ENGINEERING CHANGE REQUEST
CMS-Totem Precision Proton Spectrometer
Upgrade Project: Timing detectors
BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S):
The CMS-Totem Precision Proton Spectrometer (CT-PPS) Upgrade Project Proposal [1][2]
foresees the installation of additional horizontal Roman Pots (RPs) between the existing
RP units at 215 and 220 m from IP5. These new RPs, intended to house time-of-flight
detectors for elastically or diffractively scattered protons, have been designed in
cylindrical geometry minimising the beam impedance and offering enough space for 12
cm long Cerenkov detectors, one of the technologies being explored for the time
measurement.
This ECR elaborates on the technical details of the new CT-PPS timing detectors and its
associated infrastructure (electronics, cables, etc). The RP elements and their integration
in the LHC has already been approved in a separate ECR [4].
The lifetime of this upgrade project is foreseen to last until LS3.
PREPARED BY:
CHECKED BY:
APPROVED BY:
DISTRIBUTION LIST: LMC members
Note: When approved, an Engineering Change Request becomes an Engineering Change Order.
This document is uncontrolled when printed. Check the EDMS to verify that this is the correct version before use.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 2 of 9
SUMMARY OF ACTIONS TO BE UNDERTAKEN:



Install the infrastructure necessary to the CT-PPS timing detector operation
Install detector packages in the RPs.
1. APPROVED SITUATION AFTER THE RP UPGRADE
The layout of the LHC cells 6L5 and 6R5 between the quadrupoles Q5 and Q6 after
completion of the already approved consolidation programme [4] is shown in Figure 1
for sector 4-5 and Figure 2 for sector 5-6. Items existing before LS1 are shown in
grey, whereas items relocated within the consolidation and upgrade programme are
shown in yellow. The new collimator TCL-6 [5] is shown in pink. Beam pipe elements
produced for the relocation are indicated in green.
Figure 1: Situation between Q5 and Q6 in sector 4-5 after upgrade [4].
Figure 2: Situation between Q5 and Q6 in sector 5-6 after consolidation [4].
2. REASON FOR THE CHANGES
As explained in the CT-PPS Technical Design Report, the exploration of low-crosssection processes implies Roman Pot operation at high luminosities and hence requires
the resolution of event pileup and identification of the vertex of the primary
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 3 of 9
interaction. This can be accomplished by measuring the time of flight of leading
protons with a precision of a few tens of picoseconds to resolve the longitudinal event
vertex position and thus to attribute the protons to the correct vertices given by the
central CMS detectors. The time-of-flight measurement will be realised by timing
detectors to be installed in additional RPs between the existing units of the 220 m RP
station. These new RPs have been designed in cylindrical geometry to provide enough
space for 12 cm long Cerenkov counters, one of the timing detector technologies
presently being explored.
3. DESCRIPTION OF THE TIMING DETECTORS AND ASSOCIATED
ELECTRONICS
A schematic drawing of the components associated to the timing detector upgrade
project is shown in Figure 3. The individual components for one arm are listed below.
Two arms, one on each side of the CMS interaction point IP5, are instrumented.
Figure 3: A schematic drawing of the timing detector CT-PPS project and its associated components. The
cyan shaded area (top) includes the components inside of the RP; the light brown (bottom) and the
“reference timing box” below those located in the close proximity of the RP; the pink boxes (labelled
“power supplies”) correspond to components in the nearest tunnel alcove.
3.1 ROMAN POTS
The new timing detectors are hosted inside the new cylindrical Roman Pots, RPs (Fig.
4). One RP is located on each side of IP5.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
VALIDITY
1.0
RELEASED
Page 4 of 9
Be
Figure 4: 3D model of the new cylindrical RP mounted on the vacuum flange. The ferrite ring (brown) is
held in place by a spring ring (left); Cut through a 3D model of the new cylindrical RP inserted into the
new vacuum chamber (right).
3.2 QUARTIC DETECTORS
Figure 5 (left) shows the L-shaped quartz bars of one Quartic module. Each module is
composed of a 4x5 array of quartz bars. There are two modules in-line inside each RP.
Two assembled modules, including the front-end electronics is shown in Fig. 5 (right).
Figure 5: One Quartic module, with the 4x5 array of L-shaped quartz bars. The beam is entering from the
left (left); two assembled Quartic modules, including the front-end electronics (right).
3.3 SILICON PHOTOMULTIPLIERS (SIPMS) AND SIPM SUPPORT BOARD
The 20 quartz bars are pushed against 20 silicon photomultipliers (SiPMs) and are held
in place on a SiPM support board that provides the electrical connection to the frontend electronics. The SiPM (Hamamatsu, model MPPC S12572-050) is shown in Fig. 6
(left), and the SiPM support board is shown in Fig. 6 (right). The SiPMs are operated
at a voltage of approximately 80V.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 5 of 9
Figure 6: One SiPM (Hamamatsu, model MPPC S12572-050) (left); SiPM support board (right).
The Quartic modules, the SiPM support board, and the front-end electronics are held
in place by a mechanical structure shown in Fig. 7.
Figure 7: Schematic drawing of the support for the two Quartic modules.
3.4 NINO BOARD: AMPLIFIER-DISCRIMINATOR
The NINO board (Fig. 8) is located inside the RP and it is directly connected to the
SiPM support board from which it receives the signals. Each board hosts 1 NINO ASIC
that amplifies and discriminates the input signals; each ASIC has 32 channels. There
are two NINO boards inside each RP, one for each Quartic module. The power
dissipated by the two NINO boards inside the RPs is 2 W.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 6 of 9
Figure 8: Picture of the front and back of the NINO board.
3.5 FEEDTHROUGH BOARD
The feed-through board closes the RP and it secures the secondary vacuum to be
kept. It hosts the electrical connections between the components inside and those
outside the RP. There is one feed-through board for each RP.
This board has yet to be produced.
3.6 RP READOUT BOX
The RP readout box is located in the close proximity of the RPs and it contains the
control and digitization boards. The RP readout box hosts the components that
connect the control and data transfer to the CMS Underground Service Cavern (USC).
Figure 9 shows a schematic drawing (and dimensions) and the location foreseen for
the installation in the LHC tunnel.
Figure 9: Schematic drawing of the RP readout box (left); Picture of the location (inside the blue
rectangle) foreseen for the installation of the RP readout box (right). (FIGURES TO BE REDONE). ADD
PICTURES (WITH DIMENSIONS) OF LOCATION FOR INSTALLATION.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 7 of 9
3.7 DIGITIZER: MOTHERBOARD AND MEZZANINE BOARD
The motherboard (Fig.11, left) and the mezzanine board (Fig.11, right) are used
together to digitize the input discriminated signals out of the NINO board and provide
a time-to-digital conversion of those signals. One mezzanine board hosts 4 HPTDC
ASICs (each has 8 channels) that are controlled by one FPGA on the motherboard.
An alternative SAMPIC mezzanine board (to be used in place of the HPTDC mezzanine
board described above) may be used instead.
The mezzanine board is mounted on the motherboard, and they are located inside the
RP readout box. One pair (one motherboard and one mezzanine board) is used to
read-out one Quartic module. There are two pairs in the RP readout box.
The digitizer motherboard also provides LV power and control (I2C) to the NINO
boards.
The boards are currently in production.
Figure 11: Pictures of the motherboard (left) and mezzanine board (right). FIGURES TO BE REDONE.
3.8 SIPM CONTROL BOARD
The SiPM control board (Fig. 12) is located in the close proximity of the RP, and more
precisely inside the RP readout box. The SiPM control board provides the bias voltages
to the individual SiPMs (through an on-board 8V-to-100V converter), allows the
monitoring of temperature, humidity, and SiPM leakage currents. It is controlled by
the Digitizer board (see Section 3.7).
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 8 of 9
Figure 12: Picture of the SiPM control board.
3.9 LV POWER SUPPLIES AND MARATHON POWER SUPPLY
The low voltage (LV) power is supplied by a Marathon power supply located in the
Alcove closest to the RP position. Four separate LV power supply channels are needed.
The digitizer board requires 3 separate LV power supplies: 2 Volts, 5 Volts (for the
analog part), 5 Volts (for the digital part). The SiPM control board requires 8 Volts.
The number of LV power supplies needed is listed in Table 1.
Power cables from the Marathon to the RP position are already in place (installed
previously by TOTEM). The cables have the reference xxxx (to be confirmed).
Table 1: Summary of LV power supplies needed.
3.10 OPTICAL LINKS
The digitizer board allows the data transfer and control between the CMS Trigger/DAQ
system located in the CMS Underground Service Cavern (USC), level S2, and the RP.
Optical links are used for this purpose. The fibers are bundled in groups of twelve. A
total of three fiber bundles are used for each arm. One bundle is used for
sending/receiving the controls; two bundles are used for sending the data, one from
the HPTDC and the other from the SAMPIC mezzanine boards, respectively.
The needed single mode fiber bundles are already in place (installed previously by
TOTEM). The fiber bundles have the reference xxxx.
REFERENCE
LHC-XRP-EC-0011
EDMS NO.
1361537
REV.
1.0
VALIDITY
RELEASED
Page 9 of 9
Table 2: Summary of the optical links needed.
3.11 DETECTOR CONTROL SYSTEM
Additionally to the slow control provided by the Digitizer Board and its interface to
central CMS, the timing RP is equipped with pressure, temperature, and radiation
monitoring sensors readout via the TOTEM DCS system already in place.
3.12 GROUNDING
All electrical components are to be grounded to… (WHAT IS THE STANDARD? SHOULD
ALL BE GROUNDED TO THE SAME GROUNDING AS CMS? OR WILL ALL BE GROUNDED
TO THE RP CHASSIS AND LHC TUNNEL?). THIS NEEDS TO BE CHECKED/DETERMINED.
REFERENCES
[1]
[2]
[3]
[4]
[5]
CMS-TOTEM Precision Proton Spectrometer Upgrade Proposal, CERN-LHCC-2014-021
Scope and implementation plan of the CT-PPS baseline program, CERN-LHCC-2014026
TOTEM Upgrade Proposal, CERN-LHCC-2013-009; LHCC-P-007.
TOTEM Consolidation Project, LHC-XRP-EC-0010, EDMS 1314925.
S. Redaelli et al., Infrastructure Installation for Physics Debris Absorbers (TCL) on both
sides of IP1 and IP5 in front of Q6 Quadrupole, LHC-LJ-EC-0033, EDMS 1283867.