity level are contributing to the achievement of the output. b. Specify the evidence you have to support the results achieved (how do you know that you have achieve the results mentioned above). 13 Project Risk and Issue Log # A Description and Date Identified Description : Type Operational l Political security environment in operational areas or difficulty in gaining safe access Probability and Impact Reduced rate of survey and clearance operations Countermeasures / Management response Risks Survey and clearance resources shifted to increase land release rates in ‘safer’ areas. Owner Submitted, updated by Last Update Status Project Manager x) Project Manager Oct 2014 increasing, Project Manager x) Project Manager Oct 2014 No change Project Manager Project Manager Oct 2014 No change Probability: 5 Impact on results: 4 Date Identified : March 2013 B Description : Financial and Organizational Difficulty in timely provision of funds Date Identified : Dec 2013 D Description : Unsafe political and security situation including abduction of vehicles and field staff Date Identified : March 2013 Reduced rate of survey and clearance operations Enhancement of joint efforts Probability: 4 Impact on results: 4 Request for Change Problem Other Probability (very likely=5, Likely=4, Moderate=3, unlikely=2, very unlikely=1) Impact on results (critical=5, severe=4, moderate=3, minor=2, negligible=1) ) Issues Political and security volatile situation in a number of contaminated governorates renders some of these governorates inaccessible or un-safe for field mine action operations Priority:2 14 Financial Summary Date: 30 September 2014 (Based on Project Transaction Details) Project Output Budget Total expenses Commitments Balance % utilization Enhanced national capacity in planning, management and monitoring of mine action activities (ongoing during the project’s all four years period). Conducted safe, effective and efficient mine and ERW clearance operations (ongoing during the project’s all four years period). Enhanced Capacity of Mine Detection Dog (MDD) Centre (ongoing during the project’s all four years period). 560,899.95 501,355.99 15,865.52 43,678.44 92.2 Supported Mine Risk Education (ongoing during the project’s all four years period). Landmine/ERW Survivors supported (Mines action victims) (ongoing during the project’s all four years period. Total 3,093,483.10 1,168,226.48 46,000.00 Budget allocated Within output 2 above according to PRODOC - 160,911.64 15,000.00 7,350 (7,350) 717,827.24 619,426.59 98,400.65 86.3 1,838,074.07 58 % 4,372,210.29 2,457,270.70 76,865.52 1,703,344.98 49.9 15 Financial Utilization by Donor (Based on Project Transaction Details) JAPAN Project Output Expenditure Output 1: Output 2: Output 3: Output 4: Output 5: 72,001.74 134,726.47 21.516.90 1,000.00 40,141.94 269,387.05 Project Output Expenditure Output 1: Output 2: Output 3: Output 4: Output 5: Total 244,959.62 578,700.18 52,152.55 0.00 76,340.52 952,152.87 Project Output Expenditure Output 1: Output 2: Output 3: Output 4: Output 5: 167,594.81 454,759.43 87,237.78 6,350 11,759.28 727,701.30 Project Output Expenditure Output 1: Output 2: Output 3: Output 4: Output 5: 0.00 0.00 0.00 0.00 491,179.79 491,179.79 Project Output Expenditure Output 1: Output 2: Output 3: Output 4: Output 5: 16,799.82 40.40 44.81 0.00 49.87 16,934.90 Total US - DOS OCHA / CERF Total OCHA / ERF Total UNDP Total 16 Annexes: Annex 1: Monitoring Plan for the Following Quarter Activity Monitoring field visit to a clearance company at field work Monitoring field visit to a UXO group at field work Monitoring field visit to a VA team at field work Monitoring field visit to a technical survey group at field work Verification visit to YEMAC head office Verification visit to YEMAC branch in Aden Responsible UNDP/YEMAC UNDP/YEMAC UNDP/YEMAC UNDP/YEMAC Deadline 2nd half of Nov 2014 2nd half of Nov 2014 1st half of Dec 2014 1st half of Nov 2014 UNDP UNDP/YEMAC 2nd half of Nov 2014 2nd half of Nov 2014 17 Annex 2 – SP output indicators details Baseline Year Baseline Source Baseline Milesto ne 2014 Target 2017 Comments 6.2.1. Extent to which authorities supported by UNDP have institutional arrangements, plans, physical and human resources in place within eighteen months to lead the design and implementation of early recovery efforts to ensure safer return to sustainable development. 6.2.1. A.1.1 Extent to which authorities supported by UNDP have buildings & facilities in place 1 6.2.1. A.2.1 Extent to which authorities supported by UNDP have equipment & vehicles in place 6.2.1. A.3.1 Extent to which authorities supported by UNDP have human resources in place 6.2.1. A.4.1 Extent to which authorities supported by UNDP has the leadership 6.2.1. A.5.1 6.2.1. A.6.1 function and mandate for recovery assigned to lead recovery efforts Extent to which authorities supported by UNDP have recovery plans formulated and resourced Extent to which authorities supported by UNDP have institutional arrangements in place 2013 YEMAC annual report 1 2 YEMAC office Sanaa is ok. Training center in Aden requires repair following explosion. 1 2013 YEMAC annual report 1 2 some vehicules and equipment have been destroyed durign the crisis 2 2013 YEMAC annual report 2 2 insitutions same size than before the crisis 1 2013 YEMAC annual report 2 3 mandate existing. Leadership currently undergoing training. 1 2013 YEMAC annual report 1 2 strategicv plan requires revision 2013 YEMAC annual report 2 3 institutions already in place before the crisis 2 Rating scale: 1 = Less than pre-crisis: 2=Back to pre-crisis: 3=Better than pre-crisis 18 Baseline Year Baseline Source Baseline Milesto ne 2014 Target 2017 Comments 6.2.2. Extent to which a financing or aid management mechanism is accountably and effectively used for early recovery within six to eighteen months 6.2.2. A.1.1 The centre of government has accountability mechanisms to holds institutions responsible to deliver their plans and finances 2 2013 6.2.2. A.1.2 The population is able to hold the relevant institutions responsible to deliver their plans through mechanisms such as open meetings, public accountability forums 2 2 6.2.2. A.2.1 YEMAC annual report 2 3 lack in the accountability system. 2013 2 2 clearance of field could be based on public demand. 2013 2 2 NMAC coordinates activities but there are wicknesses in prioritorization. Aid management system is owned and coordinated by the national government, and aligned with national systems and processes The accountability and effectiveness are measured in the following dimensions on a 3-step scale. At the country level, UNDP Country Offices will identify and assess all the financing or aid management mechanisms that are established ranging from CERF, Flash Appeals, CAPs, CHF, MDTF, Pooled Funds to PBF, and other early recovery/development funding mechanisms that are used to fund (early) recovery coordination/ programmes. Standards for data measurement (data components) Accountability: The center of government holds the different institutions responsible to deliver their plans and finances, such as auditing mechanisms Accountability: The population are able to hold the relevant institutions responsible to deliver their plans through mechanisms such as open meetings, public accountability forums Effectiveness: Aid management system is owned and coordinated by the national government, and aligned with national systems and processes 1. Not adequately 2. Partially 3. Largely No mechanisms or Mechanisms in place, but not implemented Mechanisms in place, but partially implemented Mechanisms in place, and largely implemented The public has little capacity/means to hold the relevant institutions be responsible to deliver the results The public has limited capacity/means to hold the relevant institutions be responsible to deliver the results The public can largely hold the relevant institutions be responsible to deliver the results Main drive usually comes from the development partners, and government usually plays a passive role More proactive engagement of government takes more proactive engagement and set up foundations of improved aid forecasting, accounting and aid management systems. Government increasingly taking the lead in policy design and implementation, and cooperation between the government and development partners 19 Annex 3 – Government of Japan contribution Implementation Details Total Period of Grant: 12 months (01/03/2014 – 28/02/2015) Objective of the grant: The principal objective of this grant is to provide humanitarian and development assistance during the grant period through support to eliminate danger from mines and explosive remnants of war in Yemen. The associated activities of this grant are: To fund clearance and survey activities in the impacted areas to return land to productive use, in the Abyan Governorate, through: o o o o o o Survey of areas suspected to be contaminated with landmines/ERW and release of land not found to be contaminated with landmines/ERW. Marking of areas found to contain landmines/ERW. Clearance of residential areas of landmines/ERW. Clearance of agricultural land and land for livelihoods activities. Clearance of spot explosive ordnance disposal (EOD) tasks identified by the affected population. Refresher training of key national staff that will support Abyan’s landmines/ERW clearance operations. 20 o Update of the information management system and SOPs to ensure that the clearance and surveys activities undertaken in Abyan meet international standards and practices. As indicated in this progress report, total expenditure from this grant as of 30 September 2014, was $ 269,387.05. This low delivery was due to its late receipt (in late May 2014), the unsafe access of some of the targeted contaminated areas in Abyan during the reporting period as well as the unavailability of funds at the project level. However, the contribution played a very important role in the implementation of the project’s 2 nd and 3rd quarter work plans. In addition to contributing in covering the related running costs of the YEMAC head office and branches and the YEMAC national capacity enhancement, main field achievements include: Non – technical survey was conducted during September 2014 in 3 districts in Abyan governorate (Ahwar, Al Wadhee’a, Lowdar ) resulting in new suspected hazardous areas of about 8.6 million m2. Clearance of 33,120 m2 in Khanfar and Zinjbar districts Quality control of two mine fields with areas of 3,200 m2 and 4,080 m2 in Zinjbar district and one 6,000 m2 mine field in Khanfar district. Quality assurance of two mine fields in Hosn Shaddad and Al Maraqed in Zinjbar district. Japan is an important and very old partner in mine action in Yemen. This new contribution has filled a considerable funding gap in the project’s current year budget and will of course play an important role in the implementation of YEMAC’s mine action objectives and activities in the specified landmines/ERW affected areas, enabling the Government of Yemen to continue progress towards fulfilling its obligations under the mine ban treaty within the deadline of 01 March 2020. UNDP and the Government of the Republic of Yemen, represented by NMAC / YEMAC, wish to express gratitude to the Government of Japan for such a generous contribution to the Yemen Mine Action Support Programme, hoping that it will consider allocating it on annual basis, as of year 2015, taking into account the recent approval to extend Yemen’s obligations under Ottawa mine ban conversion till 01 March 2020 and the possible proliferation of the threats of landmines/ERW to new governorates and areas such as Al – Baidha, as a consequence of the very recent events in the country. 21 Annex 4 Republic of Yemen The Cabinet of Ministers National Mine Action Committee Date: 05/09/2014 Ref: 3000/ 22 Work Plan of YEMAC for 4th Quarter (October - December) 2014 Approved by: Ali Mohammed Al - Kadri Director of YEMAC 23 1. 2. Amran Hajjah District Amran - Harf Sufian Mastaba- Kushar- Al-Shahel Area (M2) Implementing Team To be identified through the survey Team No. 1 To be identified through the survey Team No. 2 1 Dec Governorate Nov No Oct Non-Technical Survey: 30 Estimated Budget Funding Source 20,000 ERF RDP Adv 20,000 1 30 30,000 CERF 30,000 50,000 Total 50,000 Technical Survey : Target Area (M2) Gover norate 1. Sa’dah District Release& Marking 200,000 Clearance 2,000 Group No 1 1 30 20,000 CERF NIM 20,000 24 2. 3. 4. 5. 200,000 Group No 2 1 30 18,000 Japan 18,000 2,000 Group No 3 1 30 20,000 CERF 20,000 200,000 2,000 Group No 4 1 30 20,000 CERF 20,000 200,000 4,000 Group No 5 1 30 18,000 CERF 18,000 Abyan Ja’ar + Zinjbar Sa’dah Al-Dhaher 200,000 Sa’dah Haidan Sana'a Bani Jarmooz Total 1,000,000 4,000 14,000 96,000 96,000 Clearance Teams Target Area (M2) Implementing Team Governorate District 1. Sa’dah Al-Dhaher 30,000 Company 1 1 30 40,000 CERF 40,000 2. Sa’dah Haidan 30,000 Company 2 1 30 40,000 CERF 40,000 3. Sana'a Bani Jarmooz 30,000 Company 3 1 30 40,000 CERF 40,000 4. Sana'a Bani Jarmooz 30,000 Company 4 1 30 40,000 CERF 40,000 5. Abyan Ja’ar+Zinjbar 30,000 Company 5 1 30 40,000 Japan 40,000 6. Sana'a Bani Jarmooz 15,000 Platoon 3 1 30 20,000 CERF 20,000 25 7. Hadramout Rakhyah Total 30,000 Company 8 1 30 40,000 195,000 UNDP if possible 260,000 40,000 260,000 MDD Unit Groups 1. Abyan Zinjbar 92,000 2. Abyan Zinjbar 92,000 3. Abyan Zinjbar 92,000 Total 1 30 20,600 Japan 20,600 Group 2 1 30 20,600 Japan 20,600 Group 3 1 30 20,600 Japan 20,600 Group 1 276,000 61,800 61,800 UXO Groups: 1 30 Group 2 1 30 29,200 CERF 29,200 Group 3 1 30 29,200 CERF 29,200 1. Sa’dah Al-Dhaher 40,000 Group 1 2. Sa’dah Razeh 40,000 3. Sa’dah Haidan 40,000 Total 120,000 29,200 87,600 CERF 29,200 87,600 Quality Assurance Teams: 26 1. Al-Dhala Al-Shaeeb 2. Abyan Ja’ar+Zinjbar Team No 1 Team No 2 1 30 12,200 CERF 12,200 1 30 12,200 Japan 12,200 Total 24,400 24,400 Admin. Staff Daily food Allowances: 370 x YER 15,000 x 3 months 1 Total 1 30 77,500 CERF & 77,500 Japan 77,500 77,500 MRE with UNICEF Co-financing: 1 Amran 2 Al-Amanah 3 Hajjah 4 Abyan 5 Hadhramout 27 Victims Assistance 1 2 45,000 CERF 45,000 Sana’a 10 – 12 days 45,000 ERF 45,000 Sadah 10 – 12 days Total 90,000 90,000 Vehicles spare parts, maintenance and Other Maintenance: 1 Toyota 3 x 4,000 1 30 12,000 CERF, Japan 2 Mitsubishi 3 x 1,500 1 30 4,500 CERF, Japan 4,500 3 Tyres 3 x 1,500 1 30 4,500 CERF, Japan 4,500 4 Fuel, oil & service 3 x 10,500 1 30 31,500 CERF, Japan 31,500 5 Other maint 3 x 1,500 1 30 4,500 CERF, Japan 4,500 , 12,000 28 6 Dry batteries 3 x 650 1 30 Total 1,950 CERF, Japan 1,950 12,000 58,950 46,950 YEMAC Head Office & Branches: 1 30 69,000 CERF 69,000 1 30 10,500 CERF, Japan 10,500 3 x 1,000 1 30 3,000 CERF, Japan 3,000 3 x 2,000 1 30 6,000 CERF, Japan 6,000 Head Office 3x 350 1 30 1,050 CERF, Japan 1,050 6 Aden branch 3 x 4,700 1 30 9,000 CERF, Japan 9,000 7 Mukalla branch 3 x 2,500 1 30 7,500 CERF, Japan 7,500 8 Aden training center 3 x 700 1 30 2,100 CERF, Japan 2,100 9 Internet & communications 3 x 1,000 1 30 3,000 CERF, Japan 3,000 10 IT 1 30 3,000 Japan 11 Utilities 1 30 1,500 CERF, Japan 1 Local salaries & allowances 3 x 23,000 2 Rent and building maintenance 3 x 3,500 3 Stationary 4 Medicines 5 3 x 500 3,000 1,500 29 13 Advocay 15 Translation services 16 Maintenance of Aden training center partial costs 17 Miscellaneous expenses 18 MDD food and medicines 19 Photocopier with scanner 1000 1,000 CERF, Japan 3 x 200 600 CERF, Japan 1,000 CERF, Japan 1,000 3,000 CERF, Japan 3,000 50,000 UNDP if possible 3,500 Japan 1 30 3 x 1000 1 Total 30 174,750 1,000 600 50,000 3,500 133,100 41,650 Training, Refresher Training and Workshhops 1. Field visits by YEMAC HQ YEMAC 2-4 days per month 2,000 CERF, Japan 2,000 30 2. Follow up on the field activities of clearance teams, demining companies, and UXO teams 3. Field visits for the purpose of monitoring & inspection - $1,000 x 2 months 4. Collecting the discovered UXOs and destroying them in the work areas 5. Filed visits of MRE teams during and after the mine action operations- $1,200 x 2 months 6. Field visits of Victims' Support Teams 7. YEMAC 1 30 2,000 CERF, Japan 2,000 12 days per month 2,000 CERF, Japan 2,000 4 days x 2 months 2,000 CERF, Japan 2,000 2,400 CERF, Japan YEMAC 12 days per month 2,400 YEMAC 12 days per month 1,000 Following up the field activities of clearance teams, demining companies, and UXO platoons YEMAC HQ - 1 30 2,000 CERF, Japan 2,000 8. Following up the field activities of clearance teams, demining companies, and UXO platoons YEMAC HQ Hadhramaut Branch 1 30 1,000 CERF, Japan 1,000 9. Medical evacuation exercises in the field Training Center 1,000 Japan 1,000 10. A refresher course for all medical support teams Training Center 1,000 Japan 1,000 11. A refresher course for all officers of clearance companies, leaders of survey teams and officers of inspection Training Center 2,000 CERF, Japan 2,000 12. A refresher course for groups' leaders in the companies and platoons. Training Center 1,000 CERF, Japan 1,000 YEMAC HQ - Aden Branch UXOs Team CERF, Japan 1,000 Aden Branch 31 13. A refresher course for deminers in the field in the companies and platoons. Training Center 2,000 14. A refresher course for deminers in MDD unit YEMAC- MDD Unit 1,000 Japan 1,000 15. A general annual challenges/lessons learned workshop for managers of YEMAC's branches and administrations and leaders of field compnies, groups, and teams under the supervision of the Chairman of NMAC YEMAC 12,000 Japan 12,000 16. A refresher course for drivers (Aden branch) Training Center 500 17. A small workshop for the Training Center trainees to discuss the technical problems in the filed Training Center 1,000 18. Review of National Mine Action Standards YEMAC HQ -Aden Branch 19. English courses for the staff of YEMAC HQ and its branches (as needed) 20. A computer course for the staff of YEMAC HQ and its branches (as needed) 21. development of adminstartive and field capacity for the officers in YEMAC HQ and its branches 22. A training course for UXO/IED officers and workers in the field of counter- cluster bombs and IEDs YEMAC 23. Training the CSOs' volunteers about MRE YEMAC YEMAC YEMAC YEMAC 1 30 2,000 CERF, Japan Japan 500 1,000 1,000 CERF, Japan 1,000 1,000 CERF, Japan 1,000 500 CERF, Japan 500 32 24. Supervising the emergency education activities implemented by national and international CSOs in the target governorates and forwarding reports about achieved works to YEMAC and supporters 1 30 YEMAC 30 25. Training MDD puppies MDD Unit 26. Refresher training for handlers of MDD sets and groups in the MDD Unit MDD Unit 27. Testing handlers before every deployment to the field MDD Unit 1 30 28. Daily MDD training in the field MDD Unit 1 30 29. Field supervisors YEMAC 1 30 6,700 30. Training the vets on curing diseases of MDD 31. Mine action regional/international conferences/training workshops Total estimated budget for July - September 2014 500 MDD Unit YEMAC Total 1 1 30 4,000 48,600 1,029,600 CERF, Japan 6,700 Japan 500 Japan 4,00 0 43,600 843,500 33 4,00 0 182,60 0 Breakdown of estimated budget by donor: OCHA/CERF : 607,700 ERF – VA : 65,000 Japan: 266,900 UNDP if possible: 90,000 Total : 1,029,600 Estimated 3rd quarter not yet paid exp : 76,865.52 Toltal: 1,106,465.52 34 35
© Copyright 2025 Paperzz