WATER APPROVAL PROCESS OVERVIEW Connecting with Queensland Urban Utilities Who does this apply to? This Fact Sheet applies to anyone wanting to understand the new Water Approval Process or wanting to make a connection, disconnection or alteration to Queensland Urban Utilities’ water and sewerage networks after 1 July 2014. The new Water Approval Process From 1 July 2014, Queensland Urban Utilities is responsible for receiving, assessing, providing advice and approving applications for the connection, disconnection and alteration to our water and sewerage networks, instead of the Councils within our service territory (called the “Water Approval Process”). This change has resulted from the Water Supply Service Legislation Amendment Act 2014 recently passed by the Queensland Parliament (also called the “Utility Model”). This new arrangement is intended to streamline the approval process for water and sewerage connections. Queensland Urban Utilities will continue to focus on ensuring that the changes to the approval process required by the new legislation are as seamless as possible for our customers. We have prepared a suite of Fact Sheets to explain the process for new applications from 1 July 2014 and also to inform those customers who have development applications already lodged with their local Council about what to do during the transition period. Fact Sheets How to apply We have the following Fact Sheets available for your information: From 1 July 2014 you can apply online for a connection, disconnection or alteration to Queensland Urban Utilities’ water or sewerage networks via our Development Services portal, which can be accessed via www.urbanutilities. com.au/developmentservices and clicking on the CONNECTIONS button. Fact Sheet 1:Terminology under the new Water Approval Process Fact Sheet 2:Transitional arrangements for existing development applications and approvals Fact Sheet 3:How the Water Approval Process and development assessment process work in parallel Fact Sheet 4: End-to-end connection process Fact Sheet 5: How to apply for a connection Fact Sheet 6: Standard Connections Fact Sheet 7: Certification Scheme 7 WATER APPR FAC T SHEET OVAL PROC 7: Certification WATER APPROVA L PROCESS Schem e FACT SHEET 1: Who does this inoloFac SheTerm et apply to? gyt unde WATER APPROVAL PROCESS r the new Water Approval Process This Fact Sheet appli es to: • Connecti on undertakin customers g minor work FACT SHEET •2:Endorsed Consultan s ts, and • Design consu constructi ltants and on minor work contractors for This Fact Sheet applies s. To coincidto anyone wanting to e with the understan Water Approval d introduction of the the new Water Approval Process, Queen Urban Uti Process sland lities has and/or wanting Certi establi shed a to make ficationaSchem e to provid connection, disconnec more flexible e faster and tion or approv compliance design alteration to Queensla al and ndproces ses for ‘minor works Urban From 1 July 2014, Queensland Utilities’ water and works’. sewerage Urban Utilities will receive, networks assess, provide advice and after 1 July 2014. approve applications for the connection, disconnection or The Certi ficati alteration to our water and under which on Scheme is Requests for Standard Connecti Queensland a mechanism ons follow will requir sewerage networks. Urban a simpler Utilitiprocess. You will be able e custom Who does Transitional this apply to? arrangements for existing development applications and approvals What is the Cer tification Scheme? What is a Water Approval? (as illustrated): Standard Connecti es ers to relate choose which connection consultant(s) toons to single residenti liver works that self-de and contra • Single • Audit and al dwellings qualify This Fact Sheet explains what happens ‘minor works’ appoin ctor(s) you dwelling house one-into-two lot residenti certify compl t to designor on an existi (see the next as ng A Water sub-divisions constr and constr lot; or iance of Approval minor works, al to existing development applicati ons is uction works an authority insidefor page works criteria uct the the relevant connecti including given with the certi to atransiti on area, live design, and customer ). works (in subject to make a connecti and mainta and approvals during the on of to certain requirement fied on, in the works • most cases) o lot residenti As set out One-into-tw s. For Standard disconnection or alterati period for a specifi • Certify al subthis service from Councils to Queensland Connecti Fact Sheet toinQueensland (usually 12 compliance ed with a single connecon division 4: End-to-end ons, Queensland Urban Utilities’ water Utilitimonth tion proces with theUrban dwelling house with Urban Utilities. mainte conditions es s) in accord s, the Waterwill undertake the connecti nance require on/off for this catego ance on each or sewerage networks. on works. stated Approval Approval ments. in your Waterlot. You ry of conne (including include a will need ction Are compliance willthe terms sewerage SEQ Water to arrang There A Water Approvaltoisundert requirement for the and Supply withare certain other wastewater Urbancriteria e for Queen the and required Uti service/netw and custom liti and Sewer ake for es to carry sland Constructi thea Property requirement er ork interchangea age connection Service Connection, Design s thatcompl ble? out the audit andNetwork on Code). must iance be met engage an works Connecti offor and livea works. connection to qualify Endorson or Staged Water provid Urban The term ‘wastewater ed Consu You will Queensland as aUti Connecti Standard e certi on for liti ltant need service’ es multi fi may also cation -stage to is engage Connection (see Fact to developments (see services under all ofSheet interchangea thedefi audit any Queen the design ble Consu 6: , nitions with ‘sewerage ltant fromservice’, an Endors or sland below). ed Connecti Standard constructi Urban Uti the mainte Certi ons). nance on and lities’which is the termwebsit generally e to: used by list published on our A Water Approval is fication Scheme. infrastructur aspects of the new contained within a Queensland Utilities. This Fact Sheet applies to anyone who Fact Sheet does not apply if:urban • A pre-lodgement meeting has been e. decision notice • Certi provided toThis result Queen Non-compliance fy engine the customer may has an existing development or heldering withdesign Council or preliminary followingapproval sland Urban the assessment action agains s of• aAn Utilities taking connecti operati ononal works application or application lodged prior to 1on. JulyThe 2014 approval granted but no related applicati t the develo decision notice Endorsed per and/or applicati on for compliance assessment contains Consultant. with one of Queensland Urban Utiliti es’ development application has been conditi the ons that the customer must for a comply Material Change of Use has been participating Councils, which includes the lodged. In this case, you will need to with in order to make a connecti lodged on. with Council. In this case, your Brisbane, Ipswich, Lockyer Valley, Scenic apply to Queensland Urban Utilities This commonly includes a requirement application will conti nue to be managed Rim and Somerset local government areas. for a Water Approval in relation to the for the A Standard customer to Connecti undertake the by Council and there is no need to on is a typewater of and sewerage components of works necessary for connecti on, the connecti For this Fact Sheetdisconnecti to apply, your approach Queensland Urbandisconnecti Utilities. on or alterati on, on to your development (see Fact Sheet 5: our water on or alteration of or sewerage networks. the water development mustorbe in one of the How to apply for a connection). sewerage • A development application has not service. following stages at 1 July 2014: There are two types been lodged with Council. In this case, of developmen From 1tsJuly to 2014, you will need to apply which Connections apply you will need to applyStandard to Queensland • Development application lodged with directly to Queensland Urban Utilities for Urban Utilities for a Water Approval Council and not decided connection, disconnection or alteration to in relation to the water and sewerage the Queensland Urban Utilities water and • Development application approved components of your development, sewerage networks. but lodgement of operational works including the connection, disconnection application pending, or or alteration to the Queensland Urban Utilities’ networks (see Fact Sheet 5: • Development approval which requires How to apply for a connection). works to be certified under Brisbane City Council’s Minor Sewer and Water Scheme (DA) process. Who does this Fact Sheet apply to? What is a Standard Connection? Further information Further information, including a full suite of Fact Sheets, can be found on our website: www.urbanutilities. com.au/development-services. You can also phone 07 3432 2200 if you would like to speak to our developer customer service team. Who is Queensland Urban Utilities? Queensland Urban Utilities owns, operates and maintains a network of approximately 18,000kms of water and sewerage pipes with around 528,000 connections to deliver water and take away sewage from properties. We are the statutory authority delivering drinking water, recycled water and sewerage services to the Brisbane, Ipswich, Lockyer Valley, Scenic Rim and Somerset local government areas. Like us on Facebook Queensland Urban Utilities Follow us on Twitter @UrbanUtilities Visit our website www.urbanutilities.com.au ESS If you require assistance with lodging an online application, please contact Queensland Urban Utilities on 07 3432 2200 to speak with a member of our developer customer service team. Queensland Urban Utilities is the largest water distributorretailer authority in the South East Queensland region covering a service territory of 14,300km2. Connecting with Queensland Urban Utilities Queensland Urban Utilities is responsible for planning and delivering safe, reliable and secure water to more than 1.3 million residents and businesses. Our role includes providing drinking water and safely removing and treating sewage. Queensland Urban Utilities is planning for our future by making sure we continue to provide water and sewerage services when and where you need them. Our business is focused on enriching quality of life for our customers and the communities we serve. Q00663-2014 © Queensland Urban Utilities 2014
© Copyright 2026 Paperzz