Attaining Cost Efficiency In Constructing Sports Facilities For Beijing 2008 Olympic Games By Use Of Operations Simulation Wah-Ho Chan, Ming Lu Jian-Ping Zhang Dept. Of Civil and Structural Engineering Dept. Of Civil Engineering Hong Kong Polytechnic University Beijing, China Hong Kong, China Presented By: Vinh H. Truong Purpose Of The Simulation Evaluating Construction Time Construction Operations Installation Sequences Varied Schedules For Assembling Cost Efficiency In Building The Structure Construction Steel Pieces Hauled In Assembly Two 600-Ton Cranes Inner Ring Two 800-Ton Cranes Outer Ring 24 Steel Columns 86 Steel Frames Work Flow Model Column/Frame Subassembly Reference Code Column Or Frame Real Number Representing Work Content and Complexity, Used For Adjusting Assembling and Installation Duration Installation Destination Zone 0 = Frame, 1 = Column Structural Complexity Index Short ID Code Of The Steel Component 1 Or 2 Representing The Installation Zone Installation Sequence Index Smaller Value = Higher Priority For Processing Activity Duration Summary SDESA Simplified Discrete-Event Simulation Approach Research Led By Ming Lu Easy-To-Apply, Cost-Effective Methods Of Artificial Intelligence And Computer Simulations For Construction Engineering And Project Management SDESA SDESA Results Base Areas 4,5,6 – Start Areas 1,2,3,7 – 50 Days Later Areas 8,9 – 100 Days Later Crash Accelerate The Concrete Construction Alternative Areas 1,2,3 – Start Areas 4,5,6,7 – 50 Days Results Questions?
© Copyright 2025 Paperzz