Set up device in the work space Load the syringes into the syringe pumps Insert syringe plunger in the slot Place syringes here Connect the syringes to the microchannel Arrows depict the tubing connecting the syringes to the microchannel Note: The microchannel device will be round and the model will be modified to account for this Connect the microchannel to the exit reservoirs Arrows depict the tubing connecting the microchannel to the 15 mL centrifuge tubes (not shown) Note: The microchannel device will be round and the model will be modified to account for this Set the voltage and frequency Used to display the voltage and frequency Used to change the voltage and frequency Note: More displays and interfaces will be needed in the final model. Set the flow rate Used to change the flow rate, will need a display Note: More displays and interfaces will be needed in the final model. Start the sorting process Press button to start the process Observe fluid travel and check for leaks Note: Brief description of what's going on in the microchannel Note: Arrows depict fluid flow Press the emergency switch if any error occurs Operator’s Manual Key Topics • Cover Page • Table of Contents • Terms and Definitions • Operation • • • • • Creating a Microchannel Setting the Voltage and Frequency Setting the Flow Rate Loading and Unloading the Microchannel into the Device Filling the Syringe Key Topics cont. • Operation cont. • Loading and Unloading the Syringe in the Syringe Pump • Digital Microscope Usage • Full Run • Cleaning • Microchannel Cleaning • Device Cleaning • General Cleaning • Safety • References Engineering Drawings
© Copyright 2026 Paperzz