Issues of the Meeting Yutaka USHIRODA, KEK Jul. 22, 2012 12th B2GM Outline • Schedule – Accelerator construction schedule [conclusion] • QCS construction status • Beam background crisis (Feb.) and mitigation measure – Commissioning scenario and BEAST [discussion] • Other issues – Beam background, radiation tolerance (safety factor/tuning knobs) – Readiness of TOP, PXD, KLM – Mechanical design of SVD – Cables and service space – Grounding 2011/11/11 2 Schedule 2011/11/11 3 Baseline Schedule (Sep. 2011) 2015 2014 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 BEAST Out QCS instal. 1 Physics Run In magne t 12 In magne t NEW! QCS field On Beam Line Pit Pit On GCR TOP ready PXD ready TOP instal. CDC instal. E-cap instal. VXD installation Baseline considered in Sep. 2011 QCS schedule was too tight (already) BEAST with QCS followed by detector installation 4 months for BEAST is also very tight Two months for TOP is too generous Feb. 26, 2012 4 2 Feb. 26, 2012 ARC told us to be careful. There was a Beam Background crisis. What is the current status of Beam Background and QCS construction? 5 Can we start QCS-R construction from now?? Issues to be cleared • We understand beam background well so that there will be no further request of significant design change in H. Nakayama, beam QCS-R background session • We are confident that QCS-R construction can be started without waiting for feedback from QCS-L construction • There will be meaningful gain in schedule by launching two QCS productions in parallel (we have enough capability in equipment and manpower to do in parallel; we have no other bottleneck) N. Ohuchi, B. Parker, Y. Ohnishi If any of the above three is negated, we should not start QCS-R now, and we have to reconsider our global schedule. Feb. 26, 2012 6 2015 6 2014 6 7 8 9 10 11 1 2 3 4 5 7 8 9 10 11 12 In install install 2 3 4 5 2016 6 7 8 9 10 11 remov e remov install install e extrac t install QCS field meas. On Beam Line Pit "G"CR E-cap install ation, cablin g, test, … GCR open Eyoke, pull out Ecap push in Ecap, close Eyoke CDC install ation, cablin g, test, ... TOP ready TOP install ation, cablin g, test, ... PXD ready Feb. 26, 2012 12 Physics run (full fledged) QCS install, cool QCS ready QCS integration 1 run (w/o VXD) variable (3-6months) BEAST (w/o solenoid) Global Operation Belle roll-out/in concrete shield Magnets behind QCS Field measurement Global Position 12 VXD installation, cabling, test, … 7 2015 6 2014 6 7 8 9 10 11 1 2 3 4 5 7 8 9 10 11 12 1 BEAST (w/o solenoid) Global Operation Belle roll-out/in concrete shield Magnets behind QCS 2 3 4 5 2016 6 Physics run (full fledged) 7 8 9 10 11 install install QCS install, cool QCS ready QCS field meas. On Beam Line Pit "G"CR GCR E-cap install ation, cablin g, test, … CDC install ation, cablin g, test, ... TOP ready TOP install ation, cablin g, test, ... PXD ready Feb. 26, 2012 12 Physics run (full fledged) In QCS integration Field measurement Global Position 12 VXD installation, cabling, test, … 8 Commissioning strategy • Vacuum scrubbing without QCS/Belle solenoid • What to install after completion of what? – TOP, CDC, E-cap installation after vacuum scrubbing? – VXD installation after understanding background level with QCS/Belle solenoid?? Strategy depends on what we will be able to learn about machine, and how soon BEAST session (Vahsen, Tanaka) Feb. 26, 2012 9 Start of physics run • Dec. 2015 (baseline Sep. 2011) • Can we relax the schedule? • Can we start physics run w/o VXD? physics session (Trabelsi, Golob) Feb. 26, 2012 10 Other issues 2011/11/11 11 Beam background and radiation tolerance • Good progress in simulation. All the efforts highly appreciated • In the end, simulation is just simulation. We need safety factor to be safe in reality Q: What is the current best knowledge by simulation? Q: What are still missing in the simulation? Q: What are the safety factors? Q: (If not enough margin) Are there any “tuning knobs” in detector parameters to live longer? Beam background session (Nakayama) 2011/11/11 12 Mechanical design of VXD • Was not ready in March B2GM, but steady progress seen since April. – First drawing without geometrical conflict obtained in April • Improving design in sense of – Better heat removal – Easiness (feasibility) of installation – Mechanical stability VXD mechanical designers meeting (Tanaka) Feb. 26, 2012 13 Cables, pipes and service space • Ideas on cables and pipes became more and more concrete – If not, show any preliminary ideas • Area around QCS has changed for particle shield (even narrower space for service) • Slots through B/E-KLM gap and space around F/Bendcaps are also being claimed IR mechanics and service space (Tanaka) Service space around endcap/endyoke (Adachi) • Space inside EH • Space in exp. hall ( Ushiroda) 2011/11/11 DAQ session (Itoh) 14 Readiness of TOP/PXD/KLM/… • TOP/PXD/KLM were on the critical path (depends on the global schedule) (depends on how you declare the progress) Feb. 26, 2012 15 Grounding • Different grounding and shielding plans from different sub-detectors • Compile plans and draw global picture • Possibly improve (within practical boundary conditions) • Set the baseline strategy Grounding session (Arteche) 2011/11/11 16
© Copyright 2026 Paperzz