PRESENTATIONS IN NETWORK MANAGEMENT Economic Evaluations Saad Haj Bakry, PhD, CEng, FIEE Saad Haj Bakry, PhD, CEng, FIEE 1 Economic Evaluations Objectives / Contents Background in Economics Cost / Expenditures Benefits / Revenues Saad Haj Bakry, PhD, CEng, FIEE 2 Economic Evaluations Background in Economics Basic Principles Cost & Benefits Change of Value Evaluation Methods Saad Haj Bakry, PhD, CEng, FIEE 3 Economic Evaluations Basic Principles Symbol Factor Criteria C Cost / “Cost Reduction” Expenditures (maintaining requirements / management) B E t Benefits / “Maximizing Benefits” Revenues (efficient use / charging policy) Cost-Effectiveness: E=B/C time Saad Haj Bakry, PhD, CEng, FIEE Investigation time scale. Break-Even time: E = 1. Optimum Life: Maximum E 4 Economic Evaluations Types of Cost / Benefits Issue Type Explanation Estimation Problem Tangible Can be quantified directly and assigned a monetary value: e.g. cost of equipment. InTangible Difficult to quantify and given monetary value: e.g. staff frustration Recurring Continue to occur through the life of the project: e.g. maintenance cost NonRecurring Usually occur at the beginning of the project life and do not occur again: e.g. initial investment. Operation / Time Saad Haj Bakry, PhD, CEng, FIEE 5 Economic Evaluations Change of Value (with Time) Factor Explanation Reference t = 0 Reference time (year) for the Time / Year evaluation of real worth values Proportional Effect of “inflation” Change of Effect of “borrowing” Value Combined Effects: “discount rate” V(t 1) V(t) Change: (positive or v(t) V(t) negative) v(t) Real Worth v(t) = v Saad Haj Bakry, PhD, CEng, FIEE RV(t) = V(t) / (1+v)t 6 Economic Evaluations Evaluations: Cash Flow 100 50 Cost Benefits 0 -50 -100 -150 -200 -250 -300 Year (0) Year (2) Year (4) Saad Haj Bakry, PhD, CEng, FIEE Year (6) Year (8) Year (10) Year (12) Year (14) 7 Economic Evaluations Evaluations: Investment State 150 100 50 0 -50 -100 -150 -200 -250 -300 Year (0) Year (2) Saad Haj Bakry, PhD, CEng, FIEE Year (4) Year (6) Year (8) Year (10) Year (12) Year (14) 8 Economic Evaluations Evaluations: Efficiency 1.4 1.2 Efficiency 1 0.8 0.6 0.4 0.2 0 Year (1) Year (3) Saad Haj Bakry, PhD, CEng, FIEE Year (5) Year (7) Year (9) Year (11) Year (13) Year (15) 9 Economic Evaluations Cost / Expenditures Network Structure Place Staff Network Operation Cost Management / Policy Saad Haj Bakry, PhD, CEng, FIEE 10 Economic Evaluations Network Structure Consulting: Planning (Legal, Technical,..) / Design Access / Services Sub network: Communications Sub network: Access Points Servers Communications Switches Channels Installation / Testing Saad Haj Bakry, PhD, CEng, FIEE Capacity / BW = Cost 11 Economic Evaluations Place / Staff Land Building Offices / Furniture Training Salaries Lighting Air-Conditioning Other Staff Benefits Water Cooling Saad Haj Bakry, PhD, CEng, FIEE 12 Economic Evaluations Network Operation Monitoring & Control Preventive Maintenance Help-Desk: Fault Repair Cost of Other Management Functions… Saad Haj Bakry, PhD, CEng, FIEE 13 Economic Evaluations Cost Management / Policy Contracts / SLAs: Service Level Agreements Distribution of Cost / Criteria Cost Reduction / Resource Sharing Saad Haj Bakry, PhD, CEng, FIEE 14 Economic Evaluations Service Level Agreements: SLAs Users: Associated with Different Internal Department Internal SLAs Internal IT Department: Computer Services / Intranet External SLAs Resources Suppliers Saad Haj Bakry, PhD, CEng, FIEE Services Providers 15 Economic Evaluations Cost Distribution: Organization Intranet Centralized • Cost is paid by “top management” • Top level “overheads” Distributed • Cost is distributed among the departments of the organization • “Distribution Criteria is needed. Saad Haj Bakry, PhD, CEng, FIEE 16 Economic Evaluations Cost Distribution: Criteria Criteria Description Shares Cost is distributed according to specified weights of shares Size Cost is distributed according to size: “employees” / “space”.. Cost is distributed according to “profit” or “loss” Profit Use Saad Haj Bakry, PhD, CEng, FIEE Cost is distributed according to traffic “generation” / “flow” 17 Economic Evaluations Cost Reduction Equipment: Buy / Lease / Rent Operation / Maintenance / Staff: Considering SLAs Balancing Demands and Resources Saad Haj Bakry, PhD, CEng, FIEE (Specialized Companies) Sharing Resources 18 Economic Evaluations Sharing Resources Advantages: Cost Sharing Less Cost per Department Capacity Utilization Cost Effectiveness Examples: • Long Distance Channels • Management Software • Information Services • Staff Problems: Increased Management Complexity / Control & Security / Performance Level Saad Haj Bakry, PhD, CEng, FIEE 19 Economic Evaluations Benefits / Revenues Dimensions of Benefits Saad Haj Bakry, PhD, CEng, FIEE Management Of Revenues 20 Economic Evaluations Dimensions of Benefits PROPER UTILIZATION Time Saving Time Increasing Productivity Geography Saving Movement Saving Space Form: Enhancing Quality / Supporting Management Efficiency / Better Security Saad Haj Bakry, PhD, CEng, FIEE 21 Economic Evaluations Management of Revenues Tariff Policy Services Competitiveness Busy Period Issues Management Cost v. Revenues Public Services of Non-Urban Areas Future Development: Cost of Expansion / Upgrading / Replacement Saad Haj Bakry, PhD, CEng, FIEE 22 Economic Evaluations Conclusions Efficient Management Evaluations: Use of Economic Principles Interaction Cost / Expenditures Time / Progress Saad Haj Bakry, PhD, CEng, FIEE Benefits / Revenues 23 Economic Evaluations References General Network Planning, ITU-T Telecommunications Management: Operation & Management of Networks, National Computing Centre (NCC) Training, UK. R. Jamal-Aldeen, S.H. Bakry, A. Nouh, “Analysis of the cost-effectiveness of information networks with applications”, International Journal of Network Management, Vol. 100, No. 2, pp.91-101, March / April 2000. Saad Haj Bakry, PhD, CEng, FIEE 24
© Copyright 2026 Paperzz