CLIC rf structure production G. Riddone, BE-RF 2009.02.06 CLIC meeting, 20090206 1 Content • Structure production cycle and responsibilities • 30 GHz structures • X-band structures (CERN, KEK, SLAC) – From “mechanical design” to “ready for installation” • Master schedule • Conclusions CLIC meeting, 20090206 2 CERN structure production cycle and responsibilities RF design BE/RF Activities coordinated in mechanical design and production meetings Mechanical design BE/RF Tendering EN/MME BE/RF Decision point based on experimental results Fabrication EN/MME Preparation and Assembly TE/VAC, BE/RF CLIC meeting, 20090206 QC Dimensional control SEM EN/MME RF check BE/RF 3 KEK/SLAC structure production cycle and responsibilities RF design BE/RF Mechanical design KEK Tendering KEK Activities followed in monthly collaboration meetings Decision point based on experimental results Fabrication KEK Preparation and Assembly SLAC CLIC meeting, 20090206 QC KEK/SLAC 4 Status - 30 GHz ac. structures Ready for installation CLIC meeting, 20090206 Disks at CERN 5 Status – x-band ac. structures CLIC meeting, 20090206 6 CLIC vg1/G structures CLIC meeting, 20090206 7 C10-CD10 structures CLIC meeting, 20090206 8 Mechanical design RF INPUT ST Generated 3D Parts RF CHECK SmarTeam CLIC meeting, 20090206 3D Part Assembly Design 9 A. Samoshkin Mechanical design CLIC meeting, 20090206 D.Gudkov 10 Damped Disks machining by turning and milling • Disks: machining by diamond turning • Adding damping features Needs milling (no circular symmetry) with smooth transition between milled and turned surfaces. • Assembly by vacuum brazing (CERN) • Assembly by H2 brazing (KEK/SLAC) Accelerating structure CLIC G (undamped) Damped disks VG1 CLIC meeting, 20090206 Firms: - VDL (fully qualified) - Kugler and LT Ultra (still under qualification) - KEK/SLAC firms 11 Achieved accuracy (disk) 30 GHz [accuracy in um] 11.4 GHz [accuracy in um] Speed bump (VDL) Specified TD18_disk (VDL) Specified Achieved SA: iris shape accuracy ID: inner diameter Ra: roughness Achieved OD: outer diameter Th: iris thickness S. Atieh CLIC meeting, 20090206 12 Achieved accuracy (T18#2_KEK) T. Higo CLIC meeting, 20090206 13 Dimensional control (TD18) TD18 (VDL) 4 mm CLIC meeting, 20090206 14 From VDL dimensional report Assembly by brazing Before brazing Holes/grooves for brazing After brazing After brazing , ready for RF check CLIC meeting, 20090206 15 Assembly by brazing SB, 813 ˚C, 20’ Tx18: 815 ˚C, 20‘ 790 ˚C, 2 h CLIC meeting, 20090206 16 Assembly by bonding and alignment verification (SLAC) - Bonding of the disks - Brazing of the couplers - Brazing of the tuning studs 04.12.2008 17 Tuning by hammering Test set-up for tuning (SLAC) Disks with tuning studs CLIC meeting, 20090206 18 T18_disk_CERN (1/3) Following the bad test results of the T18_disk CERN a “Task Force” has been set-up to understand the cause and to define the actions for the future structures. History reconstruction and comparison to other structures have been made structure from Kugler with several NCs, cleaning procedure different from the old X-band structure, brazing design different from old X-band structure The structure was sent back to CERN last week. RF check, cutting and inspection (agreed procedure) will be then performed Corrective actions have been defined in case of confirmation of brazing problem CLIC meeting, 20090206 19 T18_disk_CERN (2/3) - History Fabrication NC (ID, OD) Different than old x-band procedure 3 brazing cycles (low pressure, disk flatness) Mismatch output matching cell CLIC meeting, 20090206 20 T18_disk_CERN 3/3 - Comparison CLIC meeting, 20090206 21 Updated at the monthly collaboration meetings CLIC meeting, 20090206 MASTER SCHEDULE (1/2) 22 MASTER SCHEDULE (2/2) CLIC meeting, 20090206 23 Future accelerating structures Name [#] Material Prototype Motivation Design Fabricated by Re-build a good structure C10_vg1.35 2 Cu OFE Reference structure New CD10_vg1.35_WDS (1.16) 2 Cu OFE Brazing, tuning, leak tightness tests 5 disks Damping New CD10_vg1.35_Choke 2 Cu OFE Brazing, tuning, leak tightness tests 5 disks New damping New CD10 _vg1.32_WDS 2 Cu OFE Lower DT New C10_vg1.35_milled 2 Cu OFE Milling vs turning New CD10_vg1.35_WDS 2 CuZr brazing tests on simple samples Harder material Existing CD10_vg1.35_WDS 2 Glidcop brazing tests on simple samples Harder material Existing CD10_vg1.35_WDS 2 Cu OFS brazing tests on simple samples Harder material Existing T18_disk (SLAC/KEK) design Cu OFE TD25_vg1.8_cc 2 Cu OFE (KEK)) Alternative solution KEK CLIC G damping material 2 Cu OFE Final design @ 12 GHz New 500 GeV – 502 WDS 2 Cu OFE Prototype New CLIC meeting, 20090206 PSI 24 Conclusions • Fabrication: at present VDL is the best firm, it is the only one which is fully reliable 8-9 weeks for the TD18 or TD24 big effort to qualify new firms • T18: waiting for cutting and inspection results • T24: if the T18 problem comes from brazing, machining of the disk can be done at CERN • TD18: on hold until the problem on T18 is fully understood (few iterations may be necessary) • T24 - TD24 (both at 11.4 and 12 GHz) under fabrication • T24 and TD24 also made at KEK/SLAC • CD10 structures: tendering for prototype disks • Decision to build at CERN T18_disk with same design, Cu material and assembly methods as KEK/SLAC CLIC meeting, 20090206 25 Extra slides CLIC meeting, 20090206 26 SPEED BUMP T18_disk_CERN 2 mm 30 mm gap Bea m axis 80 mm CLIC meeting, 20090206 27 TD18_disk_CERN CLIC meeting, 20090206 28 T18_disk_KEK A. Samoshkin CLIC meeting, 20090206 30
© Copyright 2026 Paperzz