Raised Cycle Lane Raised Cycle Lane Carrington Road Bridge to the Train Station Mt Albert Train Station 9 Public Parking Proposed Over Bridge Existing: 27 Parking Proposed: 27 Parking Existing: 10 Parking Proposed: 10 Parking Ballast Lane 10 Existing: 27 + 1 Mobility Parking Proposed: 14 +1 Mobility Parking +Loading Space Old Post Office Building Parking 5 8 6 1 Parking Parking 10 7 Morning Clearway Bus Signalised Pedestrian Crossing 8 Existing: 9 Parking Proposed: 4 Parking New North Road On-R oad Cycle Bus Lane Afternoon Clearway 2 Stre 4 et P 8 Existing: 21 + 1 Mobility Parking Proposed: 15 + 1 Mobility Parking + Loading Space 8 Public Parking 12 On-R oad Cycle Lane 11 On-Road Cycle Lane Bus Bus On-Road Cycle Lane Mt Albert Road ANZ Bank Key Moves for Mt Albert Town Centre • Creates wider footpath on New North Rd by removing sliplane Key Key Existing Trees • Creates a small plaza for social gathering on the corner of New North and Mt Albert Rd by removing turn left lane Proposed Trees • Increases the width of the footpath on New North Rd by removing Future Trees traffic lane • Widen footpath on Carrington Rd to enhance pedestrian access to Mt 1 Removal of Sliplane and Widening Footpath by 3m 2 Widening Footpath by 2.2m 3 Mobility Parking 4 Widening Footpath by 650mm 5 Shared Space (Access to Carpark and the Over Bridge ) 6 Public toilet to be relocated during future development + rubbish Loading zone (Except During Clearway Restriction Times) Albert Train Station • Improves accessibility to train station through a new over bridge • Improve cycling infrastructure by extending cycle lanes on Carrington and Mt Albert Roads On -Street Parking (Except During Clearway Restriction Times) On-Street Parking • Improves accessibility and safety throughout the town centre • Removes 5 existing trees, to increase footpath width on both sides of Upgrades footpath surface refuse to be removed + wall to be lowered 7 Bus Shelter 8 Advanced Stop Box for Cyclists 9 Extended Cycle Lane on Carrington Road 10 Widening Footpath by 600 mm 11 Removal of Free Turn Left Lane 12 Vehicle Access to Basement Parking New Plaza 13 Bus Advance Signal for Southbound Buses turning into Cycle Lane 14 Opportunity for street trading New North Road. Replace with 10 new trees • Adds street furniture including planter boxes and seating • Existing Parking: 131 g Existing: 27 + 1 Mobility Parking Proposed: 26 + 1 Mobility Parking 3 • arkin New North Road Proposed Parking: 103 Carrington Road Limit Line/ Bus Gate 13 Stre et P arkin g Bus 14 Existing: 7 Parking Proposed: 4 Parking Bus Raised Cycle Lane Raised Cycle Lane Carrington Road Bridge to the Train Station Mt Albert Train Station Existing: 10 Parking Proposed: 10 Parking Ballast Lane Future Stage 9 Future Stages Public Parking Proposed Over Bridge (from 2022) Existing: 27 Parking Proposed: 27 Parking 10 Future Stages Stage 1 Existing: 27 +1 Mobility Parking Proposed: 14 + 1 Mobility Parking +Loading Space Old Post Office Building Parking 5 1 8 6 Morning Clearway Parking Parking 10 7 Bus Signalised Pedestrian Crossing 8 Existing: 9 Parking Proposed: 4 Parking New North Road Bus Afternoon Clearway 2 On-R oad Cyc le La ne 4 8 New North Road Existing: 21 + Mobility Parking Proposed: 15 + 1 Mobility Parking + Loading Space Existing: 27 + 1 Mobility Parking Proposed: 26 + 1 Mobility Parking 3 8 Public Parking 13 On-R aod Cyc le La ne 12 Stre et P arkin g Bus 11 ANZ Bank Stage 3 On-Road Cycle Lane On-Road Cycle Lane Bus Bus Bus Stage 2 Existing: 7 Parking Proposed: 4 Parking Mt Albert Road Future Stage 14 Key Key Proposed Stages Furure Plaza Vision (Future Stages from 2022) Future Plaza Vision (Future Stages from 2022) Ballast Lane 9 Existing Trees Proposed Trees Future Trees 1 Removal of Sliplane and Widening Footpath by 3m 2 Widening Footpath by 2.2m 3 Mobility Parking 4 Widening Footpath by 650mm 5 Shared Space (Access to Carpark and the Over Bridge ) 6 Public toilet to be relocated during future development + rubbish Loading zone (Except During Clearway Restriction Times) On -Street Parking (Except During Clearway Restriction Times) On-Street Parking refuse to be removed + wall to be lowered 7 Bus Shelter 8 Advanced Stop Box for Cyclists 9 Extended Cycle Lane on Carrington Road 10 Widening Footpath by 600 mm 11 Removal of Free Turn Left Lane 12 Vehicle Access to Basement Parking 13 Bus Advance Signal for Southbound Buses turning into 13 Stage 1 for completion in 2016/17 Stage 2 (funding TBC) Stage 3 (funding TBC) Future Stage +51.40 10 Key 6 1- Raised Timber Stage 2- Raised Timber Deck Door 3- Proposed Tree 4- Active Space 5- Food Kiosk 6- Public Toilet 7- Terraced Seating 8- Movable furniture 9- Pedestrian Bridge to Mt Albert Station 10- Ramp (1:15) 11- Access Stair 17 12- Artificial Turf 13- Access to Ballast Lane 14- +xx.xx Proposed Levels 15- Timber Paving 16- Concrete Paving 17- Existing Building 3 11 4 5 7 8 17 4 +50.55 +50.55 12 Door 15 1 3 Opportunity for street trading New Plaza 15 Future Stages (from 2022) 2 15 0 0.5 1 +50.80 +50.40 Carrington Road Cycle Lane 14 Limit Line/ Bus Gate 16 5m New North Road
© Copyright 2026 Paperzz