File Number: 02901014A Dustset 2020 Concentrate Road Trials Confidential Information 1 File Number: 02900927A Comparison of diluted 2020 concentrate with water on rural light traffic road surface Graded road with no prior water or dust suppressant treatment. Approximately 6 metres treated with single application of Dustset 2020 concentrate diluted 1/1000 on left and water alone on right Confidential Information 2 File Number: 02900927A Profile cut to observe depth penetration of water and product Confidential Information 3 File Number: 02900927A Road Surface 10 mm Penetration level Base of cut Water Test 10mm penetration , 5 minutes after application Confidential Information 4 File Number: 02900927A Road Surface 20mm Penetration level Base of cut Diluted 2020 Concentrate Test 20mm penetration, 5 minutes after application Confidential Information 5 File Number: 02900927A Trial Newstan – Grauches Dam Road 2 OCT – Loading dose 3 OCT – AM & PM loading dose 4‐6 OCT – no treatment Road treatment: 7 OCT – loading dose 9‐11 OCT – maintenance dose 12‐14 OCT – no treatment 15 OCT ‐ penetration profile photos Confidential Information 6 File Number: 02900927A Water versus 2020 Concentrate on treated test road Dry road – bottom of photo Water – middle of photo. Profile dug 5min after application 2020 concentrate 1/1000 – top of photo. Profile dug 5 min after application Note: All measurements taken with ruler pictured in photo Confidential Information 7 File Number: 02900927A Dry treated test road Shows some evidence of consolidation with the top layer clumping as seen in the photos. Note: there was no treatment with product for 3 days, so this indicates a residual effect. Confidential Information 8 File Number: 02900927A Road Surface 20mm Penetration level Base of cut Water on treated test road 20mm penetration, 5minutes after application 2 litres water delivered (by watering can) onto dry road surface over 5 metres. Again showed evidence of residue and consolidation of the fine dust particles Confidential Information 9 File Number: 02900927A Road Surface 30mm Penetration level Base of cut 2020 Concentrate diluted 30mm penetration, 5 minutes after application (full depth of profile cut) 2 litres 2020 diluted 1/1000 in water delivered (by watering can) onto dry road surface over 5 metres. Again showed evidence of residue and consolidation of the fine dust particles. The depth penetration was greater which is consistent with 1980’s data on original product. Confidential Information 10 File Number: 02900927A Consolidating Smaller particles clumping into larger mass Confidential Information 11 File Number: 02900927A Consolidating When squeezed in hand, Dustset treated particles seem pliable, can be moulded into different shapes, this holds the surface together and helps consolidation Confidential Information 12 File Number: 02900927A Residual product Top Left – road treated with water only Top Right – road treated with Dustset 2020 1/1000 dilution (No fine particles on rock surfaces due product surface tension reduction ‐ rocks appear cleaner) Bottom ‐ When water applied to dry road, there was some evidence of residual product shown by the bubbles around the rocks (this photo from Newstan). Confidential Information 13 File Number: 02900927A Conclusion When Dustset 2020 concentrate is applied consistently, firstly with loading dose and then maintenance dosing, improvement in not only dust control but also consolidation of the road surface will be shown with greater penetration the longer the continual use of product. Site conditions should be taken into consideration when calculating dosage amount. Possible increase dose (to loading dose) with periods of prolonged high wind or hot conditions; or if there has been extended periods where the product is not used continually. Confidential Information 14
© Copyright 2026 Paperzz