Modular Construction Research - Measure H – Bond To Upgrade

SONOMA COUNTY JUNIOR COLLEGE DISTRICT
Measure H update for the Governing Board
April 11, 2017
Capital Projects Purchasing Items
• California Environmental Quality Act
•
•
•
•
Dudek (Encinitas, CA)
GHD (Santa Rosa, CA)
LSA Associates, Inc. (Berkeley, CA)
Rincon Consultants, Inc. (Ventura, CA)
• Bid Award Items:
• Lark Temporaries – Permission to bid and award if bid is below $700,000
• Analy Village Swing Space Project – Permission to bid and award if bid is
below $500,000
• Both projects support the Burbank Swing Space project and will be utilized as
swing space for later projects
Measure H – Recent Activity
• Citizen’s Bond Oversight Committee (CBOC) Meeting
• Monday, April 10, 2017
• New Projects Update
• STEM lab planning phase
• KAD programming phase
• Modular construction research
STEM Lab Planner – Research Facility Design
• Programming for STEM project highlights
• Santa Rosa & Petaluma Chemistry Lab coordination
• Four (4) sets of meetings with STEM faculty from various departments
• Samples of Work Product
• Organic Chemistry Lab – Concept options A through C (not final)
STEM Lab Planner: Research Facility Design
• Selected by Measure H selection committee consisting of:
•
•
•
•
•
1 student
1 board member
2 faculty
2 classified staff
2 managers
• Programming for STEM project highlights:
• Meetings with STEM faculty from various departments
• Coordination between SR Chemistry Labs & Petaluma Chemistry Lab
SAMPLE ONLY
STEM Lab Planner: Research Facility Design
• Selected by Measure H selection committee consisting of:
•
•
•
•
•
1 student
1 board member
2 faculty
2 classified staff
2 managers
• Programming for STEM project highlights:
• Meetings with STEM faculty from various departments
• Coordination between SR Chemistry Labs & Petaluma Chemistry Lab
SAMPLE ONLY
STEM Lab Planner: Research Facility Design
• Selected by Measure H selection committee consisting of:
•
•
•
•
•
1 student
1 board member
2 faculty
2 classified staff
2 managers
• Programming for STEM project highlights:
• Meetings with STEM faculty from various departments
• Coordination between SR Chemistry Labs & Petaluma Chemistry Lab
SAMPLE ONLY
KAD Field Planner – Verde Design
• Exterior field planning for KAD programming
• Track layout
• Pool program (including new 50 – 52m pool)
• Fieldturf replacement in multi-field area
• Coordination with KAD building program
• Programming services – Gensler
• Cost estimate for programming phase – Establish priorities
• Building architect selection using Measure H process – Summer
• Samples of Work Product
• Field and pool concept diagrams (not final)
KAD Field Planner: Verde Design
• Specialty Planner for KAD exterior fields
•
•
•
•
Recommend design for track layout
Recommend design for multi-purpose field renovation
Recommend strategy for pool areas, including 50 – 52 meter pool
Recommend strategy for Fieldturf replacement
• Work will be coordinated with KAD building programmer
• Gensler selected to program KAD facility
• Architect selection process will commence in summer with Measure H
committee
• Project
delivery method in discussion
SAMPLE
ONLY
• Cost estimate at end of process will establish priorities
KAD Field Planner: Verde Design
• Specialty Planner for KAD exterior fields
•
•
•
•
Recommend design for track layout
Recommend design for multi-purpose field renovation
Recommend strategy for pool areas, including 50 – 52 meter pool
Recommend strategy for Fieldturf replacement
• Work will be coordinated with KAD building programmer
• Gensler selected to program KAD facility
• Architect selection process will commence in summer with Measure H
committee
• Project
delivery method in discussion
SAMPLE
ONLY
• Cost estimate at end of process will establish priorities
Modular Construction – Product Research
• Intent of the study – does modular construction…
…include one and two story options?
…deliver schedule and/or cost savings?
…come with a DSA pre-approval stamp?
…meet the District’s interior & exterior design quality standard?
• Modular is not appropriate for all projects, but is there a place for modular
construction in the Measure H program? Possible options:
•
•
•
•
SW Center – Classrooms and Student Services?
PSTC – Multi-purpose Room?
Shone Farm – Laboratory or Classroom?
Santa Rosa – Classroom building (interior of campus only) or long term swing space?
• Samples of Work Product
• Team is reviewing multiple vendors and products
Modular Construction Research
• Intent of the study – modular construction:
•
•
•
•
Schedule and cost savings
Many products come with DSA pre-approval stamp
Meets classroom & exterior design quality standard at each site
Research includes one and two story options
• Are appropriate solutions available?
•
•
•
•
•
SW Center – Possible classroom solution
PSTC – Possible solution for MPR
Shone Farm – Possible solution for laboratory and classroom
Santa Rosa – Possible solution for building on interiorSAMPLE
of campus only
ONLY
Santa Rosa – Possible solution for long term swing space
Modular Construction Research
• Intent of the study – modular construction:
•
•
•
•
Schedule and cost savings
Many products come with DSA pre-approval stamp
Meets classroom & exterior design quality standard at each site
Research includes one and two story options
• Are appropriate solutions available?
•
•
•
•
•
SW Center – Possible classroom solution
PSTC – Possible solution for MPR
Shone Farm – Possible solution for laboratory and classroom
Santa Rosa – Possible solution for building on interiorSAMPLE
of campus only
ONLY
Santa Rosa – Possible solution for long term swing space
Modular Construction Research
SAMPLE ONLY
Modular Construction Research
• Intent of the study – modular construction:
•
•
•
•
Schedule and cost savings
Many products come with DSA pre-approval stamp
Meets classroom & exterior design quality standard at each site
Research includes one and two story options
• Are appropriate solutions available?
•
•
•
•
•
SW Center – Possible classroom solution
PSTC – Possible solution for MPR
Shone Farm – Possible solution for laboratory and classroom
Santa Rosa – Possible solution for building on interiorSAMPLE
of campus only
ONLY
Santa Rosa – Possible solution for long term swing space
QUESTIONS?