Key Moves for Mt Albert Town Centre Key Key

Raised Cycle Lane
Raised Cycle Lane
Carrington Road
Bridge to the Train Station
Mt Albert Train Station
9
Public Parking
Proposed Over Bridge
Existing: 27 Parking
Proposed: 27 Parking
Existing: 10 Parking
Proposed: 10 Parking
Ballast Lane
10
Existing: 27 + 1 Mobility Parking
Proposed: 14 +1 Mobility Parking +Loading Space
Old Post Office Building
Parking
5
8
6
1
Parking
Parking
10
7
Morning Clearway
Bus
Signalised
Pedestrian
Crossing
8
Existing: 9 Parking
Proposed: 4 Parking
New North Road
On-R
oad
Cycle
Bus
Lane
Afternoon Clearway
2
Stre
4
et P
8
Existing: 21 + 1 Mobility Parking
Proposed: 15 + 1 Mobility Parking + Loading Space
8
Public Parking
12
On-R
oad
Cycle
Lane
11
On-Road Cycle Lane
Bus
Bus
On-Road Cycle Lane
Mt Albert Road
ANZ Bank
Key Moves for Mt Albert Town Centre
• Creates wider footpath on New North Rd by removing sliplane
Key
Key
Existing Trees
• Creates a small plaza for social gathering on the corner of New North
and Mt Albert Rd by removing turn left lane
Proposed Trees
• Increases the width of the footpath on New North Rd by removing
Future Trees
traffic lane
• Widen footpath on Carrington Rd to enhance pedestrian access to Mt
1
Removal of Sliplane and Widening Footpath by 3m
2
Widening Footpath by 2.2m
3
Mobility Parking
4
Widening Footpath by 650mm
5
Shared Space (Access to Carpark and the Over Bridge )
6
Public toilet to be relocated during future development + rubbish
Loading zone (Except During Clearway Restriction Times)
Albert Train Station
• Improves accessibility to train station through a new over bridge
• Improve cycling infrastructure by extending cycle lanes on Carrington
and Mt Albert Roads
On -Street Parking (Except During Clearway Restriction Times)
On-Street Parking
• Improves accessibility and safety throughout the town centre
• Removes 5 existing trees, to increase footpath width on both sides of
Upgrades footpath surface
refuse to be removed + wall to be lowered
7
Bus Shelter
8
Advanced Stop Box for Cyclists
9
Extended Cycle Lane on Carrington Road
10
Widening Footpath by 600 mm
11
Removal of Free Turn Left Lane
12
Vehicle Access to Basement Parking
New Plaza
13
Bus Advance Signal for Southbound Buses turning into
Cycle Lane
14
Opportunity for street trading
New North Road. Replace with 10 new trees
• Adds street furniture including planter boxes and seating
• Existing Parking: 131
g
Existing: 27 + 1 Mobility Parking
Proposed: 26 + 1 Mobility Parking
3
•
arkin
New
North
Road
Proposed Parking: 103
Carrington Road
Limit Line/ Bus Gate
13
Stre
et P
arkin
g
Bus
14
Existing: 7 Parking
Proposed: 4 Parking
Bus
Raised Cycle Lane
Raised Cycle Lane
Carrington Road
Bridge to the Train Station
Mt Albert Train Station
Existing: 10 Parking
Proposed: 10 Parking
Ballast Lane
Future Stage
9
Future Stages
Public Parking
Proposed Over Bridge
(from 2022)
Existing: 27 Parking
Proposed: 27 Parking
10
Future Stages
Stage 1
Existing: 27 +1 Mobility Parking
Proposed: 14 + 1 Mobility Parking +Loading Space
Old Post Office Building
Parking
5
1
8
6
Morning Clearway
Parking
Parking
10
7
Bus
Signalised
Pedestrian
Crossing
8
Existing: 9 Parking
Proposed: 4 Parking
New North Road
Bus
Afternoon Clearway
2
On-R
oad
Cyc
le La
ne
4
8
New
North
Road
Existing: 21 + Mobility Parking
Proposed: 15 + 1 Mobility Parking + Loading Space
Existing: 27 + 1 Mobility Parking
Proposed: 26 + 1 Mobility Parking
3
8
Public Parking
13
On-R
aod
Cyc
le La
ne
12
Stre
et P
arkin
g
Bus
11
ANZ Bank
Stage 3
On-Road Cycle Lane
On-Road Cycle Lane
Bus
Bus
Bus
Stage 2
Existing: 7 Parking
Proposed: 4 Parking
Mt Albert Road
Future Stage
14
Key
Key
Proposed Stages
Furure Plaza Vision (Future Stages from 2022)
Future Plaza Vision (Future Stages from 2022)
Ballast Lane
9
Existing Trees
Proposed Trees
Future Trees
1
Removal of Sliplane and Widening Footpath by 3m
2
Widening Footpath by 2.2m
3
Mobility Parking
4
Widening Footpath by 650mm
5
Shared Space (Access to Carpark and the Over Bridge )
6
Public toilet to be relocated during future development + rubbish
Loading zone (Except During Clearway Restriction Times)
On -Street Parking (Except During Clearway Restriction Times)
On-Street Parking
refuse to be removed + wall to be lowered
7
Bus Shelter
8
Advanced Stop Box for Cyclists
9
Extended Cycle Lane on Carrington Road
10
Widening Footpath by 600 mm
11
Removal of Free Turn Left Lane
12
Vehicle Access to Basement Parking
13
Bus Advance Signal for Southbound Buses turning into
13
Stage 1 for completion in 2016/17
Stage 2 (funding TBC)
Stage 3 (funding TBC)
Future Stage
+51.40
10
Key
6
1- Raised Timber Stage
2- Raised Timber Deck
Door
3- Proposed Tree
4- Active Space
5- Food Kiosk
6- Public Toilet
7- Terraced Seating
8- Movable furniture
9- Pedestrian Bridge to Mt Albert
Station
10- Ramp (1:15)
11- Access Stair
17
12- Artificial Turf
13- Access to Ballast Lane
14- +xx.xx Proposed Levels
15- Timber Paving
16- Concrete Paving
17- Existing Building
3
11
4
5
7
8
17
4
+50.55
+50.55
12
Door
15
1
3
Opportunity for street trading
New Plaza
15
Future Stages (from 2022)
2
15
0 0.5
1
+50.80
+50.40
Carrington Road
Cycle Lane
14
Limit Line/ Bus Gate
16
5m
New North Road