+ CPass0/CPass1 on LHC12d/c Updated at 11:00 on 06/08 C. Zampolli + LHC12d 8/09/12 C. Zampolli 2 + 3 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12d 244 in logbook, 216 runs at reco, 180 at merging E.g.: run 184645 in logbook, but not in Cpass; 4 are probably too recent Filters used: LHC12c, PHYSICS, Good Run, GRP ok COSMICS: 8 failure expected EMCAL/PHOS/MUON: 28 failure expected No triggers: 2 failure expected (too short run) EE/EV/Expired: 4 memory issue during the merging (under investigation) Others (detectors): 20 Successful: 118 118/(118+20+4) = 83.1% success rate (was >90 on 26/07, detectors failures increased) C. Zampolli 8/09/12 + 4 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12d Failure reason Run Number 184880 Failure reason TPC Gain Threshold (1) Run Number 185460 Also TRD 184882 184885 COSMICS (8) 184886 184889 184910 184914 184918 16 recovered rerunning with looser constraints for validation (run 185460 not retried, since it failed anyway in TRD) C. Zampolli 8/09/12 + 5 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12d Failure reason Run Number 185695 185700 185734 185735 185738 185756 T0 (14) 185757 185764 185765 185768 185775 185776 185778 185784 C. Zampolli Hardware problem, fixed now 8/09/12 + 6 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12d Failure reason EMCAL/MUON/P HOS runs (28) Run Number Failure reason Run Number 184443 185456 184481 185559 184663 185560 184664 185562 184709 185631 184716 185647 184719 184762 EMCAL/MUON/P HOS runs (28) Failure reason EMCAL/MUON/P HOS runs (28) Run Number 186159 185677 185731 184780 185934 185024 185994 185148 185998 185186 186036 185341 186062 186063 C. Zampolli 8/09/12 + 7 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12d Failure reason No triggers (2) Run Number 183915 185190 184190 185133 TRD (6) 185378 185460 Also TPC 185915 185916 184673 EV (4) 186162 186165 186167 C. Zampolli 8/09/12 + 8 Summary table – on 06/08 at ~ 11:00 CPass1 – LHC12d Of the 118 successful runs: 116 at reco 103 at CPass1… …of which 101 successful (ignore the red TPC color)… …1 in EV (186000)… ...1 failed in TRD (184145)… Different statistics for CPass0 and CPass1 480/480 chunks at CPass0 472/480 chunks at CPass1 C. Zampolli 8/09/12 + LHC12c 8/09/12 C. Zampolli 9 + 10 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12c 229 in logbook, 163 runs at reco, 159 at merging E.g.: run 179444 in logbook, but not in Cpass Filters used: LHC12c, PHYSICS, Good Run, GRP ok COSMICS: 20 failure expected EMCAL/PHOS/MUON: 32 failure expected No triggers: 3 failure expected (too short, or not the right trigger configuration) EE/EV/Expired: 0 Others (detectors): 17 Successful: 87 87/(87+17) = 83.7% success rate C. Zampolli 8/09/12 + 11 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12c Failure reason Run Number Failure reason 179941 180988 179943 179944 179946 179948 179950 Run Number 180991 COSMICS (20) 180992 182749 182750 179951 COSMICS (20) 179960 180164 180979 180980 180981 180983 180984 180985 C. Zampolli 8/09/12 + 12 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12c Failure reason EMCAL/MUON/P HOS runs (32) C. Zampolli Run Number Failure reason Run Number 179595 181580 179603 181625 179604 181631 179685 181954 179687 181956 180552 181984 180559 182003 180616 180643 EMCAL/MUON/P HOS runs (32) 182609 182610 180644 182612 181328 182640 181339 182641 181344 182681 181360 182712 181546 182717 181558 182721 8/09/12 + 13 Summary table – on 06/08 at ~ 11:00 CPass0 – LHC12c Failure reason No triggers (3) Failure reason Run Number Failure reason Run Number 180934 180716 181609 180717 182639 182300 Run Number TRD (8) 182325 182509 181617 182508 181618 182513 181619 182724 181620 TPC+TRD (9) 181652 181694 181698 181701 181703 C. Zampolli 8/09/12 + 14 Summary table – on 06/08 at ~ 11:00 CPass1 – LHC12c Of the 87 successful runs: 87 at reco 75 at CPass1… …of which 65 successful in CPass1 (ignore the red TPC color)… …1 running… …3 (179803, 180720, 180562) in EV… …and 7 failed in T0, but are MUON runs – they should have not gone through (different AliRoot, probably some changes in T0) As soon as CPass1 is completed, 1 week of time will be given for manual update. If too little (QM is very close), we’ll increase it. Then, Vpass should start C. Zampolli 8/09/12 + Further comments 8/09/12 C. Zampolli 15 + 16 Interdependencies Under discussion: does EMCAL runs need calibration triggers? (PHOS does not) C. Zampolli 8/09/12 + 17 Further issues Some reconstruction jobs fail with bad_alloc under investigation Grid tests with gdb ongoing not many information retrievable, the jobs ran successfully QA for LHC12d fails due to too big stdout files that cannot be validated Responsible: TRD will be disconnected for further productions Currently modified validation script allows QA to succeed in most (but not all!) of the case Possibility to create a new definition for the kCalibBarrel alias in case the FASTOR is not available (see slide ) C. Zampolli 8/09/12 + 18 FASTOR not available In case FASTOR is not available during pp (PI triggers not there), a new alias file will be used kCalibBarrel will be defined with MB triggers at a 100 Hz rate Already in SL instructions at P2 C. Zampolli 8/09/12 + 19 PPass LHC12a and LHC12b Vpass validated ready for PPass C. Zampolli Under discussion the AliRoot version to use, see https://savannah.cern.ch/task/index.php?32465 A patched Rev-16 was created to fix the TRD QA issue to be used to run Ppass Running, first feedback ok 8/09/12 + 20 Calibration of old data GRP/CTP/Aliases entries to be created, after defining the classes to be used for the reconstruction C. Zampolli Might be needed to apply some downscale 8/09/12
© Copyright 2024 Paperzz