PAGE 1 of 6 DATE DOCUMENT CASE OFFICER E-MAIL 17 April 2013 13/19381-1 Per Bundgaard Øster [email protected] GUIDANCE: ROAD SAFETY AUDIT 1. PURPOSE The purpose of this guidance is to describe how and when road safety audits shall be carried out in the construction and operation of minor and major facilities. 2. ACTIVITY DIAGRAMME AND ORGANISATION Employer (B) Commission Audit steps Basis Designer (P) Review (R) Inspection Review Reporting Report Clarifying meeting Response (P) Decision (B) Completion (R) THEME PROCESS TASK Road engineering Road project Road safety audit Auditor (R) PAGE 2 of 6 3. DESCRIPTION Activity Road safety audits The RS (“Road Safety”) audits are carried out in accordance with the principles of the handbook Road Safety Audit and Inspection, December 2011. Furthermore, the RS audits of projects on European highways are carried out in accordance with the Executive Order on the Administration of the Fafety of Road Infrastructure. Responsibility Minor facilities PL Major facilities • FPL road (phases 3-5) • PL (phase 6) The RS audits may be carried out by the Danish Road Directorate's own road safety auditors or other auditors who are named on the auditor list; that is available on http://vejregler.lovportaler.dk. Audit of the projects on European highways are carried out with participation of at least one person who is certified to carry out road safety audits, see the executive order. Organisation For minor facilities, the three parties of a RS audit are defined as: Employer: AD-VEST-MA Designer: Consultant or AD-PV-DES Auditor: The independent person(s) who examine the project. For major facilities, the three parties of a RS audit are defined as: Employer: AD-OEST or AD-VEST Designer: Consultant or AD-PV-DES Auditor: The independent person(s) who examine the project. For large facilities, FPL-VEJ acts on behalf of the Employer in phases 3 and 4 for RS audits if a consultant is in charge of the design. For turnkey contracts, the RS audit will typically be part of the Contractor's services. In this case, the three parties of the RS audit are defined as: Employer: Danish Road Directorate Designer: Contractor Auditor: The independent person(s) of the Contractor's agency who examine the project. The Danish Road Directorate shall approve the auditor. Audit steps, minor facilities Minor and medium-sized projects shall be reviewed at steps 2, 3 and 4 in accordance with the table below. Audits at steps 1 and 5 are optional*. PL PAGE 3 of 6 Activity Responsibility Phase (small facilities) 1 Program phase (PLA) 2 Proposal phase (PLA) 3 Project phase 4 5 Construction phase Project completion phase Audit steps 1 (optional)** 2 2 (optional) 3 4 5 (optional)* * Projects on European highways shall be reviewed at steps 2, 3, 4 and 5, see the executive order. The audit at step 1 is optional. ** Black spot projects and grey sections are always reviewed in the programme phase. Audit steps, major facilities Phases 3-5 FPL-VEJ Large projects shall be reviewed at all steps 1-5 and in all phases in accordance with the below table. Phase (major facilities) 1 Preliminary surveys (PLA) 2 EIA surveys (PLA) 3 Project for inspection 4 Project for construction 5 Facilities 6 Guarantee Phase 6 PL Audit steps 1 2 2* 3 4 5 * Step 2 audits shall be carried out prior to line inspections as well as detailed inspections. The RS audit prior to the detailed inspection is referred to as supplementary step 2 audit. Commission For minor facilities, the commission of RS audits can be done by PL or the designer. It is PL's responsibility that the RS audit will be carried out, but it may be agreed with the designer that the initiative lies with him. If PL is doing the commissioning, the designer shall be informed so that PL will know what has been submitted for audit. If the RS audit is part of the service of a consultancy agreement, the (counsellor's) designer shall do the commission on its own initiative. The Employer shall be informed of the commission. For major facilities, it is FPL who will commission the RS audit in phases 3, 4 and 5. PL commissions the RS audit in phase 6. If the RS audit is a part of the service of a consultancy agreement or turnkey contract, the designer himself shall do the commission. The Employer shall be informed of the commission. For the commission, it shall be clearly stated who each party is and with whom the auditor is communicating. Minor facilities PL Major facilities • FPL-VEJ (phases 3-5) • PL (phase 6) PAGE 4 of 6 Activity It shall be agreed with the auditor if the audit basis is to be submitted as PDF files or/and on paper. Responsibility Instructions are attached to the commission. Audit basis, step 2 (conceptual design) The commissioning body collects and submits the audit basis to the auditor. The documents shall include: • Brief project specification, including project changes since the last audit • Project assumptions, including planning speed and design speed* • Comments from relevant authorities (municipality, police, transport authority etc.) • Traffic and accident data • Comprehensive plan • Note regarding general directions and principles for road markings** • Plans with road markings** • Signal project (programme phase) • Longitudinal profiles • Normal cross section • Copy of previous RS audits Minor facilities PL Major facilities FPL-VEJ * For major facilities, it may be an advantage to gather project assumptions in a Project basis which contains provisions from the construction act, cross sections, speeds and design vehicles etc. A summary table is being prepared as a schedule and will contain information about existing and future cross sections and speeds for the main section and all other affected roads. ** If a conceptual design is not being prepared for road markings for the step 2 audit, the principles should be stated in a note, e.g. referring to similar projects or sketches from the handbooks. For major facilities, the documents shall be sent to the auditor no later than immediately following the transfer of the inspection project to AD-AG so that the designer will have time to incorporate any project changes before the inspection. Audit basis, step 3 (detailed design) The commissioning body collects and submits the audit basis to the auditor. The documents shall include: • • • • • • • • • • Brief project specification, including project changes since the last audit Project assumptions, including planning speed and design speed Comments from relevant authorities (municipality, police, transport authority etc.) Traffic and accident data Comprehensive plan Plans (stating superelevation of curves) Plans – road markings Longitudinal profiles Normal cross section Plans – road furniture (safety barriers, fences, noise barriers etc.) Minor facilities PL Major facilities FPL-VEJ PAGE 5 of 6 Activity • Planting plans • Plans for direction (road signs and direction, position and indication signs) • Street lighting plans • Signal project • Copy of previous RS audits Responsibility * For large installations, Project basis from phase 3 will be updated. Detailed designs submitted for road safety audit shall always include line and marking plans. For minor facilities, the documents shall be submitted to the auditor at least one month before the tender notice so that the designer will have time to incorporate any project changes before the tender notice or as amendment sheets during the tender period which is at least 3 weeks for tenders according to the Danish Tender Act. For major facilities, the documents shall be submitted to the auditor no later than immediately following the publication of the tender notice. The tender period for tender notice according to the Public Procurement Directive is at least 35 calendar days for restrictive tendering and at least 40 calendar days for open tendering. It is important that the auditor can review the entire project even though it will be offered in various contracts over time. Inspection Auditor Inspection at the site shall be carried out for RS audits at steps 2-5. Additional inspections can be carried out using net-based image programmes, e.g. Google Street View. Inspections for RS audits steps 4 and 5 shall be carried out in daylight as well as in the dark. Clarifying meeting Auditor For RS audits at steps 2 and 3, a clarifying meeting will generally be held between the auditor and the designer where the first draft for the audit report will be reviewed. Reporting The auditor submits the quality assured audit report to the commissioning body who will submit a copy to the third party in the road safety audit. The designer will prepare a response for the audit report where all issues and proposed solutions will be considered. 1. The Employer acknowledges the issue and a. the auditor's proposed solution will be adhered to, or b. an alternative proposal will be prepared to resolve the issue 2. The Employer rejects the issue, and the project is not changed. PAGE 6 of 6 Activity The designer's response and the Employer's decision (in case of disagreement) may be written into the audit report under each issue/observation. Responsibility The commissioning body submits the audit report with the designer's response and the Employer's decision to the auditor. The auditor can then finalise the audit. 4. DEFINITIONS Overview of abbreviations: PL FPL-VEJ AD-VEST-MA AD-OEST AD-VEST AD-PV-DES AD-AG The Danish Road Directorate's project manager. Located in one of the 3 project offices. The Danish Road Directorate's specialist project managers for the road project. Located in AD-PV-DES Facility West – Minor facility Facility East – Minor facility Facility West Project and road technology (P&V) Area and Geodata 5. DOCUMENT CONTROL APPROVED DATE Mian April 2013 April 2013 /June 2014/ corrections with organisational change/bhof UNIT/NETWORK THEME Road geometry Road and traffic aspects SCHEDULED AUDIT April 2015 ACCESS Internal External
© Copyright 2026 Paperzz