World Meteorological Organization EXECUTIVE COUNCIL Sixty-Ninth Session Geneva, 10 to 17 May 2017 EC-69/INF. 16.2(2) Submitted by: Secretary-General 2.V.2017 STRATEGIC AND OPERATIONAL PLANNING AND BUDGET Status report and way forward on budget-related actions Summary and Purpose of Document The purpose of this document is to report on the progress made in respect of two actions placed by Cg-17 when approving the WMO budget for the seventeenth financial period, in view of the need to consider re-scoping activities and Programmes to ensure that WMO resources remain aligned with the priorities identified in the Strategic Plan 2016–2019. ACTION PROPOSED The Executive Council is kindly required to take note and to comment as appropriate. 1. Background When approving the WMO budget for the seventeenth financial period, Cg-17, in view of the need to consider re-scoping activities and Programmes to ensure that WMO resources are aligned with the priorities identified in the Strategic Plan 2016–2019, placed the following two actions on the Executive Council and the Secretariat respectively: (a) (b) Requested the Executive Council, in close cooperation with the Secretariat, to establish required mechanisms in order to review WMO activities and Programmes and to consider additional efficiencies and savings, re-scoping of activities and the use of programme support costs associated with voluntary contributions, as well as the associated risks and opportunities; Requested the Secretary-General to include information on the costs of the WMO activities and Programmes and the detail of costs by object of expenditure in the budget proposals for the second biennium (2018–2019) of the seventeenth financial period and the eighteenth financial period (2020–2023). The purpose of this document is to report on the progress made in respect of these actions. 2. Progress in the implementation of an improved budget structure to provide information on the costs of the WMO activities and Programmes and the detail of costs by object of expenditure In order to positively address the action placed by Congress, considerable work has been done to define an improved budget structure that meets the information requirements of Members and is sufficiently flexible and simple to be used for the budget process. This improved budget structure was presented and endorsed at EC-68. A table summarizing the main elements of this structure is provided in the Annex for information. EC-69/INF. 16.2(2), p. 2 Since EC-68, work in respect to this action has focussed on two main areas: (a) The preparation of the budget proposal for second biennium of the seventeenth financial period (2018-2019) in accordance with the improved budget structure. This work is presently progressing on schedule. A corresponding EC-69/Doc. 16.2(4) and EC-69/INF. 16.2(4) documents are submitted to the Council; (b) The definition of requirements and the implementation of the necessary changes to the Oracle ERP system, in order to be able to use the improved budget structure operationally during the execution of the biennial budget 2018-2019. The first part of the action has progressed according to plans and is now completed: requirements have been defined and documented. The implementation of the changes shall start in April 2017, in order to ensure availability of the modified Oracle system by year-end. 3. Progress in the review of WMO activities and Programmes and to consider additional efficiencies and savings, re-scoping of activities and the use of programme support costs associated with voluntary contributions, as well as the associated risks and opportunities Since the last EC, the WMO Secretariat has progressed in the identification and exploitation of efficiency and saving opportunities, with a particular focus on the broad administrative area as well as on the organization of constituent body meetings. The following sections provide a brief overview of opportunities already realized as well as a list of those being currently studied or implemented. 3.1 WMO Scientific and Technical Programmes The following efficiency and savings measures will be introduced in the 2018-2019 budget: Research (a) Programme implementation will extensively rely on electronic means of information and communication technologies, e.g.: (i) extensive use of ICT tools for management of ongoing activities for Task Team; (ii) the use of teleconferences and webinars to optimize or reduce the need of face-to-face meetings and workshops; (iii) implementation of machine-to-machine interface between national databases and OSCAR for the collection of WIGOS metadata; (iv) the development of e-learning material; and (v) further increased use of remote working based on collaborative tools provided by the extranet; (b) Better collaborative working methods will be developed within the Secretariat with a view to sharing resources for promoting activities at the regional level, and also to making use of the making use of regional training centres; (c) Activities will be reprogrammed and combined to achieve savings: (i) the merging of DBCP and SOT activities will be considered; (ii) the GCW working structure will be adapted to ensure an increased focus on high priority deliverables; (iii) full consideration will be given to the increased efficiencies by developing joint workplans with other TCs, e.g. ET Sea Ice of JCOMM; (iv) better collaboration with partners will be realized to build on their expertise and current projects and products; and (v) more early career scientists will be engaged for specific tasks; (d) Global coordination of the SDS-WAS activities between regional SDS-WAS nodes with self-funding of regional nodes will be considered; (e) The management structure for the research programmes will be streamlined. The CAS-17 session in October 2017 is planned to be 2-days long. Further significant savings could be achieved in 2020-2023 if CAS is replaced by a WMO Science Advisory EC-69/INF. 16.2(2), p. 3 Board (forward looking at next 10 to 20 years on broad scientific and technical matters) and a Research and Development Management Committee; (f) Better integration between data management and modelling activities is to be considered (e.g. on the side of formulating requirements); (g) More cross-cutting activities will be established to mobilize the expertise of individual focal groups in GAW toward more holistic products and services; (h) Most of the meetings will combine either several topics or be organized back-to-back with other international gatherings; (i) Activities will be reprogrammed and combined to achieve savings: (i) activities will be combined to achieve savings for the organization of quadrennial International Workshops on Tropical Cyclones, biennial technical workshop on tropical cyclones (with the Education and Training Programme and the Tropical Cyclone Programme) and 2018 Meeting of the Tropical Meteorology Research Working Group; (ii) the 2019 Workshop on Operational Monsoon Research will be merged with a key activity of the SCMREX Research and Development Project; (iii) the High Impact Weather project workshop (Multi-scale prediction, uncertainty and decision-making) will be combined with the biennial Joint SERA/IRDR Workshop, and SERA Working Group annual meeting 2019 (in collaboration with GURME). Capacity Development and Partnership (a) Secretariat activities will be streamlined and rationalized: (i) Education and Training Programme database will be synchronized with the WMO Country Profile database, hence minimizing duplication and enhancing better access to programme related information; (ii) more efficient reporting and outreach activities will be programmed; (iii) requirements for Secretariat staff missions will be carefully scrutinized with a view to making savings, including scrutiny of the duration of missions and minimizing multiple Secretariat representation at meetings organized outside Geneva; and (iv) meetings of Directors of Regional Training Centres to be combined with the quadrennial Symposium on Education and Training; (b) Collaboration with WMO partners will continue to achieve savings: (i) negotiation with partners in China resulted in their acceptance to meet the entire cost of stipend for WMO fellows, for which WMO was hitherto responsible. This arrangement will continue in 2018-2019; (ii) the 2019 WMO Training Development Workshop will be organized in collaboration with CALMet to reduce the number of experts requiring travel support to act as facilitators; (c) In the area of the Regional Progamme, savings measures will be taken, including: (i) increased in-kind contribution and hosting of meetings and activities by Members; (ii) reduction in the number of regional associations working groups and task forces; and (iii) reduction in the duration of the regional associations sessions. Meteorological Applications (a) The following savings measures will be taken: (i) voluntary services to provide expertise will be continuously used, where possible; (ii) the number of meeting days will be optimized; (iii) video conferencing will be extensively used in conjunction with face-to-face meetings, where possible; (iv) as in previous years, opportunities will be identified to convene the following meetings/events back-to-back in 2018 and 2019: CAeM-16/TECO, CAeM MG, ET meetings, VASAG meeting, and VAAC BP workshop; (v) as in previous years, opportunities will be identified to align and streamline the WMO and ICAO programmatic activities in the AeM domain, including the nature and scope of the various expert teams/working groups involved; (vi) the CAeM-16 session will serve as an opportunity to review the nature and composition of the CAeM expert teams with a view to ensuring continued alignment with the programmatic needs and EC-69/INF. 16.2(2), p. 4 priorities of WMO and the aviation stakeholder; (vii) tropical cyclone regional body sessions can be organized back to back with project management team meeting, and UNESCO-IOC training activities to expand the scope of warning services to the Members; (viii) opportunities will be identified to convene JCOMM – MAN and ET meetings back-to-back in 2018 and 2019; and (ix) opportunities will be identified to align and streamline the WMO and IMO, IHO and UNESCO-IOC programmatic activities in the MMO domain, including the nature and scope of the various expert teams/ working groups involved; (b) Activities will be reprogrammed and streamlined, e.g.: (i) the EC WG-DRR meetings will be discontinued. Main guidance for DRR will be provided by DRR FP RA-TC-TP; (ii) UIP WG-HUM will be officially discontinued and the same role will be assumed by the CBS Humanitarian Task Team; and (iii) UIP WG-DRF will be officially discontinued and the same role will be assumed by WG-HRA; (c) The seventh session of JCOMM will serve as an opportunity to review the nature and composition of the JCOMM expert teams with a view to ensuring continued alignment with the programmatic needs and priorities of WMO and the marine stakeholders. Climate Applications (a) Stakeholder workshop (virtual or otherwise) will be downsized with LC-LRFMME and key stakeholders; (b) Pilot RCOF sessions will be organized with new operational practices (e.g., for MOS downscaling of global forecasts with empirical tools such as CPT, tailored forecast products). IPCC is also implementing efficiency measures (a) The IPCC Panel decided (IPCC-44) to hold Bureau Meetings back-to-back with Plenary Sessions for cost savings; (b) Executive Committee meetings are held monthly via WebEx to reduce costs of meetings; (c) Travel will be organized well in advance (e.g. two-three months ahead of the scheduled meetings) to ensure cheaper tickets. 3.2 Executive management, legal services and oversight (a) The agreements with Spain and Russia for producing Bulletin have been renegotiated for reduced translation costs for WMO documents and publications. The annual report could be issued less frequently, e.g. every two years; (b) Travel requirements will be better assessed and optimized; (c) ELIOS, the new WMO Document Management System, is expected to lead to more efficiency and transparency in the processing of correspondence and handling of internal documentation processes; (d) WMO contribution to the United Nations Development Group (UNDG) is under review, taking into account the position of other United Nations system organizations with regard to their contribution to UNDG; (e) The use of resources for legal affairs will be streamlined through outsourcing to external law firm during peak periods; (f) Cost-effectiveness can be raised by reducing the length of meetings, reducing the number and length of documents, agreeing on a limited number of languages for EC-69/INF. 16.2(2), p. 5 translation/interpretation where specific language are not mandated, organizing meetings via teleconference, non-organizing or postponing meetings; (g) Co-sourcing of engagements with other departments and re-scoping of the plan of work for internal audit will be considered and carried out to ensure a better use of resources; (h) Reform of constituent body structures has the potential to redirect some resources to more productive meetings and activities. Whilst cost savings are not the main objective of this reform, it can be expected that moderate savings in the order of up to CHF 1 million per financial period could be achieved thanks to the proposed measures. In addition, it may be worth looking at the practices for the organization of thematic conferences and subsidiary body meetings which in total absorb resources in excess of CHF 8 million in the current financial period. 3.3 Language, conference, and corporate publication services (a) The outsourcing of most of the print shop activities to external suppliers will allow the department to make considerable savings in the rental of the equipment; (b) The organization of the LCP department is adjusted in order to provide the services at a lower cost for the Organization. 3.4 Resource Management 3.4.1 Savings achieved Out-planting of Travel Agency: Since February 2016, the WMO changed arrangements for the provision of travel services from an external Travel Agency by moving to an out-planted arrangement. As a result, support to WMO travellers and travel organizers is provided by a service centre located in Poland, with a corresponding considerable reduction of applicable booking/service fees. The resulting total annual savings achieved in the period 1 February 2016–31 January 2017 are equal to CHF 350,647. It is expected that a similar level of savings will be achieved in 2017 and in future years. Closure of the physical Library: In December 2016, the WMO closed its physical library. Whilst library services continue to be provided with respect to electronic publications as well as subscriptions, the closure of the physical library allowed to free up ca. 280 sqm of office space that will be re-used as a multipurpose meeting area. In addition, this decision also allowed to free up of some of the librarian’s time, which has been re-allocated (p.t.) to support information management activities (registry and document management). IT Helpdesk: Starting from 2015, WMO has progressively outsourced the IT helpdesk function to an off-site operator. This change resulted in improved service levels (e.g. availability of a 24/7 continued support in English and French) and in a reduction of one staff and two consultant positions, with a net saving of CHF 163,000 per year (staff CHF 140,000, consultants CHF 260,000, helpdesk contract CHF 237,000). WMO Registry: Taking the opportunity of the closure of the physical Library and the partial re-allocation of an existing staff member, the staff in the Registry unit could be reduced by one position on the occasion of the retirement of one staff member. The resulting cost savings are quantified at CHF 116,000 per year. EC-69/INF. 16.2(2), p. 6 Social counselling and Ethics Officer services: On the occasion of the retirement of the WMO staff member providing social counselling services, the corresponding position has been closed. Social counselling services to staff will be provided through a shared resource with ITU. With the savings achieved, it was also possible to finance the Ethics Officer’s services, which are also provided through a resource shared with ITU. The net result is a saving of CHF 120,000 per year. Part of these savings will be allocated to finance ombudsman services, for which a similar cost-sharing agreement is being defined. 3.4.2 Savings expected On-line booking tool for travel The adoption of an on-line booking tool (i.e. an application allowing travellers or their secretaries to select and book - through the WMO travel agency - flights that meet the criteria established by the WMO travel policy) would allow a further reduction of booking/service fees from CHF 65 per booking to approximately CHF 22 per booking. Implementation of this tool could deliver annual savings which are comparable in size with those already obtained with the out-planting of travel services. However, in order to achieve these savings, it is necessary to invest in the implementation of this application, which also needs to be linked to the Oracle ERP system. As part of the same project, WMO would like to develop a travel claim management tool, enabling travellers to input their travel claims and upload scanned copies of the supporting documentation for further processing by the WMO travel unit. A feasibility study is currently on-going to identify a suitable technical solution and to confirm the business case for this investment. Reorganization of IT and Common Services divisions Following the merging of the IT and the Common Services divisions, an integrated hub for the provision of services to WMO staff and tenants has been put in place. The synergies obtained, together with the increased recourse to outsourced services, can make it possible to achieve a reduction of staffing levels, without impact on the quality of the service, that are quantified at ca. CHF 530,000 per annum. Achievement of this reduction has been already included among the assumptions made in the budget for the biennium 2018-2019, although it is intention of the Secretariat to achieve these savings by limiting to the maximum social hardship. Replacement of the Google Infrastructure Since 2010, WMO relies upon the Google infrastructure to provide services such as e-mail messaging, calendar and contacts management, cloud-based storage space (G-drives) as well as mini-sites for collaboration (G-sites). At the time when the above-decision was made, Google was in an unique position to offer such a bundle of integrated services in a cost-effective manner. Since then, the situation has evolved and nowadays a similar bundle of services is also provided by Microsoft as part of the license arrangements for the normal Office 365 bundle. Additionally, the use of the Google infrastructure has resulted in some practical inconveniences for WMO, due to the fact that this infrastructure encounters limitations in certain countries and that it targets the end-user community rather than the enterprises’ market. WMO could therefore replace the Google infrastructure with the corresponding services provided by Microsoft at no additional running cost, and achieve a saving corresponding to the annual service fees paid to Google (approx. CHF 60,000 per annum). This possibility is currently being studied, in view of the possible implementation of this change in 2017. EC-69/INF. 16.2(2), p. 7 Consolidation of the servers’ infrastructure at UNICC WMO hosts a significant proportion of its ICT applications at the UNICC (shared IT service centre for the UN system), including ERP (Oracle), multiple websites and specialized applications, telephone systems etc. Most of these were implemented as “point” hosting solutions that did not leverage the scale economies of hosting consolidation. A study is in progress to review the overall system hosting requirements of the Organization with a view to optimization of system availability, reliability and costs. This will most likely result in a mix of applications hosted both in the public “cloud” and in an optimized and dedicated infrastructure at the UNICC. We estimate this will result in significant savings in excess of CHF 200,000 per annum. Energy efficiency improvements As part of the maintenance programme of its premises, WMO is conducting an energy efficiency audit, in order to identify measures to reduce its energy needs and related costs. In this perspective WMO is considering the replacement of the glass façade on the south side of its building with photovoltaic glass and, in addition, the replacement of the current gaspowered combined heat and power plant (CCF – couplace chaleur-force) with a more efficient technology, e.g. heath pump or the utilization of the thermal energy of Lake Geneva through the Genève Lac Nation (GLN) project, which supplies heat and cooling facilities. In addition to make economic benefits, both measures would greatly contribute to the reduction of WMO CO2 emissions, thereby moving WMO towards the goal of becoming a carbon-neutral organization without the need for purchasing offset certificates. A feasibility study is currently on-going in cooperation with responsible local and federal Swiss authorities to determine technical solutions, economic viability and financing mechanisms. It is estimated presently that the implementation of these measures could lead to costs savings in the order of CHF 160,000 per annum. 4. Use of programme support costs Part of the action considered in section 3 of this document addressed the need to put in place a more transparent and effective mechanism for using revenues levied as programme support costs. In respect to this part of the action, the Secretariat, following positive decision by Cg-17, has put in place a special account that has the purpose of collecting programme support costs levied on extrabudgetary income, and to enable their allotment to activities linked to the support of extrabudgetary programmes, allowing a more transparent accounting of the source and utilization of these sums. In 2016, the income from PSC has been CHF 1.8 million. Out of this total, activities aimed at supporting Green Climate Fund processes have been financed, such as participation in Green Climate Fund meetings, advisory services at country level, and short-term staff supporting project coordination and management. The expenditure incurred in 2016 amounts to CHF 67,406. 5. Unfunded activities for the 2018-2019 biennium Seventeenth Congress approved the maximum expenditure for the seventeenth financial period (2016-2019) representing the budget growth of 2 per cent in nominal terms, while the Secretary-General proposed the budget increase of 7.4 per cent. Consequently, a great number of activities were excluded from the regular budget in 2016-2019. However, fully taking into account the requirements of the WMO Members, the Secretary-General has been introducing in the 2016-2017 biennium, and will introduce in the forthcoming 2018-2019 biennium, further savings and efficiency measures to accommodate the maximum number of activities within the approved regular budget funding. These measures include re-scoping of EC-69/INF. 16.2(2), p. 8 certain activities, combination of activities, streamlining of implementation arrangements, and further efficient use of ICT, as explained in detail in the present document. In addition, in order to optimize the regular budget, funding financed from assessed contributions, activities pertaining to extraordinary maintenance of the WMO headquarters building and the conference facilities, as well as to support services for extrabudgetary project backstopping, are excluded from the regular budget, given that these activities are funded from the income of rental of WMO headquarters building office and parking space and conference facilities, and from programme support cost income generated from the implementation of extrabudgetary project activities. In spite of the above measures, the Secretariat will not be able to fully mitigate the negative impact of the reduction in the budget growth from the proposed 7.4 per cent budget growth to the approved 2 per cent. In absolute terms, the budget growth reduction corresponds to the reduction of CHF 14.1 million for the seventeenth financial period (2016-2019), out of which a reduction of CHF 9.4 million is imposed in the 2018-2019 biennium budget. Such a large budget reduction for the seventeenth financial period, in particular in the 2018-2019 biennium, is too large to be absorbed simply through savings and efficiency measures. The WMO budget allocation in some priority programme areas has been causing concern since 2016. While the Secretariat has been focussing on the optimization of existing budgetary resources, the resource level of the proposed budget will put priority activities in a critical situation in 20182019, resulting simply in postponement or discontinuation of priority activities, if other sources of funding is not found for them. As stated above, the budgetary implications of the unfunded activities for the 2018-2019 biennium amount to CHF 9.4 million. The present Section highlights priority unfunded activities and downsized activities that will require the additional extrabudgetary resources in the 20182019 biennium due to the insufficient of the proposed regular budget resources. The following 2018-2019 activities will require extrabudgetary funding: WIGOS and WIS: WIS: Support CBS-led review (Resolution 65, Cg-17); Support development of XML and SWIM in support of ICAO (Res 3, Cg-17); No funding to support increased capacity development on Table Driven Code Forms (that were due to be implemented by Members before 2010). WIGOS: The acceleration of the development of GCW as an operational programme is significantly dependent on the availability of expert resources, which relates directly to funding, and this is the most significant risk to achieving the set goals; Impact in the management of OSCAR/Surface, including QC and WRC, education and training and future sustainability of WIGOS system (plus 2020). WMO Space Programme: Development and implementation of OSCAR/Space; Optimization and implementation of new data dissemination strategy. Support to regional areas for data access taking into account requirements and capacities of country members. EC-69/INF. 16.2(2), p. 9 Research Programmes: Involvement of CAS experts in key cross-cutting activities such as S/GDPFS; Research participation in cross-cutting activities related to integrated urban services and in contributing to preparing relevant documentation for Cg-18 to guide Members on best practices for urban services. WWRP: WWRP, in partnership with other international initiatives, ensures the implementation of key activities towards the seamless prediction of the Earth system from minutes to months. The activities proposed represent important contributions to WMO Members, as detailed below: The Roving Seminar & Tutorial on Verification (Training Manual on Forecast Verification) is a useful contribution to spread advanced verification methods among Members. Verification is a crucial activity in quantifying and continuously enhancing predictive skill; Support to Sand & Dust Storm activities make WMO much more visible in the context of the UN system. WMO is the only agency in the United Nations that has the technical capability to monitor, model and predict this phenomenon which is of growing importance to the arid and semi-arid regions of the world; Adequate support to the office of the Young Earth System Scientists community which has been recently established by the Argentinian Met Service, by providing assistance for travel and resources for online activities (e.g. online conference tools), to enable worldwide outreach and engagement of early career scientists and will certainly improve Member participation in WMO research activities. GAW: GAW, in partnership with other international initiatives, ensures the implementation of key activities towards the atmospheric composition observations, analysis and development of integrated products and services. The activities proposed represent important contributions to WMO Members, as detailed below: The International Global Atmospheric Chemistry (IGAC) Project facilitates atmospheric chemistry research through fostering community, building capacity, and providing leadership. GAW has long-term partnership with IGAC, in particular through support of young scientist at the biennial IGAC Open Science Conferences. GAW has a liaison status with the IGAC Steering committee. Many IGAC activities and events are held jointly with liaison organizations. Next IGAC Open Science conference takes pace in 208 and IGAC Steering Committee meetings in 2018 and 2019; Training related to atmospheric composition measurements is conducted by the only training centre: GAW Training and Education Centre (GAWTEC) in Germany. WMO, through exchange of letters, committed to continued travel support of two sessions a year while German partners cover all the other expenses related to training. As training is not part of research, the activity is marked in yellow; Currently no resources are allocated for the activities related to the Integrated Global Greenhouse Gas Information System (requested by Cg-17, Resolution 46 and EC-68, Resolution 1 and Decision 19). Implementation of IG3IS requires development of detailed implementation plans for each objective, coordination of demonstration and pilot projects and scientific meetings to foster carbon cycle science and atmospheric modelling to develop the best services; EC-69/INF. 16.2(2), p. 10 There is a need expressed by Member countries to consider low cost sensors technology for air quality measurements. Low cost sensors are promoted by UNEP but their testing by different research group in GAW shows multiple limitations. The assessment and review should be done on more systematic basis and corresponding recommendations should be provided to Members in collaboration with UNEP (Decision 20 (EC-68)); There is a need to keep WMO involved in the development of WHO global platform to ensure that the best available science provided on air quality forecasting by Member countries is integrated in the assessment products. WCRP: Due to the limited funding, WCRP will focus on CMIP6, on keeping the core projects active with very small allocations, on those activities – particularly in grand challenges – that can happen without face-to-face meetings, on the sea level meeting in NYC and on developing and supporting the communities that will produce global sea level and global energy budgets. WCRP will also sharply curtail nearly all of its model development activities outside of CMIP, cut core project activities at least by half, put regional activities basically on hold for the year, eliminate most grand challenge meetings, and reject all support requests from partner programmes. Education and Training: Additional funding is required to fully finance the requirement for fellowship, training and human resources development activities. A recently concluded survey on fellowships and training needs, to which more than 80 per cent of WMO Members responded, reveals that WMO is not able to meet even up to one third of the requests from WMO Members. Climate Applications: Climate risk management/National Climate outlook capabilities: It was planned to have regional training workshops to strengthen national capabilities in climate risk management, especially with a seasonal perspective. This support would have targeted Africa primarily but would also have been available upon request by other NMHSs. The activity is postponed sine die; Guidance material on climate data: Several foreseen activities with regard to climate change detection indices, data homogenization, data rescue will not be supported under the current budget; Regional climate outlook activities: Support to regional climate outlook needs to be reduced, especially in Asia. The Polar climate outlook that had been planned as well as the launch of the Arctic Polar Regional Climate Center will not be funded from the WMO regular budget. Guidance on RCOF practice is called off, regional training activities on indices, downscaling and indicators needs to be postponed; Global Seasonal Climate Outlook & Climate coordination: Operationalization of the Global Seasonal Climate Outlook needs to be rethought. Contributions to NAP related activities in cooperation with UNDP, UNEP and others are postponed; Water management and hydrological data: Most country NHSs focused training activities that were planned to be held with RB have been delayed indefinitely or called off. Amongst the objectives were: improvement of ADCP measurements, stream gaging course in Russian, training on low flow tools, training on MCH. WMO lacks a professional staff to support water management related developments; EC-69/INF. 16.2(2), p. 11 Review of GCOS ECV inventories: It was planned to assess the status of ECV inventories; GFCS implementation: Increased capability to develop practical implementation arrangements through the PAC and through projects. Funds were planned to speed up twinning between NMHSs & RCCs, develop bankable project proposals etc. 6. Conclusions and way forward As indicated in this document, the WMO Secretariat has progressed well in the fulfilment of the budget-actions decided by Cg-17. Concerning identification of savings and efficiency opportunities, since the last EC meeting the focus of attention has been mainly on optimization of costs in the broad administrative domain. Whilst these efforts will continue, it is expected that - with the expected availability of a budget for the biennium 2018-2019 in the new programme-based structure - the focus of this analysis will also include programme-related expenditure, with a view to better align expenditure with strategic priorities. _____________ Annex: 1 EC-69/INF. 16.2(2), p. 12 ANNEX Main elements of the programme-based budget structure Major Activity Area Theme Envelope Programme World Weather Watch Programme Observations / Information Systems Level 1 Programmes WMO Integrated Observing System (WIGOS) / Global Observing System (GOS) WMO Information System (WIS) / Global Telecommunication System (GTS) Related Level 2 Programmes Main WIGOS/GOS Activity Data Buoy Cooperation Programme (DBCP) Instruments and Methods of Observation Programme (IMOP) World Weather Watch Data Management (WWWDM) WWW System Support Activity (WWWSSA) WMO Antarctic Activities (WMOAA) WMO Polar and High Mountain Activities WCP/Global Climate Observing System (GCOS) Main GCOS Activity ClimDev Africa Global Ocean Observing System (GOOS) WMO Space Programme (WMOSP) Foundation Activities WMO Quality Management Framework (WMOQMF) (including the activity "Adopting a Quality Management approach for National Meteorological and Hydrological Services") Hydrology and Water Resources Programme (HWRP) World Weather Research Programme (WWRP) Research Global Atmosphere Watch (GAW) WCP/World Climate Research Programme (WCRP) Forecasting and Analysis Global Data-processing and Forecasting System (GDPFS) / Emergency Response Activities (ERA) World Hydrological Cycle Observing System (WHYCOS) Hydrological Information Ref. Service (INFOHYDRO) WMO Hydrological Observing System (WHOS) EC-69/INF. 16.2(2), p. 13 Voluntary Cooperation Programme (VCP) Capacity Development and Partnerships Capacity Development and Partnerships Capacity Development and Partnerships Education and Training Programme (ETRP) Education and Training Fellowship Programme Other ETRP Activity Regional Programme (RP) WMO Programme for the Least Developed Countries Programme for WMO Small Island Developing States and Member Island Territories Aeronautical Meteorological Programme (AeMP) Agricultural Meteorological Programme (AgMP) Meteorological Applications Main AgMP Activity Integrated Drought Management Programme (IDMP) World AgroMeteorological Information Service (WAMIS) Marine Meteorology and Oceanography Programme (MMOP) Disaster Risk Reduction Programme (DRRP) Tropical Cyclone Programme (TCP) Public Weather Services Programme (PWSP) (including the activities: World Weather Information Service (WWIS) and Severe Weather Information Center (SWIC)) Applications in specific areas of Weather, Climate and Hydrology Climate Applications World Climate Programme (WCP) WCP Coordination Activity WCP/World Climate Services Programme (WCSP) World Climate Applications Programme World Climate Data management Programme Global Framework for Climate Services (GFCS) Intergovernmental Panel on Climate Change (IPCC) Hydrological Applications Hydrology and Water Resources Programme (HWRP) Main HWRP Activity Hydrological Operations Multipurpose System (HOMS) Associated Programme on Flood Management (APFM) Hydrological Forecasting and Warning Services Water Resource Activities EC-69/INF. 16.2(2), p. 14 Governance Governance Governance Information and Public Affairs Programme Executive Management of the WMO Secretariat Cabinet and External Relations Strategic Planning Office Internal Oversight Office Legal Office Constituent body meetings, excluding languages services Corporate publications, excluding language services Conference Services Language Services Resource Mobilization Administration Administration Administration Planning, Budgeting and Financial Management UN System Joint Cost HR recruitment, staff services, training and administration Procurement and Travel administration Building infrastructure management IT infrastructure management Archives, document management and library services A list of seven Objects of Expenditure has been defined for use as part of the improved budget structure by consolidating the list of accounts used for financial accounting purposes. This list represents a good compromise between analytical requirements and simplicity: (a) Staff salaries and related expenditure, including staff salary costs and costs of staff entitlements (common staff costs); (b) Fellowships and training activities; (c) Operating expenses, including consultancy, external services and suppliers; (d) Meeting costs, including costs of participants’ travel; (e) Travel expenditure, capturing costs of individual mission of WMO staff; (f) Capital expenditure; (g) Sources of income other than contributions. _________
© Copyright 2026 Paperzz