152 Sturt Street, Southbank, VIC 3006 MOVE IN/OUT IDEMNITY FORM Type of move: In/Out (Circle one) Resident Name: Apartment No: Removalist Company: Removalist Personnel Name/s: Removalist Contact: Removalist vehicle Rego: Requested Move Date: Requested Timeslot: 10am – 12pm/12pm-2pm/2pm-4pm Resident contact: Building Managers Contact – 0452 503 963 E: [email protected] The following conditions apply to all moves: Deliveries/Move-ins and removals/Move-outs may only occur within the timeslots Monday to Friday. Deliveries and removals must not occur outside these times or on public holidays or weekends. The residents must endure that the removalist holds public liability and workers compensation insurance. Deliveries and removals are to be booked with Building Manager at least a week in advance, at which time this form is to be submitted. Residents and/or their contractors who arrive without a prior booking may be refused access. Residents to complete an inspection report (see reverse side of form) and sign and submit to the Building Managers office before contractors can be permitted to commence a delivery or removal. Move-in and Pet Register form (if applicable) must be fully completed and submitted to Building Manager before move can commence, without exception to the Building Manager prior to Move-in. Removal trucks cannot enter the car park due to 2.1 meter clearance. Please also advise the removalist not to park between the car park entry and exit roller doors at any time. The truck may be parked in the loading bay area in the loading bay area of the building at Moore Street entrance. All furniture/boxes or any bulky items to be transported only via Moore Street Entry and through the allocated lift facing towards Moore Street. Strictly no furniture or bulky items to be moved through the front entry lobbies. Stacked items must not block entry or exit pathways at any time. Following the move, all large packing boxes must be taken away by the removalist. Any construction type waste or materials is also the contractor’s responsibility to remove from the building, in the contractors own containers. No rubbish, paper, boxes or bottles can be left in the corridors, fire stairs or on the floors of the garbage chute rooms. All hard waste to be removed by the residents at their own expense. Strictly no dumping of hard waste in any part of the building (including bin area), common area, foyer, car park, rear or front of building. Failure to remove and/or dispose of excess rubbish and packaging may result in cleaning fees being charged to the resident. Building Manager will conduct inspection both prior and following the subject move. Items should not be dragged or pushed across the foyer. The residents or their owners will be held responsible for any damages caused during move-in/move-out either by the contractor or by themselves. Residents will be held liable if their chosen delivery company causes any damage to common area or any part of GUILD and refuse to accept responsibility. The Resident or the Removalist to provide a copy of a Public Liability Insurance before unloading and sign the “Move-in/out Indemnity Form” before delivery can commence. GUILD Management reserves the right to deny entry if either of the party refuse to sign the form. The directions of the Building Manager must be followed at all times. I hereby declare that I understand and agree to the above conditions. Furthermore, I understand that the information I have provided on this form may be stored in hard copy and/or electronic format, accessible to the Building Manager. Resident Name:………………………………………. Signature:………………………………..Date:………………………….. © Luckman Associates Inspection Report (To be completed on the day of the move) Inspection Criteria Pre – Move Yes No Details Yes No Post - Move Details Pet register form completed and submitted to Building Manager? Apartment door and architrave in good condition? Corridor flooring on apartment level in good condition? Corridor walls on apartment level in good condition? Corridor ceiling on apartment level in good condition? Ground and Lower Ground level lobby floor in good condition? Ground and Lower Ground Level lobby walls in good condition? Ground and Lower Ground Level lobby ceiling in good condition? Basement level lift lobby area in good condition? Loading dock and surrounding area in good condition? Lift doors in good condition? Lift interior in good condition? Lift switched to “Exclusive/Normal” mode? Lift Floor carpet mat laid/removed? Lift protective pads erected/removed? Building Manager to Complete Resident to Complete Name: Signature: Date: Name: Signature: Date: Time: I understand that any damages to common property resulting from the move will be ultimately my responsibility, and I will be held fully liable for such damage/s. I also warrant that the removalist(s)/contractor(s) whose service I have engaged to assist with the move hold the appropriate public liability and workers compensation. Time: If any damage caused to common property description of incident and damage caused (write “NA” if not applicable; attach additional sheet if necessary). Name:…………………………………………. Name:……………………………………………. Signature:…………………………………….. Signature:……………………………………….. Date:………………..Time:………………….. Date:………………….Time:…………………… © Luckman Associates
© Copyright 2025 Paperzz