CMS exhibition area with LHC objects in SDX5 (3578 R-A11) 1. Plans & measures 2. Pictures 3. Questions 4. Possible ideas to “steal” from SM18 1. Plan of bldg 3578 Future exhibition area Entrance to the electricity storage ~5 m Ethernet sockets and power plugs are already installed at the corner (Ethernet socket number 1024/01 and 1024/02) ~7.5 m Visits F a c e s o f C M S Floor height difference is ~20 cm CMS model To the Access to future SL53 (new building) To the CMS CR 2. Pictures View from the visitors’ passage View from inside Need to measure the height of that wall Entrance to the electricity room View from the entrance of the new building 3. Questions • Will the floor leveling continue in this room? / Slope in floor leveling? ~20cm difference in the floor level between the visitors passage and the “room” • Is the fence going to put back? • Access to the electricity room (3578 R-403): how often used? Possible transport of big objects? • How much traffic will get this room when the new building will be built? • The need of a surveillance camera. 4. Possible ideas to “steal” from SM18 • Posters • Animations (CMS would have all 4 on 1 touch screen) … this part needs to be finished… (more in v2)
© Copyright 2025 Paperzz