Post-Disaster Needs Assessment (PDNA) Reports Industry, Trade and Services (ITS) Sector Region 8 Post-Disaster Needs Assessment OUTLINE OF PRESENTATION I. II. III. IV. V. Brief Description of the ITS Sector Damages, Losses and Needs Assessment Recovery and Reconstruction Needs Analysis a. Impact on the ITS Sector b. Identified Reconstruction Needs of the ITS Sector Proposed Strategies and Prioritization Priority Programs, Funding Requirement and the draft schedule of implementation Post-Disaster Needs Assessment SURVEY COVERAGE PROVINCE POPULATION I.T.S. SECTOR FIRMS SURVEYED SAMPLE SIZE (%) NO. OF CITIES /TOWNS COVERED Tacloban 5,106 4,085 130 3% 1 Leyte 6,840 4,737 1,022 8% 40 Eastern Samar 1,142 799 353 44% 9 224 156 138 88% 3 Southern Leyte 1,600 1,120 32 3% 5 Biliran 3,450 2,415 69 3% 6 TOTAL 18,362 13,312 1,744 8% 64 Samar Post-Disaster Needs Assessment BRIEF DESCRIPTION OF THE SECTOR IN THE DISASTER – AFFECTED AREAS Total Firms in Region 8 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 Tacloban Leyte Eastern Samar No. of Firms Samar ITS Sector Southern Leyte Biliran Surveyed Tacloban Leyte Eastern Samar Samar Southern Leyte Biliran Total No. of Firms 5,106 6,840 1,142 224 1,600 3,450 18,362 ITS Sector 4,085 4,737 799 156 1,120 2,415 13,312 Surveyed 130 1,022 353 138 32 69 1,744 Post-Disaster Needs Assessment BRIEF DESCRIPTION OF THE SECTOR in the DISASTER – AFFECTED AREAS 1,200 Number 1,000 800 600 400 200 Tacloban Leyte Eastern Samar No. of Firms Tacloban Leyte Micro Samar Small Eastern Samar Medium 5,106 3523 1123 205 255 130 90 29 5 6 6,840 1,847 4,583 205 205 1,022 276 689 31 26 1,142 1,085 35 11 11 353 318 33 1 1 224 222 2 Biliran Large Samar Actual No, Actual No, Actual No, Population of Firms Population of Firms Population of Firms Population Surveyed Surveyed Surveyed No. of Firm Micro Small Medium Large Southern Leyte Southern Leyte Actual No. of Firms Surveyed 138 137 1 Population 1,600 16 864 32 688 Actual No, of Firms Surveyed 32 12 20 Biliran Population 3,450 1,070 1,414 966 Actual No, of Firms Surveyed 69 21 29 19 Post-Disaster Needs Assessment BRIEF DESCRIPTION OF THE SECTOR in the DISASTER – AFFECTED AREAS 1,200 1,000 800 600 400 200 Tacloban Leyte Eastern Samar No. of Firms Tacloban Leyte Actual No. Population of Firms Surveyed No. of Firms Population Samar Manufacturing Trading Eastern Samar Actual No. of Firms Population Surveyed Southern Leyte Actual No. of Firms Surveyed Servicing Samar Population Southern Leyte Actual No. of Firms Surveyed Population 5,106 130 6,840 1,022 1,142 353 224 138 1,600 153 10 2,326 349 80 13 56 38 592 Trading 2,144 68 1,368 203 914 286 159 82 1,008 Servicing 2,809 52 3,146 470 148 54 9 18 Manufacturing Biliran Actual No. of Firms Surveyed Biliran Population Actual No. of Firms Surveyed 32 3,450 69 32 2,001 40 1,449 29 Post-Disaster Needs Assessment TOTAL DAMAGES: ITS SECTOR 24.038 Billion (100%) 1 Post-Disaster Needs Assessment DAMAGES SIZE OF BUSINESS 16,000.00 14,000.00 12,000.00 10,000.00 8,000.00 6,000.00 4,000.00 2,000.00 0.00 Tacloban City Leyte Eastern Samar Micro Asset Size Micro Small Medium Large Total Tacloban City 13,230.11 4,218.30 766.96 958.70 19,174.07 Leyte 315.14 784.93 34.50 30.00 1,164.58 Total Damage: P24.038 Billion Small Eastern Samar 2,982.88 103.35 37.65 37.65 3,161.53 Samar Medium Southern Leyte Biliran Large Samar 517.10 0.00 0.00 0.00 517.10 Southern Leyte 0.00 0.00 0.00 0.00 0.00 Biliran 6.67 9.00 5.93 0.00 21.60 Total 17,051.90 5,115.58 845.04 1,026.35 24,038.88 Post-Disaster Needs Assessment TOTAL DAMAGES PER PROVINCE 14,000.00 12,000.00 10,000.00 8,000.00 6,000.00 4,000.00 2,000.00 Tacloban City Leyte Eastern Samar Manufacturing Sector Manufacturing Trade Services Total Tacloban City 575.22 8,053.11 10,545.74 19,174.07 Leyte 397.65 231.77 535.16 1,164.58 Total Damage: P24.038 Billion Samar Trade Eastern Samar 211.09 2,553.05 397.39 3,161.53 Southern Leyte Biliran Services Samar 205.76 307.98 3.37 517.10 Southern Leyte - Biliran 12.46 9.14 21.60 Total 1,389.72 11,158.37 11,490.80 24,038.88 Post-Disaster Needs Assessment TOTAL DAMAGES BY SECTOR Manufacturing , 1,389.72 Services , 11,490.80 Trade , 11,158.37 Total Damage: P24.038 Billion Post-Disaster Assessment ITS SECTOR TOTALNeeds LOSSES: TOTAL LOSSES: ITS SECTOR Php58.991 Billion (100%) 1 Post-Disaster Needs Assessment TOTAL LOSSES PER SECTOR Manufacturing, 2,297.79 Servicing, 30,490.52 Total Losses: P58.991 Billion Trading, 26,202.98 Post-Disaster Needs Assessment TOTAL LOSSES PER PROVINCE 14000.00 12000.00 10000.00 Manufacturing 8000.00 Trade 6000.00 Services 4000.00 2000.00 0.00 Tacloban City Sector Manufacturing Trade Services Total Leyte Eastern Samar Tacloban City 1,636.13 Leyte 56.80 Eastern Samar 132.14 22,905.77 29,995.65 54,537.54 643.30 246.95 947.05 1491.10 190.47 1813.71 Total Losses: P58.991 Billion Samar Southern Leyte Samar 337.72 918.08 48.30 1,304.10 Southern Leyte 135.00 231.98 0.00 366.98 Biliran Biliran Total 0.00 2,297.79 12.75 9.15 21.90 26,202.98 30,490.52 58,991.28 Post-Disaster Needs Assessment TOTAL LOSSES BY SIZE OF BUSINESS 60,000.00 50,000.00 40,000.00 30,000.00 20,000.00 10,000.00 0.00 Tacloban City Leyte Eastern Samar Micro Asset Size Micro Small Medium Large Total Tacloban City 37,630.90 11,998.26 2,181.50 2,726.88 54,537.54 Leyte 553.20 266.95 119.30 7.60 947.05 Total Losses: P58.991 Bllion Small Samar Medium Eastern Samar 1,806.47 2.06 1.79 3.39 1,813.71 Southern Leyte Large Samar 1,304.10 0.00 0.00 0.00 1,304.10 Biliran Total Total Southern Leyte 0.69 198.30 8.75 159.24 366.98 Biliran 6.70 9.00 6.20 0.00 21.90 Total 41,302.06 12,474.57 2,317.54 2,897.11 58,991.28 Post-Disaster Needs Assessment TOTAL DAMAGES AND LOSSES Damages 29% Losses 71% Total Damages & Losses: Php 83.030 Billion Post-Disaster Needs Assessment TOTAL DAMAGES AND LOSSES Large Medium Small Micro Large , 3,923.46 Medium , 3,162.58 Small , 17,590.15 Micro , 58,353.96 Total Damages & Losses: Php 83.030 Billion Post-Disaster Needs Assessment TOTAL DAMAGES AND LOSSES Services , 41,981.32 Trade , 37,361.35 45,000.00 40,000.00 35,000.00 InPhpM 30,000.00 25,000.00 20,000.00 15,000.00 Manufacturing , 3,687.51 10,000.00 5,000.00 0.00 Total Damages & Losses: Php 83.030 Billion Post-Disaster Needs Assessment RECOVERY AND RECONSTRUCTION RECOVERY AND RECONSTRUCTION NEEDS NEEDS Php145.762 Billion Post-Disaster Needs Assessment IMPACT OF TYPHOON YOLANDA ON THE ITS SECTOR 1. Temporary closure of 100% of commercial establishments in hardest hit areas. 2. Reduction in LGU’s revenue generation from business permits, licenses and taxes 3. Loss of family income of displaced workers in the ITS Sectors 4. Lower firm level productivity and profitability 5. Lower contribution to GRDP of the Regional Economy 6. More pressure towards women migrant workers resulting to broken families 7. Increase crime index from social problems Post-Disaster Needs Assessment RECONSTRUCTION AND RECOVERY NEEDS OF THE ITS SECTORS Recovery & Reconstuction Needs TOTAL ESTIMATED COST Recovery Urgent Repair of Equipment and Machineries Formula Re-computed Replacement Needs 475,830,379.73 Equipment Replaement Needs =Ie X Damage to Equipment & 1.20 Machineries 570,996,455.67 350,958,947.06 Trade Reconstruction Needs=Tr X Trade 1.22 Asset Damage 429,222,792.25 Procurement of vital supplies Repair of Structures Coefficient Factor 979,465,365.61 1,806,254,692.40 979,465,365.61 Total Recovery Needs 1,979,684,613.54 Post-Disaster Needs Assessment RECONSTRUCTION AND RECOVERY NEEDS OF THE ITS SECTORS Reconstruction Needs Replacement or reconstruction of affected structures Procurement of heavy and light equipment; Procurement of heavy and light machinery; Procurement of tools 10,885,060,771.59 108,725,380,430.75 Trade Reconstruction Needs=Tr X Trade 1.22 Asset Damage Equipment Replaement Needs =Ie X Damage to Equipment & 1.20 Machineries Reconstruction Needs Total R & R 13,312,429,323.65 130,470,456,516.91 143,782,885,840.56 145,762,570,454.09 Post-Disaster Needs Assessment PROPOSED STRATEGIES and PRIORITIZATION CRITERIA PROGRAMS / PROJECTS STATUS (C, O, PL, P) IMPORTA NCE 30% Concessionary Loans for Yolanda affectedMSMEs - Interest Free (Loan Fee e.g at 2% p.a) will be MSME Loan Assistance Programs (e.g. SBC) P O (e.g SB Corp - Enterprise Rehabilitation Financing (750M)& DBP - National Rehabilitation Fund for Calamity-Stricken Areas, Landbank and other banks) 3 0.90 3 0.90 Grant in Kind (e.gSari-sari store) Projects Provision of simple tools and equipments (priority to RuMEPP Clients) P Re-establishment of Pasalubong Center in Tacloban City Airport and Bus / Port Terminals Setting-up / reconstruction of Pasalubong Center in Tacloban City Airport and Bus / Port Terminals O 3 0.90 2 0.60 OTHERS (Sustainab IMPACT CAPACITY ility, Efficiency, Urgency) 15% 15% 40% 3 0.45 2 0.30 2 0.30 3 0.45 2 0.30 2 0.30 2 0.30 3 0.45 3 1.20 SCORE 2.8500 RANK 1 3 1.20 2.7000 3 2.3000 9.33 2.3000 9.33 2 0.80 2 0.80 Post-Disaster Needs Assessment PROPOSED STRATEGIES and PRIORITIZATION CRITERIA PROGRAMS / PROJECTS STATUS (C, IMPORTAN IMPACT O, PL, P) CE 30% Business Assistance Center DTI Fund - 50,000 per center; balance to outsourced P Establishment of Diskwento Product Depot O SME Caravan / Roving Academy Institutionalized compendium of interventions to MSMEs towards exporting of products Diskwento Caravan Provision of Shared Service Facility (SSF) O PL P 15% OTHERS (Sustainabi CAPACITY lity, Efficiency, Urgency) 15% 40% 2 2 2 2 0.60 0.30 0.30 0.80 3 0.90 2 3 0.45 2 2 0.30 2 3 1.20 3 0.60 3 0.90 0.30 2 0.30 0.30 2 0.30 1.20 3 1.20 3 0.90 3 0.45 2 0.30 2 0.80 SCORE 2.0000 RANK 13.5 2 2.8500 2.4000 8 2.7000 4.5 2.4500 6.5 Post-Disaster Needs Assessment PROPOSED STRATEGIES and PRIORITIZATION CRITERIA PROGRAMS / PROJECTS Product Development & Packaging Design for GDH, Furniture and Fashion Accessories from Typhoon Debris Focuse on souvenir items Participation to the Visayas wide Trade Fair for Yolanda Affected MSMEs A Trade Fair for Yolanda Affected MSMEs in Region 6, 7 & 8 Capacity Development for Business Membership Organizations Development of Business Park OTHERS STATUS (Sustainab IMPORTA (C, O, PL, SCORE IMPACT CAPACITY ility, NCE P) Efficiency, Urgency) 30% 15% 15% 40% RANK O P P P 2 0.60 2 0.30 3 0.45 3 1.20 3 3 2 2 0.90 0.45 0.30 0.80 3 0.90 2 0.60 2 0.30 2 0.30 2 0.30 2 0.30 2 0.80 2 0.80 2.5500 5.5 2.4500 6.5 2.3000 9.33 2.0000 13.5 Post-Disaster Needs Assessment PROPOSED STRATEGIES and PRIORITIZATION CRITERIA PROGRAMS / PROJECTS STATUS (C, O, PL, P) IMPORTA NCE 30% Development of the Eastern Visayas Regional Growth Area (EVRGC) and light industrial economic zone Revitalization of industrial economic zone Legend OTHERS (Sustainab IMPACT CAPACITY ility, Efficiency, Urgency) 15% 15% 40% SCORE P 3 0.90 Rating Scale C - Completed 1 Low O - Ongoing 2 Medium PL - Pipeline 3 High 2 0.30 2 0.30 3 1.20 2.7000 W - Weight R - Rating P - Proposed Definition: * Importance - supports / contributes to the iimplementation of the Recovery and Reconstruction Framework * Impact - may include number of people reached / serviced and expected degree of change due to synergy / linkage with others * Capacity - may include available skills and resources . Counterpart funds to support local projects * Others - sustainability, efficiency, urgency RANK 4.5 Post-Disaster Needs Assessment PRIORITY PROGRAMS, FUNDING REQUIREMENT and the DRAFT SCHEDULE Amount (4) RANK (1) 1 Priority Projects / Activities (Description) (2) Concessionary Loans for Yolanda affected-MSMEs Target Clients Location / Sites (3) (4) Tacloban City, Leyte, Eastern Samar, Samar, Southern Leyte and Biliran 11,588 in Php M Proposed Funding Source Recommended Funding (6) Report of Damage (Php M) Implementing Agencies (7) Timeline / Implementation Period (8) Remark (9) 13,230.11 25,000.00 International SBC & DBP and DTI as Jan -Dec 2014Donor Agencies Collaborator Agency Dec 2016 Plan 4,985.26 7,000.00 International SBC & DBP and DTI as Jan -Dec 2014Donor Agencies Collaborator Agency Dec 2016 Plan Micro Enterprises - Interest Free (Loan Fee e.g at 2% p.a) will be to cover only loan program administrative costs 2 MSME Loan Assistance Programs (e.g. SBC) (e.g SB Corp - Enterprise Rehabilitation Financing & DBP National Rehabilitation Fund for Calamity-Stricken Areas) 3 Grant Assistance in Kind (e.g.Sari-sari store) Project Provision of simple tools and equipments (priority to RuMEPP Clients) 4 Tacloban City, Leyte, Eastern Samar, Samar, Southern Leyte and Biliran 1,328 Small & Medium Enteprises Tacloban City and 100 20 selected sites in Leyte, Eastern Micro Traders Samar and Samar Provinces Tacloban DZR Re-establishment of Pasalubong Center in Tacloban City Airport Aiport, Tacloban and Bus / Port Terminals Port Area & Malls Setting-up / reconstruction of Pasalubong Center in Tacloban City Airport and Bus / Port Terminals 170 396.90 13.20 International DTI Donor Agencies June - Dec 2014 Plan 575.22 10.00 International June 2014- June 2016 June 2014- Dec Donor Agencies 2014 Plan Post-Disaster Needs Assessment PRIORITY PROGRAMS, FUNDING REQUIREMENT and the DRAFT SCHEDULE Amount (4) RANK (1) 5 6 Priority Projects / Activities (Description) (2) Business Assistance Center Target Clients Location / Sites (3) (4) LGU Tacloban City 3748 Micro & Small Entprises Tacloban Port Area 1,073 in Php M Proposed Funding Source Recommended Funding (6) Report of Damage (Php M) 13,231.31 402.66 Establishment of Diskwento Product Depot Implementing Agencies (7) Timeline / Implementation Period (8) Remark (9) 18.00 DTI & LGU LGU & DTI Feb 2014-June 2016 Ongoing (DTI put -up computer & desk) 20.00 DTI & Private Companies DTI & LGU April - June 2014 PL 22.50 DTI BSMED DTI June 2014-July 2014 Plan DTI & LGU, PNP Dec 2013 - Dec 2016 Ongoing DTI June 2014-Dec 2014 Plan Trading MSMEs 7 SME Caravan / Roving Academy Institutionalized compendium of interventions to MSMEs towards exporting of products Leyt SMED Center, Kanhuraw Convention Center DTI Leyte Compound 352 0.660915 Micro Enterprises 453 807.19 2.76 DTI & Private Companies 3.76 102.00 National Fund 8 Diskwento Caravan 9 DTI initiated caravan to facilitate the supply side of basic commodities by wholesalers for the End Consumers Provision of Shared Service Facility (SSF) Coastal Areas e.g San Jose and 107 Post-Disaster Needs Assessment PRIORITY PROGRAMS, FUNDING REQUIREMENT and the DRAFT SCHEDULE Amount (4) RANK (1) 10 Priority Projects / Activities (Description) (2) Product Development & Packaging Design for GDH, Furniture and Fashion Accessories from Typhoon Debris Target Clients Location / Sites (3) (4) Tacloban City 17 in Php M Proposed Funding Source Recommended Funding (6) Report of Damage (Php M) 121.85 Implementing Agencies (7) Timeline / Implementation Period (8) Remark (9) 9.00 DTI DTI June 2014-Dec 2014 Plan 8.00 DTI - BSMED DTI & PEVAI April 2014 PL GDH, Furniture & Fashion Accessory MSMEs 11 SM Mega Mall, Participation to the Visayas wide Trade Fair for Yolanda Affected Mandaluyong City MSMEs 17 91.39 GDH, Furniture & Fashion Accessory MSMEs A Trade Fair for Yolanda Affected MSMEs in Region 6, 7 & 8 Capacity Development for Business Membership Organizations 21 83.98 9.30 DTI 12 13 14 Development of Business Park Development of the Eastern Visayas Regional Growth Area (EVRGC) and light industrial economic zone Northern Brgys Brgy Kawayan 266 460 961.76 1,725.67 15,000.00 International 15,000.00 International Donor Agencies Revitalization of industrial economic zone Large & Medium 36,617.71 62,214.76 LGU & Private Sectors June 2015-2016 LGU, DTI, Private January 2015Sectors June 2016 Plan Plan Post-Disaster Needs Assessment 2014-2015 DTI -8 STRATEGIES AND PROGRAMS Programs/Activities/ Projects a. 1. 2. Technical Assistance Entrepreneurial Trainings Techno Transfer and Start Up Trainings b. 1. 2. 3. Marketing Assistance Adopt an SME Program Product Development Participation to Trade Fairs c. 1. Technology Assistance Provision of Shared Service Facilities (SSF) Equipment d. BuB Projects Implementation e. Credit Assistance Description No. of trainings conducted No. of Participants No. of SME identified No. of product devt. conducted No. of participants No. of fairs conducted No. of participants No. of SSF Established No. of beneficiaries No. of BuB established No. of beneficiaries No. of SME assisted Amount of loans released Cost (PhP Thousands) 2014 2015 6,100 1,500 34,554 45,000 39,964 50,000 3,000 4,000 Post-Disaster Needs Assessment 2014-2015 DTI -8 STRATEGIES AND PROGRAMS Cost (PhP M) Programs/Activities/ Projects a. 1. 2. b. 1. 2. 3. 4. c. 1. Technical Assistance Entrepreneurial Trainings Techno Transfer and Start Up Trainings Marketing Assistance Adopt an SME Program Product Development Participation to Trade Fairs SME Roving Academy Technology Assistance Provision of Shared Service Facilities (SSF) Equipment d. BuB Projects Implementation e. 1. 2. f. 1. 2. Credit Assistance Concessionary Loan SBC- ERF Consumer Welfare Diskwento Caravan Diskwento Depot Total Cost 804.60 DTI FUND 2014 2015 2016 6.1 1,500.00 1,500.00 34.55 45.00 39.964 50.00 200.00 300.00 DONOR (For Fund Sourcing) 798.5 9.00 8.00 22.50 300.55 25,000.00 7,000.00 2.76 20.00 266.00 400.00 Post-Disaster Needs Assessment Thank You!
© Copyright 2026 Paperzz