Mission Site Survey Report MOFAQ_PCCW_SITE26 Mauritania, Nouakchott 07th of November Report in confidence This document contains Ooredoo Q.S.C & MOFA Qatar confidential and proprietary information. This document (including any part hereof) is not to be disclosed or transferred outside your organization without the prior written consent of Ooredoo or MOFA-Qatar and may not be copied or reproduced in any form or by any means. 1|Page CLASSIFICATION: CONFIDENTIAL 1. Basic details: 1.1. Overall Info: PCCW SR# MOFAQ_PCCW_SITE26 Nouakchott Project MoFA Qatar MGN Project Customer Name Location & Address OQ Embassy of the State of Qatar, No. NOT 375 BIS, Las Palmas Area, P.O.Box No: 609, Nouakchott - Islamic Republic of Mauritania. 1.2. Customer contact info : Customer Name MoFA Qatar – Nouakchott Contact person Jassim El-Rumihi Contact details 00 222 45 24 27 88 / [email protected] 2|Page CLASSIFICATION: CONFIDENTIAL 2. Site Particulars: 2.1 Site Details/Location Embassy of the State of Qatar, No. NOT 375 BIS, Las Palmas Area, P.O.Box No: 609, Nouakchott - Islamic Republic of Mauritania. 2.2 Site Access & Restrictions 2.2.1 Are there any site restrictions (to bring laptop, camera, phone etc.)? There are no restrictions 2.2.2 Is there any note/observation on this mission? The mission went well 2.3 Building Management / Facility Management Approvals/permissions requirement 2.3.1 Is there Building Management / Facility Management for this mission? There is no building, but the service is managed by Jassim El-Rumihi 2.3.2 Is there any approval required for survey/site installation? No, we do not need specific approval. 2.3.3 Name of Building Management. The service is managed by Jassim El-Rumihi. 2.3.4 Are there any approvals needed to install any equipment, to lay any cables etc – No. 2.4 Cable entry to premises availability 2.4.1 Is there any existing internet connection? They are tow internet connections (ADSL). 2.4.2 What is the name of the Service Provider? Mauritel 2.4.3 Where is this internet connection delivered/terminated? One of the connections is at the office of the diplomatic attaché and the other at the Ambassador. 2.4.4 If the internet connection is not terminated in the server room ( Rack room) then: 2.4.4.1 What is the distance between Telecom room and server room? Until now, There is no telecom room nor server room. The terminations are connected directly to wireless modems. But they showed us a room that they want to transform to “telecom & server” room. 2.4.4.2 Is there a cable laid between telecom room and server room, if yes, what is the type of the cable? (If possible) No cable laid. 2.4.4.3 In case no cable is laid between telecom room and server room, can a new cable be pulled between both rooms? (If possible) Yes. 3|Page CLASSIFICATION: CONFIDENTIAL List of Equipment to be delivered & installed to this Mission (after the site survey): Batch # Batch 1 Country Mauritania City Nouakchott Equipment UPS: SMX2200HV Network Card for UPS: AP9630 UPS External Battery: SMX120BP River Bed: CX570L + SCPS Cisco Router: 1941 Cisco Switch: 2960XR-24PS IPT: 8851 IPT: 8841 IPT: DX650 HD Video Conf: MX300 27U Rack: Ri7 Quantity 1 1 1 Voltage 220 V 220 V 220 V 1 1 1 1 3 1 1 1 220 V 220 V 220 V 220 V 220 V 220 V 220 V 220 V 2.5 IT Room readiness: *Does not necessarily mean it’s a separate room, it’s a space where the IT equipment is stored* 2.5.1 Rack/Equipment Space availability (provide a simple layout of the server room and propose a location for the new rack) 4|Page CLASSIFICATION: CONFIDENTIAL 2.5.2 AC / Ventilation *Please comment* YES/NO if not – is it hot or not (ventilated)? Not yet, but they are committed to install Ventilation. 2.5.3 Power (Socket Type) & ( Picture is needed of the socket) Power Socket are (220 V), se picture for details. 2.5.3.1 Number of wall sockets available? 8 Sockets. 2.5.3.2 Voltage specifications (110V or 220V) 220V 2.5.4 Distance between Wall Power socket and UPS inlet *Please comment- distance between one available socket to the place where rack will be installed – need to capture proper distance as we will order the cables as per this info* 1.5 metre. = 4 ft. 2.5.5 Earthing availability *Please comment- Yes /NO – if yes where is the location (how far from the new rack)* NO. 2.5.6 Internal Cabling: Customer Patch Panel availability and free ports *Please comment- might be issue with access, but check the location of the current rack, location (if allowed take photo from the front/if not please open the rack and check how many free ports are on the patch panel* There is no rack nor Patch Panel. 2.5.7 Distance between Customer Patch Panel and Equipment Rack There is no rack nor Patch Panel. 2.5.8 2.6 Internal Cabling from IT Room (Customer Patch Panel) to LAN outlets – *Please comment - we will install IP phones + video conference (As per table on previous page)– you need to check how many outlets are available and if there is internal cabling from IT room to outlets* There is no cabling installed. IPTs & VC: Verify the IP Telephones and the Tele-presence (VC) locations and its requirements SR # 1 2 Equipment Type 8841 8841 3 7 8841 DX650 Location LAN Availability Power Availability Secretariat Office of Business Manager Office of accounting Diplomatic attaché office No No Yes Yes No No Yes Yes Distance to Power Socket 5|Page CLASSIFICATION: CONFIDENTIAL 3.0 8 8851 9 MX300 Office of the ambassador Meeting and videoconferencing room No Yes No Yes Site Diagram/Solution *Layout / floor plan of the site (electronic - simple sketch of the site and room locations.) 6|Page CLASSIFICATION: CONFIDENTIAL . 7|Page CLASSIFICATION: CONFIDENTIAL 8|Page CLASSIFICATION: CONFIDENTIAL 4.0 Potential Problems / Installation Notes 5.0 The building is not wired so there is the need for installation of a network wiring throughout the building. Internet speed is a bit low, we propose the installation of a satellite antenna Vsat to stabilize and maintain the flow. Existing Equipment Information: *if allowed by Mission, then please capture the below – only IT room equipment: Until now, There is no IT room. # Description / Manufacturer Part Number Serial Number Status 1. 2. 3. 4. 9|Page CLASSIFICATION: CONFIDENTIAL 7.0 Supporting Photos All pictures take to be placed here, with detailed description of each picture. (for the rooms where the IP phones are installed take a photo of proposed phone location and power socket and as many as possible photos of Server Room) Server Room There are some baggage but that will be all removed. 10 | P a g e CLASSIFICATION: CONFIDENTIAL Socket picture Meeting and videoconferencing room There are some baggage but that will be all removed. 11 | P a g e CLASSIFICATION: CONFIDENTIAL Diplomatic attaché office (Jassim Al-Rumihi) 12 | P a g e CLASSIFICATION: CONFIDENTIAL Archiving Office 13 | P a g e CLASSIFICATION: CONFIDENTIAL Office of Business Manager 14 | P a g e CLASSIFICATION: CONFIDENTIAL Office of the ambassador 15 | P a g e CLASSIFICATION: CONFIDENTIAL Secretariat 16 | P a g e CLASSIFICATION: CONFIDENTIAL Office of Accounting The office was closed and they do not have the key. 17 | P a g e CLASSIFICATION: CONFIDENTIAL 8.0 Summary Sheet for missing requirements at mission (to be rectified by MoFA): Note: the locations of each IPT & VC at missions are instructed by the SPOC at each mission. However, the total number of IPTs & VC at each mission is instructed by OQ/MoFA at staging phase. # Missing Requirement Location Description / Action to be taken 1 Another IPT Archiving Office They expressed the need for an additional LIT to archive office 18 | P a g e CLASSIFICATION: CONFIDENTIAL
© Copyright 2026 Paperzz