MACOSNAR CORPORATION List of Security Equipment Ship Name IMO No No. 1 Place of Audit Date of Audit □ SHIP SECURITY ALERT SYSTEM (SSAS) Installed: Yes □ □ No Plan of installation is Verified Yes Expected Date of Installation ___________ Installed in accordance with SOLAS Chapter XI-2, Regulation 6 Equipment is in operational condition Yes Yes Equipment is maintanied in accordance with the system requirements Yes □ □ □ No No □ Date of Installation ________ _______ □ □ Installation is approved by ________ _____ □ No □ No Manufacturer MCO Maritime Security Auditor Additional information (signature) No. 2 CONTINUOUS SYNOPSIS RECORD (CSR) □ Implemented: Yes Implemented in accordance with SOLAS Chapter XI1, Regulation 5 CSR is maintained in accordance with System requirements Yes □ □ Administration is informed in case CSR has been amended Yes □ Yes □ No□ □ No □ No No Date of Implementation ___________ ____ CSR issued by: __________ _____ □ MCO Maritime Security Auditor Additional information (signature) No. 3 SHIP IDENTIFICATION NUMBER □ □ No □ Yes □ No □ Marked: Yes Plan of marking is verified Expected Date of Marking ______ _____ Marked in accordance with SOLAS Chapter XI-1, Regulation 3 Yes □ No □ Maintained in accordance with system requirements Yes □ No □ Date of Marking __________ _____ Approved by: ___________ _____ Compliance is confirmed by:________ ____ Manufacturer Additional information MCO Maritime Security Auditor (signature) MCO-ISPS-LE-DOC Rev: 01 20-02-2013 Page 1 de 2 No. 4 AUTOMATIC IDENTIFICATION SYSTEM (AIS) □ Yes Plan of Installation is Verified Expected Date of Installation □ Installed: Yes _______ No □ □ No Date of Installation ________ _______ □ ________ Intalled in accordance with SOLAS Chapter V, Regulation 19.2 Yes Equipment is in operational condition Equipment is maintanied in accordance with the system requirements Yes Yes □ □ □ No □ Installation is approved by _________ ______ □ No □ No The compliance is confirmed by: ________ _______ Manufacturer MCO Maritime Security Auditor Additional information (signature) NO. 5 NAME: Plan Installation Verified Expected Date of Installation Installed in accordance with Equipment is in operational condition Equipment is maintanied in accordance with the system requirements Installed: Yes □ No □ Yes □ No □ ________ Yes Yes Yes Date of Installation __________ _____ _______ □ □ □ No □ Installation is approved by __________ _ □ No □ No Manufacturer MCO Maritime Security Auditor Additional information (signature) NO. 6 NAME: Plan Installation Verified Expected Date of Installation Installed in accordance with Equipment is in operational condition Equipment is maintanied in accordance with the system requirements Installed: Yes □ No □ Yes □ No □ _________ Yes Yes Yes Date of Installation _________ ______ ______ □ □ □ □ No □ No □ No Installation is approved by _________ _______ Manufacturer Additional information MCO Maritime Security Auditor (signature) MCO-ISPS-LE-DOC Rev: 01 20-02-2013 Page 2 de 2
© Copyright 2026 Paperzz