Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu December 18, 2009 1 1. Initial Results of GEO-GEO Comparison for GOES-14 PLT Purpose: Confirm that GOES-14 measurements are comparable with those currently operational (GOES-11/12) to ensure operation continuity. Method: Collect the collocated data by both GEOs along a narrow strip (~40 km) in the middle of the two to minimize difference due to viewing geometry. Data: Along 120W for GOES-11/14, 90W for GOES-12/14, 0-50N, every 30 minutes, 2009/12/01 to 2010/01/05. Analysis: This analysis presents comparison of two channels for GOES-12/14 on Dec 16, when GOES-14 emulated GOES-12. 2 GOES14 – GOES12 Imager Visible Channel 3 GOES14 – GOES12 Imager 3.9 m Channel 4 Preliminary Results All channels of GOES-14 Imager are comparable with the counterparts of GOES-11/12. Most of the observed differences are likely due to residual BRDF effects. Further QC is needed for comparison. No instrument issue has been identified. More results, including Sounder, will follow. 5 2. Initial Bias Evaluation of GOES-14 IR Channels Purpose: Methods: Verify GOES-14 Imager and Sounder IR channel calibration. Establish benchmark for future intercalibration. GSICS GEO-LEO Inter-Calibration (Wu et al 2009). GOES-14 Imager spectral response functions and the simulated AIRS/IASI spectra Data GOES Imager IR data, AIRS/IASI data since Oct. 28, 2009 GOES Sounder and IASI data between Nov. 30, 2009-Dec. 13, 2009 GOES-14 Imager (upper) and Sounder (lower) spectral response functions and the simulated AIRS/IASI spectra 6 2.1 GOES-14 Imager vs AIRS/IASI -1.28 K -1.15 K +0.96 K +0.95 K +1.01 K -0.06 K +0.17 K +0.16 K -0.08 K -0.54 K -0.51 K -0.03 K • More at http://www.star.nesdis.noaa.gov/smcd/spb/fwu/homepage/GSICS_GOES14_AIRS_IASI.php • Large difference for 3.8 m channel may be due to the BRDF of solar reflection • Large bias (1 K) for water vapor channel • Unusually large and unstable bias for Ch. 10.7 m in November • Smaller bias (-0.5K) for 13.3 m channel 7 2.2 GOES-14 Sounder vs IASI Ch. # *: IASI does not cover this channel fully Channel GOES – IASI (homo. Scene # <84) RGEO a b * RIASI a b Tb (K) stdv (K) 1 14.71µm 1.240(±0.777) 0.976(±0.019) 0.263 0.177 2 14.37µm 1.244(±0.412) 0.972(±0.010) 0.159 0.236 3 14.06µm -0.249(±0.300) 1.001(±0.006) 0.178 0.425 4 13.64µm 0.230(±0.258) 0.998(±0.004) 0.307 0.652 5 13.37µm 0.206(±0.305) 0.996(±0.005) 0.211 0.853 6 12.66µm 0.345(±0.301) 0.993(±0.004) 0.187 1.310 7 12.02µm 0.3459±0.287) 0.991(±0.004) 0.00 1.138 8 11.03µm 0.269(±0.243) 0.993(±0.004) -0.048 0.935 9 9.71µm 0.108(±0.099) 0.998(±0.004) 0.162 0.613 10 7.43µm 0.005(±0.05) 0.999(±0.004) -0.047 0.448 11 7.02µm 0.031(±0.038) 0.992(±0.005) -0.185 0.389 12 6.51µm 0.036(±0.024) 0.980(±0.008) -0.144 0.348 13 4.57µm 0.0002(±0.001) 1.012(±0.004) 0.214 0.364 14 4.52µm -0.0009(±0.001) 0.9997(±0.004) -0.031 0.287 15 4.45µm -0.0007(±0.001) 1.027(±0.007) 0.214 0.364 16 4.13µm -0.002(±0.006) 1.004(±0.004) -0.031 0.287 17 3.98µm -0.0039(±0.0005) 1.013(±0.004) -0.223 0.549 18* 3.74µm -0.011(±0.001) 12.01 0.837 1.949(±0.008) Much less bias for SW channels 8 3. Initial Noise Evaluation of GOES-14 IR Channels Purpose: Methods: Standard deviation of space looks. Standard deviation of blackbody looks will follow. Data Confirm compliance of instrument spec. Establish benchmark for future Instrument Performance Monitoring. 11/30 – 12/14 Analysis: Mean noises are presented. Agree with CIMSS results. Detailed analysis will follow. 9 Preliminary Results Initial Evaluation of GOES-14 Bias 160 140 120 NEdT (mK) 100 80 60 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Channel (Sounder & Imager+20) 10 4. GOES-14 Instrument Performance Monitoring Purpose: Plot telemetry data at various time scales Data SPLK for GOES-14 Imager visible channel Methods: Detect/Confirm instrument performance anomaly. Diagnose for root cause Verify efficacy of resolution GVAR Block 11. Analysis: Zero space count for Imager visible channel noon to midnight – space look side? More at http://www.star.nesdis.noaa.gov/smcd/spb/fwu /homepage/GOES14_Imager_IPM.php 11
© Copyright 2026 Paperzz