PowerPoint bemutató

CMS exhibition area with LHC
objects in SDX5 (3578 R-A11)
1. Plans & measures
2. Pictures
3. Questions
4. Possible ideas to “steal” from SM18
1. Plan of bldg 3578
Future exhibition area
Entrance to the
electricity storage
~5 m
Ethernet sockets and
power plugs are
already installed at
the corner
(Ethernet socket
number 1024/01
and 1024/02)
~7.5 m
Visits
F
a
c
e
s
o
f
C
M
S
Floor height
difference is ~20 cm
CMS model
To the
Access to future
SL53 (new building)
To the CMS CR
2. Pictures
View from the visitors’ passage
View from inside
Need to
measure the
height of that
wall
Entrance to the electricity room
View from the entrance of the new
building
3. Questions
• Will the floor leveling continue in this room? / Slope in floor leveling?
~20cm difference in the
floor level between the
visitors passage and the
“room”
• Is the fence going to put back?
• Access to the electricity room (3578 R-403): how often used? Possible
transport of big objects?
• How much traffic will get this room when the new building will be built?
• The need of a surveillance camera.
4. Possible ideas to “steal” from SM18
• Posters
• Animations (CMS would have all 4 on 1 touch
screen)
… this part needs to be finished… (more in v2)