BUILDING CONTROL CHARGING SCHEME Schedule 2: Domestic Extensions & Alterations April 2017 Before You Build: You or your agent must advise the council of your intentions either by submitting a Full Plans application or a Building Notice. The charge payable depends on the number of domestic works and / or the total floor area. The following table may be used in conjunction with the Halton Borough Council Scheme of Charges to calculate the appropriate fee(s) for Building Control applications. Charges are Payable as Follows – Full Plans Applications: Plan Charge – Payable at the time of submission to cover the plan assessment and decision on the application. Inspection Charge (if applicable) - Payable following the first site inspection covering all site inspections. Building Notice: If you submit a Building Notice, the appropriate Building Notice charge is payable at the time of submission and covers all necessary checks and site inspections. In Schedule 2, for categories 1 – 12 the Building Notice charge is equal to the sum of the plan charge + inspection charge + Building Notice additional charge. For categories 13 – 21 no Building Notice additional charge applies. Regularisation: If you apply for a Regularisation Certificate, in respect of unauthorised building work, commenced on or after 11th November 1985, you will pay a regularisation charge cost for assessing your application and all inspections. The charge is equivalent to the Building Notice charge (exc. VAT) + 20% + additional charge for explorative work. For larger schemes the Council may agree to charges being paid in instalments. Please consult the Building Control Section on 0151 511 6565 for further details. ** Please note that in the following Schedule VAT has been calculated at 20% unless otherwise stated ** SCHEDULE 2 - DOMESTIC EXTENSIONS AND ALTERATIONS Full Plans Schedule 2 Category: Plan Charge (£) Net Inc VAT Inspection Charge (£) Net Inc VAT Building Notice Regularisation Charge (£) Charge (£) Net Inc VAT No VAT Extensions to Dwellings: To Include: Basements, Ground floor single st storey, two storey and 1 floor. 1. Extension less than 10m² 150.00 180.00 240.00 288.00 435.00 522.00 570.00 2. Extension between 10m² and 40m² 3. Extension between 40m² and 100m² 150.00 180.00 330.00 396.00 525.00 630.00 690.00 150.00 180.00 450.00 540.00 645.00 774.00 810.00 4. Loft conversion no dormer 150.00 180.00 300.00 360.00 510.00 612.00 660.00 5. Loft conversion with dormer 150.00 180.00 330.00 396.00 540.00 648.00 690.00 150.00 180.00 240.00 288.00 420.00 504.00 540.00 120.00 144.00 180.00 216.00 315.00 378.00 420.00 150.00 180.00 425.00 510.00 620.00 744.00 780.00 Loft Conversions: Detached / Attached Garages: ‘ 6. All Garages less than 60m2 Garage Conversions: 7. Alterations to garage to form a habitable room 20m² Detached habitable building: Not a single dwelling 8. Detached habitable building up to 100m2 Other domestic work and alterations 9. Structural and internal alterations 165.00* 198.00* with a commercial value less than £2000 10. Structural and internal alterations 240.00* 288.00* with a commercial value of between £2001 and £5000 N/A N/A 180.00* 216.00* 255.00 N/A N/A 255.00* 306.00* 360.00 11. Structural and internal alterations 135.00 with a commercial value of between £5001 and £10,000 162.00 150.00 180.00 300.00 360.00 405.00 12. Structural and internal alterations 135.00 with a commercial value of between £10,001 and £20,000 162.00 210.00 252.00 360.00 432.00 480.00 13. Replacement windows/doors up 120.00* 144.00* to 10 openings 14. Replacement windows/doors 11 210.00* 252.00* or more openings N/A N/A 120.00* 144.00* 150.00 N/A N/A 210.00* 252.00* 270.00 Schedule 2 Category: Full Plans Plan Charge (£) Net Inspection Charge (£) Building Notice Regularisation Charge (£) Charge (£) Inc VAT Net Inc VAT 195.00* 234.00* N/A N/A 195.00* 234.00* 240.00 16. Underpinning of existing 300.00* 360.00* foundations with a commercial value of less than £5000 17. Underpinning of existing 360.00* 432.00* foundations with a commercial value of more than £5000 18. Renovation/replacement of a 210.00* 252.00* thermal element, including existing roof, wall or floor N/A N/A 300.00* 360.00* 390.00 N/A N/A 360.00* 432.00* 465.00 N/A N/A 210.00* 252.00* 270.00 19. All Electrical work carried out by 150.00* 180.00* a person NOT Part P registered N/A N/A 150.00* 180.00* 210.00 N/A N/A 330.00* 396.00* 435.00 15. Installation of a heat producing appliance Net Inc VAT No VAT (Where able to produce an acceptable BS7671 test certificate) 20. All Electrical work carried out where NO acceptable BS7671 test certificate is given 330.00* 396.00* 21. Installation of cavity wall N/A N/A 15.00* 18.00* 24.00 15.00* 18.00* insulation not under the Competent Persons Scheme Any work not described in categories Please contact our Building Control team 1-21 *This charge is the combined Plan and Inspection charges and payable at time of deposit of the application. NB: For any building work not found within Schedules 1, 2 or 3 – please consult the Building Control Team Table A: Differential Matrix for residential work When a single application involves works to be undertaken at the same time as an extension/loft conversion to the dwelling then a reduction as per Table A below can be applied to the estimated cost of alteration work: 1 2 Reduction in Building Control Charge shown in Schedule 2 when that work is Circumstance attracting a reduction being carried out at the same time that any work shown in Category 1 through to 5 in Schedule 2 is being undertaken Installation or replacement of windows 50% of Full plans / Building Notice Charge and or doors in a dwelling -house (under dependent upon which application is 10 units) submitted Where the work comes within the scope of 50% of Full plans / Building Notice Charge Schedule 2 and the estimated cost of the dependent upon which application is building work is less than £10,000. submitted (Categories 9-11 only) Please Note: ● All reference to m2 means the internal floor/plan dimension area. ● When a single application involves multiple extensions the category used will be the total m2 relating to all floor areas.
© Copyright 2026 Paperzz