HYDROCARE Activities of PP1 -CINFAI Valerio Lucarini, PhD [email protected] Overview (from AF) Institution PP 1 LP National Consortium of Universities for the Physics of the Atmospheres and of the Hydrospheres EU Member State Country (Y/N) (Code) Y IT Total financial contribution 478.100,00 PP1/LP is responsible for 5 actions (1.1, 1.2, 2.4, 2.5, 5.1) and for 2 WPs (WP1 and WP5), participates also to WP2 Main Objectives Coordination and management of the technical/administrative goals of the project (payment claims, reporting, assemblies of partners). (WP1) Reconstruction of the hydrological cycle in the CADSES area by renalyses, local models, global models. (WP2) Dissemination by publications and conferences of the technical/administrative goals attained, and related training (WP5). Work Package 1 – Action 1.1 Month of start (mm/yy) Month of end (mm/yy) 01/2006 12/2007 Continuous coordination ad Notes and reports management of the project to/from partners performed by the Lead and European Partner: check of the technical bodies. status of the project, contacts with the European bodies (especially JTS) and with the PP representatives. Organization of the meetings of the Assembly of Partners and of the Managing Committee. People: Description of activities, components, means Expected output / deliverables Costs (in €) 64.700,00 Valerio Lucarini (TD), Veronica Benedettelli (ATD)+ Carmelo Grasso, Donato Di Camillo, Janka Strakova (Staff) Work Package 1 – Action 1.2 Month of start (mm/yy) Month of end (mm/yy) 01/2006 12/2007 Organization and management Transmission of the of the administrative invoices and proofs aspects of the project: of expenditures to basic administrative the Managing duties, definition of the Authority. terms of joint convention, Redistribution of check of the financial the ERDF status of the project, contributions to the financial flux partners. management, contacts with the Managing and Payment Authorities. People: Description of activities, components, means Expected output / deliverables Costs (in €) 86.400,00 Carmelo Grasso, Donato Di Camillo, Janka Strakova (Staff) Work Package 2 – Action 2.4 Month of start (mm/yy) Month of end (mm/yy) 01/2006 12/2007 Reconstruction of the large- Quantitative scale hydrological cycle in characterization at the CADSES area by highhydrometeorologic resolution model-assisted al level of dry vs. climatological definition wet years and dry of the tropospheric flux of vs. wet seasons. water of Mediterranean Correlations origin. Analysis of mean between the state, variability and various water extreme events. balances at regional scale. People: Description of activities, components, means Expected output / deliverables Costs (in €) 88.700,00 Valerio Lucarini (Researcher), Robert Danihlik (Tech. Collab.) NWF Model Limited Area highresolution weather forecast model We may run it in hindcast mode (24 hours runs) every day for for 1961-2000 Works as magnifying lens for the CADSES area Very flexible in terms of resolution and area of interest Work Package 2 – Action 2.5 Month of Month of start end (mm/yy) (mm/yy) 01/2006 People: 12/2007 Description of activities, components, means Expected output / deliverables Statistical intercomparison of the Degree of agreement reconstruction of the between the hydrological cycle in the in various models. the CADSES area as obtained Deficiencies of from models of different level weather forecast of complexity. Analysis of the models in differences between forecast modelling the and climate models in the statistics of definition of the seasonal precipitation. climatology as well as of the statistics of the extreme events. Costs (in €) 87.200,00 Valerio Lucarini (Researcher), Ida Kriegerova (Tech. Collab.) DATASETS INTERCOMPARISON NCEP and ERA 40 reanalyses IPCC 4AR models simulations for XX century and climate change projections Other datasets for LAMs (such as PRUDENCE project of the V FW) Observations RIVER BASINS BALANCES (RiverNet) ODER DANUBE ELBE Work Package 5 – Action 5.1 Month of start (mm/yy) Month of end (mm/yy) 01/2006 12/2007 Description of activities, components, means Expected output / deliverables Costs (in €) Organization of meetings, conferences Public events, and seminars during the project publications, duration to disseminate the obtained brochures, results. Preparation of paper and outreach in multimedia publications. Training the press. activities. Development and Publicly maintenance of the web-site of the accessible project. PP2 will contribute to the web-site organization of public events with a budget of 10000 euros. PP6 will contribute with a total budget of 2500 euros. PP11 will participate to this action within the budget of PP1. 163.600,00 People: Valerio Lucarini (TD), Veronica Benedettelli (ATD), Carmelo Grasso, Donato di Camillo, Janka Strakova (Staff) Collaboration foreseen: PP2, PP6, PP11 Web-site HYDROCARE is already on-line Public Section (Technical Reports, Outreach, Links, Press) Private Section (Reporting, confidential documents, etc) http://www.hydrocare-cadses.net Publicity activities Press Releases Page on the Febraury 2006 issue of Parliament Magazine Media Partnership with Radio Lotte? Conclusions PP1 is strongly committed to making of HYDROCARE a real success PP1 encourages collaborations with all PPs in order to coordinate the execution of the actions It especially important to coordinate the publicity and dissemination activities: we need to decide very soon location and time of conferences, meetings, training initiatives and we need a common action on media.
© Copyright 2026 Paperzz