GNSS for INnovative Road Applications WP3.2.2 GINA Trials execution Trials execution Status 8th June 2010 Brussels Introduction MAIN ITEMS: WP3.2.2 trials execution currently ongoing Exhaustive Trials Campaing concluded (both GMV & Navteq vehicles) Exhaustive Trials analysis phase ongoing GMV vehicle data preliminary results Navteq vehicle data ready for analysis End2End trials SW development and integration concluded End2End trials OBEs production & installation currently ongoing after initial delays Enforcement trials expected to be carried out once end2end trials are running AENOR trials arrangments to be finished, final dates for the test (Summer 2010) to be concluded soon Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 2 GNSS for Innovative road Applications logo Exhaustive Trials definition Exhaustive Trials Concept 1. GNSS OBU 2. GNSS Reference System 3. Evaluation Routes 4. Geobjects Definition GINA EXHAUSTIVE TRIALS: Evaluation of GNSS system peformance in terms of Position performance, Distance calculation performance, geo-objects detection performance and charging performance Different configurations to be tested for results comparison GNSS GNSS + EGNOS (SISNET) GNSS + CANBUS GNSS + CANBUS + EGNOS (SISNET) Two different vehicles operated by different Companies (GMV & Navteq) Use of different defined geobjects with different definitions to test OBU performance One vehicle subject to pre planned challenging routes (GMV) and other vehicle following its daily routes (Navteq) Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 3 GNSS for Innovative road Applications logo Exhaustive Trials Status GMV Vehicle Navteq Vehicle Trial campaign succesfully concluded in April 2010 Navteq Trial campaing succesfully concluded June 2010 Data from the OBU and reference system collected and processed OBU and Reference system Data to be handed out by Navteq Processed Data analysed and first set of results evaluated OBU and Reference data to be processed as in GMV vehicle Second analysis phase to introduce corrections and fine tunning Analysis phase for Navteq Data to take place after GMV analysis ends Evaluation Report and related results deliverable expected to start after 2nd evaluation Navteq results to be included together with GMV vehicle in the evaluation Report GINA: Evaluacion de Sistemas GNSS/GALILEO en el marco de aplicaciones EFC/RUC. Procedimiento, Metodologia y Resultados Company’s 11/05/2010 Page 4 GNSS for Innovative road Applications logo End2End Trials definition 1 EFC System Architecture 2 GINA end2end Trials Architecture Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 5 GNSS for Innovative road Applications logo End2End Trials RUC Centre FEATURES: User Interface & services communications through web applications Billing Generator Module Compliant with Netherlands EFC scheme requiriments (i.e privacy) Report and charges generation user profiles information and modification Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 6 GNSS for Innovative road Applications logo RUC Service Centre Status Billing Module fully operative End user interface operative Additional functionalities may be developed to provide additional information, e.g. Geographical objects map Publish table of tariffs Users log into the system anonymously with the device number of their vehicle Definition of charging schemes and tariffs ongoing Integration test with VAS Module ready Company’s GINA Trials Execution 29/07/2017 Page 7 GNSS for Innovative road Applications logo End2End trials VAS Platform RITA Reports online with test data at: http://194.79.89.182/Gina/ The following features already functional and integrated – General Traffic Information • Displays the zones, total Kms and average speed for all OBU IDs between a given time interval – Total vehicles by speed interval • Displays the vehicle count across a series of speed intervals for a given time interval – Traffic statistics by date • Displays the total amount of – Traffic statistics by zone Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 8 GNSS for Innovative road Applications logo End2End trials VAS Platform Status General Traffic Information Total Vehicles per speed interval Traffic Statistics By Date Traffic Statistics By Zone Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 9 GNSS for Innovative road Applications logo E2E trials VAS Platform RITA providing PAYD per vehicle details in central system. Company’s PRESENTATION TITLE VERDANA (9) 29/07/2017 Page 10 GNSS for Innovative road Applications logo End2End Trials OBUs GPRS communications provision Mobile Phone Operator Selection – Vodafone NL 110 SIM Cards Provided up to December 2010 OBUs – Service Centre communications tested and operational January 2010 February 2010 ARVAL selected companies contact volunteer drivers Final Drivers and vehicle models list and locations arranged December 2009 March 2010 100 OBES Bill of Material reception finished completely 100 OBEs production and reception in GMV finished OBEs GINA FW Integration and Testing almost finished April 2010 May 2010 June 2010 Contract signed December 2009 Volunteer Drivers enlistment OBEs Production OBEs Installation ARVAL Related companies contact started September 2009 OBEs Shipment to the Netherlands process started May 2010 (40 units) Volunteers drivers appointments for installation ongoing June 2010 (ARVAL volunteers) OBEs Installed & running in the Netherlands June 2010 EVENTS: OBEs materials provision delays and uncompliant materials produced a big delay in the process start Installations appointments and material shipments had to be rescheduled thus increasing the final delay Process already started and expected to be finished without any more setbacks Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 11 GNSS for Innovative road Applications logo Geo-Objects Definition GP4 GP5 GP1 GP0 GP2 GP3 GINA GEOBJECTS: Use of different geobjects classes in order to check OBU geobject recognition performance Different classes Different geobjects definition methodology Different sizes for same geobjects Different sub sets of geobjects for the different trials End2end trials geobjects GMV exhaustive trials geobjects Navteq exhaustive trials geobjects Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 12 GNSS for Innovative road Applications logo Geo-Objects Definition Status Exhaustive Trials Geobjects End2End Trials Geobjects Status: Status: Exhaustive geobjects definition closed End2End geobjects definition closed GMV exhaustive trial geobjects Navteq exhaustive trials geobjects End2end geobjects placed around strategic locations GMV exhaustive geobjects defined volunteers likely routes 51 different geobjects main roads Entry/Exit points Segments (Higway and urban) Cordon / Charging areas Postal codes areas 3 locations 20+ geobjects defined Amsterdam The Hague Rotterdam Segments (Higways) Different legal definitions and methodologies Geobjects x1, x2, x4 Charging Areas Nijmegen Navteq exhaustive Geobjects defined Utrecht Cordons & entry/exit points (crossings) Adapted to navteq vehicle routes X geobjects defined Rotterdam The Hague Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 13 GNSS for Innovative road Applications logo Enforcement trials status ITEMS: Enforcement Trials expected to take place after end2end trials kickoff Date: July 2010 Place: not decided yet Enforcement Trials will be split in two different phases OBU – Enforcement Platform communication testing (Remote) Enforcement live trials involving OBU & ANPR systems 1 OBU will be installed in a test vehicle Test vehicle will drive around the area of the ANPR system ANPR will trigger the central system into asking the OBU Company’s PRESENTATION TITLE VERDANA (9) 29/07/2017 Page 14 GNSS for Innovative road Applications logo ASCENDI (AENOR) trials status Specification and development in progress 1. Fleet Management • • GIS Map with real-time vehicle positioning Ready for test 2. Incident Management • • Automatic detection of time taken from incident detection to arrival on site. Under development 3. Contract obligations enforcement • • Provide reports with information regarding specific sites and times monitored per day Under development 4. Reports • Current version under review by ASCENDI Specification details under discussion with ASCENDI for 2 and 3 ¿? Date and location ¿? Company’s PRESENTATION TITLE VERDANA (9) 7/29/2017 Page 15 GNSS for Innovative road Applications logo ASCENDI (AENOR) Trials VEHICLE TRACKING Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 16 GNSS for Innovative road Applications logo ASCENDI (AENOR) trials Fleet Management Report Incident Management Report Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 17 GNSS for Innovative road Applications logo ASCENDI (AENOR) trials Contract Obligations Enforcement Reports Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 18 GNSS for Innovative road Applications logo Next Steps & Open Points Open Points Actions Needed - GMV Exhaustive trials results analysis Review 1st analysis results (DATE) Fine Tune results (DATE) Prepare evaluation Report (DATE) - Navteq Exhaustive trials results analysis Collect Navteq vehicle data (DATE) Process data results (DATE) Evaluate and compare results (DATE) - End2End Trials Campaign Start Ship all the remaining OBUs (DATE) Finish installations for the 100 OBUs (DATE) Start data collection process - End2End Trials Platform Introduce charging schemes & tariffs (DATE) Feed real data into the platform - Enforcement Trial definition Carry out Enforcement Communication Trials (DATE) Carry out Enforcement Live Trials (DATE) - AENOR Trials End definition phase together with ASCENDI (DATE) Carry out defined tests (DATE) Company’s PM#4 WP3.2.2 GINA Trials Execution 08/06/2010 Page 19 GNSS for Innovative road Applications logo Thank you
© Copyright 2025 Paperzz