ME 59700 Fall 2014 Introduction to Systems Engineering Session 17 Dr. Dan C. Surber, ESEP © Copyright 2013 Lecture Topics • • • • Risk Management Concepts Techniques Tools & Utility Carry over to later phases Risk Management Concepts • Risk: “uncertainty that can cause us to fail.” – 2 components • LIKELIHOOD (Probability factor, Pf) • SEVERITY (Consequence factor, Cf) – Both are expressed in PER CENT, so they are LESS THAN ONE – their PRODUCT is the Risk Factor • Mitigation: “set of steps to reduce Pf and Cf” • Contingency: “what to do if MITIGATION fails” • BOTH take resources and MIT needs to be on the SCHEDULE with start and stop dates Risk Management Concepts • Probability factor (Pf) – How likely is it that the cause of uncertainty will be actually occur. • Consequence factor (Cf) – What is the severity of the outcome when it happens. Opportunity Concepts • Opportunity: benefit that has feasibility. – 2 components • LIKELIHOOD (Feasibility) • CONSEQUENCE (Benefit) – Both are expressed as numbers greater than 1, and their PRODUCT is the Opportunity Factor • PURSUIT: a plan to take advantage of the OPP and gain the benefit, but it costs some resources to PURSUE Opportunity Concepts • Benefit (Bf) – What is the benefit accrued to the program if the opportunity is realized. – What will it COST to pursue and capture this. • Feasibility factor (Ff) – How likely is it that this opportunity can be achieved. Risk Handling Methods • • • • • Accept it Transfer it Manage it through mitigation Monitor it Don’t bring it into the active database but save for possible future use RM Techniques & Tools • • • • Spreadsheet in MS EXCEL Database in MS ACCESS SEI: http://www.sei.cmu.edu/risk/index.html ARM, by Strategic Thought (SQL or Oracle) http://www.strategicthought.com/riskmanagement/risksolutons/ • Prophet, a tool made by Hughes/Raytheon • Risk Radar http://www.iceincusa.com/16CSP/content/software/tools/r_radar/risk_rad.htm • Other sources: – http://www.asce.org/files/pdf/seminars/fixWYRICK.pdf Utility of RM Tools • Spreadsheet or Database – Concept Phase • Early identification (“If this happens, then the consequence to the project/design is x, y & z.”) • Best opportunity to “Design it out” – Later Product Development Phases • Technology on the CRITICAL PATH, but not the point of the project • Management reserve must be used carefully • Risks change with product life cycle phase • Develop a RISK MANAGEMENT PLAN at the start of the project – Stakeholders & risk review board – Document how you will rate & rank Risks & Opportunities Summary • Everyone on the team is a key to finding risks and opportunities • Identification is worthless without prioritization & action • Ignoring OPPORTUNITIES is leaving money on the table & business at the mall • Plan to mitigate, and have a CONTINGENCY in case that fails Tools & Utility • http://www.sei.cmu.edu/risk/ • MS Access such as RISK RADARTM • (ISO/IEC Guide 73) • http://www.theirm.org/publications/documents/Risk_Management_Standard _030820.pdf • http://www.risk-opportunity.com/ • http://www.method123.com/risk-register.php • http://www.wikihow.com/Develop-a-Risk-ManagementPlan • http://www.mitre.org/work/sepo/toolkits/risk/ToolsTechniques/RiskR adar.html • Active Risk ManagerTM HAZARDS System Safety vs Project Risk See SLIDES 17a.ppt
© Copyright 2026 Paperzz