TFMM priorities within the EMEP workplan (2014-2015)

Progress in EMEP 2016-2017 workplan:
Measurements and modelling
TFMM co-chairs: A. Colette & O. Tarasova
Extended Bureaux EMEP & WGE, Geneva March 21th 2017
Workplan 2016-2017:
1.1 « Improving tools »
#
Topic
Deliverable Status
1.1.1.2
Trends analysis of air
concentrations and
deposition based on
monitoring data and
model results
Report
• Joint TFMM/CCC/MSCE/MSC-W report Published
in May 2016
• Ongoing analysis of
Eurodelta-Trends
Workplan 2016-2017:
1.1 « Improving tools »
#
Topic
Deliverabl
e
Status
1.1.1.3
Finalize the model
intercomparison analysis of
the Eurodelta3 exercise (EMEP
campaigns and trend modelling)
Report
Peer review
articles
•
•
Report published
2 papers published in 2016, 1
in prep
Vivanco et al. AE 2016
Bessagnet et al., ACP 2016
Workplan 2016-2017:
1.1 « Improving tools »
#
Topic
1.1.1.4
Review of existing twin urban
Scoping
and remote supersites to assess document
the contribution of LRT to urban
AP
Linkages with local-scale air
pollution strategies (IAM)
1.1.3.1
PMF
Deliverab
le
Status
•
•
•
In progress: Case studies for
(ES, UK, SE, CH, FR)
Link with modelled
increments (GAINS,
SHERPA/FAIRMODE, CAMS)
GAW local sites
Workplan 2016-2017:
1.1 « Improving tools »
#
Topic
Deliverabl Status
e
1.1.1.7
Setup a contact group between
EMEP and WGE to compare
WGE exposure measurements
and modelled and monitored
exposures by EMEP
Joint
meetings
•
•
Eurodelta focus on deposition
& PODy
TFMM participation at WHO
Global AQ Platform
TFMM Trend Report
Theobald et al. In prep
Workplan 2016-2017:
1.1 « Improving tools »
#
Topic
Deliverabl
e
Status
1.1.1.21
1.1.2.1
Review of the actual role of
condensables and of their
impacts on the evaluation of
current and future emissions
control strategies
Workshop
Report
Emissions
GL
•
•
•
Working Group
Joint Workshop TFEIP/TFMM
May 2016
Scientific Position Paper
Denier van der Gon et al. ACP 2014
Workplan 2016-2017:
1.2 « Cooperation with parties »
#
Topic
Deliverable
Status
1.2.1
Maintain a high quality level in
chemical analyses related to
EMEP observations in general and
in regions with inadequate
monitoring activities
Workshop
•
Held in fall 2016 (CCC)
Workplan 2016-2017:
1.2 « Cooperation with parties »
#
Topic
Deliverable
Status
1.2.2
Arrange POP measurement
campaign including laboratory
and field intercomparison of POP
analysis
measurement
campaign
•
Performed in Summer 2016
Workplan 2016-2017:
1.2 « Cooperation with parties »
#
Topic
Deliverable
Status
1.2.3
Arrange intensive
measurement campaign in
collaboration with ACTRIS-2
project
measurement
campaign
•
Options discussed at 2016 TFMM
(offline ACSM aerosol
characterization focused on
Eastern Europe), to be agreed at
2017 TFMM meeting
Workplan 2016-2017:
1.2 « Cooperation with parties »
#
Topic
Deliverable
Status
1.2.4
Assessment of HM and POP
pollution levels with fine spatial
resolution generated in cooperation
with national experts
Report
•
10
•
UK rural background sites
Modelled_10x10
FRAME_5x5 km
Observed
6
4
2
UK32
UK31
UK19
UK14
UK13
UK11
UK12
UK09
UK08
UK03
UK02
0
UK01
Concentration in air, ng/m3
8
MSC-E, TFMM 2016 Meeting
Belarus (Pb) Czech Republic (POP),
Poland (Cd) and United Kingdom (Pb)
presented at 2016 TFMM meeting
Ongoing studies for France (POP and
HM) and Spain (POP)
Workplan 2016-2017:
1.3 « Cooperation with other projects and bodies »
#
Topic
Expected
Status
1.3.4
Explore options for
cooperation between
EMEP and
Copernicus
Atmosphere Monitoring
Service (CAMS)
Report to
EMEP/WGE
•
Ongoing, mainly monitoring, but also twin sites city
allocations
1.3.5
AQ Assessment in
newly industrialized
countries
Report to EMEP SB
•
pending
Summary

2016-2017 Workplan

Main achievements

2018-2019 Workplan

New actions

Trends

Revised Monitoring Strategy

HM&POP case studies


Twin Sites
Field Campaign, possibly PM
characterization in Eastern Europe

Condensables

Follow-up

Trends (model/measurement
agreement, effects modelling)

Condensable (Implement the results
of the TFEIP Questionnaire)

Effect modelling/observations (WGE)

Twin Sites / Link with Local AQ

HM&POPs case studies