“Have U Heard” Round Table Colombo Round Table 1 RT Austria AGM Vienna for Kids in Need Thank You for Hearing Us Austria !! Table Table 1 26 2 28 4 29 6 31 11 33 12 34 15 37 17 39 18 41 19 42 25 48 Your Support Made us come close to Their Dream …………………. November 2009 The World Is Hearing us Today Round Table International Recognizes the Project “Have U Heard” Moreover this project is the first ever Project in Sri Lanka to be received a Round Table International Presidents award of Euro 2500 http://www.roundtable.name/ Shaping Up Expenses Incurred Thus far Currency in Euros Land Cost 25,100 Earth Filling 1,000 Building Temporary Pre-School 1,657 Building the Retention wall 3,052 Construction up to ground floor 4,193 Concrete slab (roof level of ground floor) *12,916 * Includes Funds form RTA and RTI --------------Excluding the land cost 47,918 ========= They also incur a monthly overhead cost of Approximately - Euro 322 Projected Expenses in Need Currency in Euros Concrete slab upwards (First Floor) ◦ ◦ ◦ ◦ ◦ Structural work Plumbing and sanitary fittings Electrical wiring Doors and windows Painting and Decorating ◦ 5% cost escalation * As per the BOQ Provided 22,874 1,897 2,580 1,470 1,554 2,165 --------------32,577 ======== Equipment for the Audiology Center Currency in Euros Ear mold fabrication Clinical Audiometer Play Audiometer Accu. Screen (Screening of Newborn Babies) 5% cost escalation 4,232 6,432 4,614 4,437 985 --------------20,700 ======== With the proposed center there will also be an monthly overhead of approximately Euro 350 What Round Table can do ? Fund 53,000 Euros 1. Audiology laboratory Auditorium 32,577 (Euro) 2. A well equipped Audiology lab : 20,700 (Euro) To measure hearing and obtain audiograms Material & equipment to fabricate Ear molds Equipment & material to repair hearing aids Trained personnel Thank you !
© Copyright 2026 Paperzz