MEMORIAL PARK PROJECT QUESTIONNAIRE PLEASE DO NOT WRITE ON THE BACK OF THIS SHEET – CONTENT ON THE BACK WILL NOT BE CONSIDERED 1. The west parking lot has been proposed to be replaced with flex space to better accommodate community events such as “Concerts in the Park” and “Sea Festival”. a. Are you aware that a new parkade will be built at Vidal Street and Victoria Avenue to allow more parking stalls for visitors? (Circle One) YES NO b. What other activities, events would you like to see this flex space utilized for? (Example: chess tables, picnic areas, play structures) ________________________________________________________________________ 2. What current issue in the park would you like to see improved by the new design? (Circle One) a. Congestion on the lower f. Adequate bike parking promenade g. Programmable event space b. Not enough seating h. Barrier at street edge c. No gathering space i. Not enough lawn d. The washrooms j. Other (please specify): e. Accessibility _________________________ 3. Shade has been identified as an element we need to enhance. Would you prefer to see shade offered by: (Circle One) a. Trees b. Man-made structures/canopies c. Combination of both elements 4. Why do you currently visit Memorial Park? (Example: people watch, walk, sunbathe) ______________________________________________________________________________ 5. When do you usually visit Memorial Park? (Circle As Applicable) Season: WINTER SPRING SUMMER FALL Time of Day: MORNING AFTERNOON EVENING Events/Occasions/Other: __________________________________________________________ 6. How do you usually access the park and pier? Why do you choose that route? (Circle One) a. Ramp; because: __________________________________________________________ b. Stairs; because: ___________________________________________________________ c. Lower Promenade; because: ________________________________________________ d. Combination of which: _____________________________________________________ 7. Do you prefer: (Circle One) Option 1: “Rail Siding” Option 2: “Wave Action” 8. Any other comments for the design team: ______________________________________________________________________________ ______________________________________________________________________________ ________________________________________ Save PDF and email to to [email protected] by Sept 21. Further opportunities for feedback will be available at the Memorial Park Open House: Session 2 on September 27.
© Copyright 2025 Paperzz