ILC-CR-0004 Main Linac extension: Implementation status 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 1 / 18 Overview • the most recent “official” release of ILC lattice description files (MAD8 Extended Standard Input Format files), corresponding to the TDR, was made at ALCWS-2015 in April and designated “ILC2015a” - https://bitbucket.org/whitegr/ilc-lattices • goals of present work: - implement Change Request #2 (CR02) … single 4.1 m L* for both detectors > merge ILC2015a FF design with T. Okugi design … FF length increased by 11.64 m > includes Change Request #6 (CR06) … IP BPM - fix error in laser wire chicane length in BSYs … maintain identical e- and e+ systems > BSY length decreased by 23.87 m > photon path length (undulator exit to target) decreased by 12.23 m * ~372 m to ~360 m * 40 m drift space in e- system (d/s dogleg) to bypass target infrastructure - implement Change Request #4 (CR04) … extension of Main Linac tunnels > pLET system (pDR → IP) length increased by 2965.609 m (after changes mentioned above) > part of length increase in pLTL, part between pBC2 and pML, the rest at the end of pML (before pMPSCOL) > includes Change Request #10 (CR10) … BC1 and BC2 part of Main Linac > path length difference (e-/e+) set to 10 x CDR 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 2 / 18 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 3/18 LTL to turnaround match LTL FODO cells DR extraction BC2 to Main Linac match turnaround Return Line Main Linac Main Linac extension IP 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 4/18 e+ system changes for CR04 • pLTL - add 20 “RETURNCELLC” FODO cells after MARKer “M_8_cell_end” > did NOT change FODO cell length (still 72.493 m cell length) - add 32.939 m to “RTMATCH” beamline just upstream of turnaround - rematch return line to turnaround • pBC2 - add 88.5 m to “BC2_ML_2” beamline (matching between pBC2 and pML) - rematch pBC2 to pML • pML - inserted space for an additional complete 12-string (36 ML unit) cryo unit … details to follow • pBSY - shorten laserwire chicane from 76.9 m to 42.6 m > shorten center drift from 11.5 m to 5.0 m - replace eight (8) quadrupoles used to match to FF through polarimeter chicane > old: length = 3 m, bore = 80 mm > new: length = 2 m, bore = 12 mm - rematch BSY to FF through polarimeter 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 5/18 LTL turnaround LTL FODO cells 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 6/18 LTL turnaround RTMATCH 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 7/18 kickers BC2 Main Linac BC2_ML_2 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 8/18 Main Linac BSY DUNIT1 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 9/18 • positron Main Linac extended at downstream end (before MPS collimation) • inserted space for an additional complete 12-string (36 ML unit) cryo unit - include space for end boxes, service boxes, and warm drifts - same quadrupole center-to-center spacing as Main Linac - same cryo unit-to-unit spacing as Main Linac - replace cryogenic quadrupoles with BDS “Q75L2000” magnets > core length = 2 m, bore = 75 mm - maintain Main Linac optics (β-functions) • no additional cryomodules included (drifts, quads, BPMs, XCORs, and YCORs only) • if populated with cryomodules, would provide an additional ~30 GeV of acceleration 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 10/18 From “TDR lattice (2015a) review and status” (ALCW-2015) https://agenda.linearcollider.org/event/6557/session/7/contribution/77/material/slides/1.pdf Recreating the TDR CFS geometry subsystems comments EBSY1 / EBSY2 PBSY1 / PBSY2 Redefinition errors discovered during “deck integration”: • polarimeter chicanes were copied from *BSY2 to *BSY1 as separate laserwire detection chicanes • names of elements (bends and drifts) were not changed • names of parameters that defined bend and drift lengths were not changed • values of parameters that defined bend and drift lengths were changed in *BSY1 files • when *BSY1 file is loaded, LW chicane is 45.1 m long • when *BSY2 file is loaded, LW chicane is redefined to be 76.9 m long (ΔL = 31.8 m) • TDR CFS coordinates include BSY LW chicanes that are each 31.8 m too long PBDS was 0.95 m shorter than EBDS due to rematching between PBSY and PFFS, so: • shorten PMPSCOL by 0.95 m and rematch • modify PBSY2 such that EBDS and PBDS are now identical • redefine TDR CFS coordinates for TPML2BDS Treaty Point (e+) to be symmetric w.r.t. IP with TPS2EBDS treaty point (e-) 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 11 / 18 MPS collimation FF kickers 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 12/18 From “Report of Global Timing Working Group” EDMS number: D00000001097725 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 13/18 ΔS = ±340 mm From T. Okugi’s presentation at POSIPOL2015 https://eventbooking.stfc.ac.uk/uploads/posipol/posipolokugi20150902.pdf 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 14/18 From “SB2009 Proposal Document” https://ilc-edmsdirect.desy.de/ilc-edmsdirect/file.jsp?edmsid=D00000000900425 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 15/18 Continuing Work • MAD8 SURVEY tape-file output precision (10 digit) is too small for total LET (length > 32 km) … need to use sum(Li) for μ-level precision! - investigate using MAD-X instead of MAD8 • fix path length between kickers and septa in DR (127 μm + 32 μm = 159 μm error) • make identical modifications to electron systems - DR injection/extraction model - space for 12-string (36 ML unit) cryo unit in eML - FODO cells in eLTL • add path length adjustment chicane in e+ source system - Okugi-san’s chicane after booster linac (same location relative to booster linac) - assume ±230 mm range (as specified in CR04) … set initially to +230 mm and readjust path lengths - don’t move booster linac or include new energy compressor yet (Change Request) • verify BSY laserwire chicane offset large enough for laserwire photon detection - old (polarimeter) chicane offset was 20 mm … offset now is 8 mm • don’t change eBSY fast abort line (requires further study) • shift all Treaty Point coordinates to restore IP to origin (0,0,0) • earth’s curvature following and vertical dispersion only if time permits • release ILC2015b in 2015 (!) 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 16 / 18 Conclusions and Outlook • implementation of CR-0004 is about 50% complete - need to apply positron system modifications to electron systems - need to add positron path length correction chicane - need to shift coordinate system / Treaty Points to restore IP at origin (0,0,0) - still hoping to finish in 2015! • e+/e- path lengths now differ by exactly 10 x CDR (within 1 μm) - there are sub-millimeter path length errors in DR Injection/Extraction layout to fix • all changes (such as they are) will be available from the Lattice Repository (from the “dev” branch) • ILC2015b to be next release 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 17 / 18 End Thanks! 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley 18/18
© Copyright 2026 Paperzz