2016 STORMWATER UTILITY ANNUAL REPORT May 9, 2017 Background This annual report is being submitted in accordance with Section 13.26.120 of the Milton Municipal Code which requires that “The Director of Public Works shall conduct an annual review of the utility’s operations, the total costs of operation and maintenance of the stormwater retention, detention, collection and conveyance systems, and the schedule of rates and charges. The director shall submit an annual report to the mayor and city council…summarizing the review and containing any recommendations for rate adjustments…” Stormwater Planning The stormwater Capital Improvement Program (CIP) is a component of the Stormwater Comprehensive Plan, the last update of which was adopted in 2005. At Council’s direction, the CIP was updated with the goal of re-evaluating the City’s stormwater concerns, providing current construction costs, and developing a schedule for implementation of identified projects. The stormwater CIP has been updated to reflect decisions made as part of the 2016 budget process and to more accurately reflect which projects will be prioritized going forward. This document will be reviewed annually as part of the City’s annual CIP update. 2016 Financial Results Based on the 2016 Fourth Quarter Financial Status Report, the Stormwater Utility Operating fund revenues totaled $917,095. The operating expenditure balance was $793,827. Operating revenues exceeded operating expenditures by $123,268. The operations fund started the year with a beginning balance of $833,402. Operating transfers-out were made totaling $149,930 to the Storm/Capital Fund, and an $27,134 to the Asset Replacement Fund. There was also debt service in the amount of $32,463. Total expenditures for the Storm Water Operations Fund were $970,891 and the 2016 ending fund balance is $779,606 which includes $242,723 designated as Reserved Fund Balance per City Ordinance (#1874-15) (25% of current year operating expenditures). The Stormwater Capital Fund revenues for 2016 totaled $196,334. These revenues consist of a transfer from the Stormwater Utility operating fund, state and federal funding and a small amount of investment earnings. The beginning balance was $767,023 and the current fund balance is $296,062. There are Grant reimbursements expected in 2017 for construction that occurred 2016. For purposes of illustration, the chart below reflects combined data of the Stormwater Operating and the Capital funds. For 2016, the total revenue was $1,113,430 and total expenses were $1,461,122. Page 1 of 5 Graph 1 - Total SW Fund Revenue and Expenditures over time Expenditures were up in 2016 as construction and storm improvements were ramped up reflecting our commitment to use the utility to improve the city’s drainage and water quality. This is also reflected below in the declining overall fund balance. Graph 2 – Total Fund Balance and Capital Transfers over time Although we spent a fair amount of City money on improvements, we had some help from the Department of Ecology, as well. In 2016, the City received $41,049 from four Department of Ecology grants, with much more to come during 2017 (much of the reimbursement for the Emerald Street Page 2 of 5 bioretention and pervious parking lot projects came after the first of the year). One of the grants was a routine capacity grant which aids with expenses incurred as part of our continuing compliance with the National Pollutant Discharge Elimination System, the next was for design work being performed on the future decant facility, and the other two for our LID Retrofit Projects which were constructed in 2016. 2016 Maintenance Efforts In 2016, approximately 175 catch basins were cleaned utilizing the City’s new vactor truck. Money was set aside in the budget to achieve some long-standing goals for the stormwater department including comprehensive catch basin cleaning and ditch/culvert maintenance. Meeting Ecology’s requirements while keeping our stormwater collection system maintained to the highest standards possible is the shared goal. 2017 Financial Outlook The stormwater utility operations and capital improvement funds have anticipated revenues of $1,679,100 and anticipated expenses of $2,135,117. The projected ending fund balance for stormwater after 2017 is projected to be $1,326,926. 2017 Capital Improvement Outlook Six separate Stormwater Capital Improvement Projects have been identified and budgeted for in 2017. See table 1 below. Table 1 – 2017 CIP Projects and Schedule Ecology Grant Design 2017 Taylor Street Drainage Improvements X 11th Street Pipe Installation X Decant Facility X Construction 2017 X X Land Acquisition (if needed) City Wide Ditch/Culvert Project X Misc. Storm Replacements X Page 3 of 5 2017 Maintenance Plan It is the goal of all involved to have a proactive culture that preemptively solves problems as well as being able to competently respond to unforeseen ones. To stay in compliance with our National Pollutant Discharge Elimination System Phase II permit, we have many obligations and goals. One of those goals is to have every catch basin inspected by August 31 st, 2017. In 2014, a large-scale effort was mounted and 210 catch basins, or approximately 25% of them, were inspected and, if deemed necessary, cleaned in the month of September. In 2016, another 22% were inspected and serviced. The resources have been assembled to finish this requirement by the imposed deadline. Another mandated goal from Ecology is that 40% of the Municipal Separate Stormwater System – MS4 (including pipes, catch basins and facilities) be screened by December 31st, 2017 and then 12% on average each subsequent year. It is the goal of this department to integrate the screening, inspection, cleaning programs to make the most efficient use of staff time and resources while performing quality work. National Pollutant Elimination System (NPDES) Phase II In 2006, the Public Works Department established the position of Storm Water Compliance Inspector to ensure that all development in the City of Milton complies with the most current version of the Department of Ecology Stormwater Manual for Western Washington and the City’s NPDES permit. The City of Milton’s National Pollutant Discharge Elimination System Phase II (NPDES) permit was officially issued on January 17, 2007. The City is currently in compliance with all requirements of its NPDES permit. A new and updated NPDES permit is anticipated to be issued in 2018. Stormwater Grants / Loans Capital Improvement Programs (CIP) are intended to improve flooding and potential overflow conditions. The most current comprehensive CIP for storm, adopted in February of 2011, identifies ten needed capital improvement projects of which 1 have been completed (Kent St. Detention Pond) and at least 2 more have the potential to be funded by grants. See Table 2 below. Page 4 of 5 Table 2 – 2011 Adopted CIP Estimated Cost (2011 $) Eligible for Grant Completed X Kent Street Detention Pond $209,000 11th Ave Pipe Installation $226,000 Taylor Street Drainage Improvements $303,000 Oak St. & 17th Ave– Re-route stormwater $576,000 Xavier and 14th Ave – Install pipes to alleviate low spots $268,000 Surprise Lake Outfall $270,000 Milton Way & Yuma St. – Pipe flow to Yuma St. $699,000 Emerald St. – Replace 12-inch culverts $164,000 5th Ave. – Replace culverts (pipes) w/box culvert $404,000 X City Center storm project $300,000 X In design In 2016 the City, working with grants from the Department of Ecology, constructed two pervious concrete parking lots on city property and had bio-retention cells and bio swales constructed along Emerald St between 10th and 14th Ave. Both projects have been completed and the grant process and funding is wrapping up in the early part of 2017. Our current grant agreements are for the City of Milton Decant Facility (currently in design phase) and our bi-annual capacity grant. The amount of the capacity grant depends on the State budget and amounts will be known around July 1st. The City has received capacity grants in various amounts from the Department of Ecology for seven consecutive years to assist with implementation of the City’s NPDES permit. These funds have been utilized for education and outreach programs, purchasing equipment for stormwater monitoring, modeling, new stormwater regulations, and staff time. Recommendations Staff recently completed an audit of the stormwater utility by evaluating accounts and performing site visits. Accounts were properly adjusted and created as required. It is recommended, based on satisfactory revenues and auditing of current billing, that the current storm water utility rate matrix is adequate. Page 5 of 5
© Copyright 2025 Paperzz