5th RENAISSANCE meeting- Zaragoza 24-25/04/2008 RENAISSANCE ZARAGOZA José A. Turégano UofZ/ Head of GEE 1 GEE W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of Design Standards and Bids W.P. 1.3 Wood-fuel supply chains assessment and organisation W.P. 1.5 Socio-economic research W.P 1.1 Energy Policy, Planning, R&D EcoDes: General approach (to be done by Oct 08) UofZ: Collaboration with AytoZ: Rules about urban efficiency and definition of soft/hard bioclimatic design (by Oct 08) W.P. 1.2 Definition and Validation of Design Standards and Bids W.P. 1.3 Wood-fuel supply chains assessment and organisation W.P. 1.5 Socio-economic research W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of Design Standards and Bids CENER: · Design standards for the Public School C. Domingo (done) · Validation of expected PhV production (done) UofZ: · Validation of Valdespartera standards compared with new CT · Building Certification for monitored buildings · New rules concerning ventilation W.P. 1.3 Wood-fuel supply chains assessment and organisation W.P. 1.5 Socio-economic research CENER: Expected PhV production N S UofZ: Validation of Valdespartera standards H&C increments EV H/D Orientation EV H/D Parcela Edificio Estado de ejecucion Estado Obra Contruccion Tabiques Rozas Enlucido X X X X X X X X X Estado Sondas T.Pisos T. Edificios T y H Salon Temp Habit Med Facha X X 4 1 X X 4 1 X X 3 1 UofZ: Building Certification for monitored buildings Norte 12 13 14 17 18 20 21 24 27 29 Sur Oeste Norte Sur Oeste Norte Sur Oeste Norte Sur Oeste Norte Sur Norte Sur Oeste Norte Sur Oeste Norte Sur Oeste Norte Sur Oeste Estructura X X X X X X X X X X X X X X X X X X X X X X X X X X Fachada X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Cableado X X X Sondas X X X Temp Gal X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N/A N/A N/A N/A N/A N/A 4 1 2 4 4 3 4 4 4 4 3 4 4 3 2 2 4 4 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 76 22 UofZ: New rules concerning ventilation GEE in collaboration with the COAA, CIRCE, and promoters will organize (7th may) a workshop about ventilation W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of Design Standards and Bids CENER:18 · Design standards for the Public School C. Domingo (done) Next months: · Validation of expected PhV production (done) To revise how current normative works with the UofZ: · Validation of Valdespartera standards compared with new CT “old”· Building design of buildings in Valdespartera Certification for monitored buildings · New concerning ventilation Share therules analysis with Lyon and Lombardy W.P. 1.3 Wood-fuel supply chains assessment and organisation W.P. 1.5 Socio-economic research W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of Design Standards and Bids W.P. 1.5 Socio-economic research EcoDes: testing (prepared to start) Next 18Social months: Strong actions concerning testing of users´ UofZ, ENDESA, Urbic: Coordination with EcoDes andhabits waiting to and the corresponding interaction, when possible, assume different task concerning · Users Presentations with data collected to modify and/or intensify the · Data gathering andinformation analysis. different ways of users´ /formation. W.P 2.1 Integrated Energy Networks W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis W.P. 2.3 Monitoring and Analysis W.P 2.1 Integrated Energy Networks Next 18 months: EVZ: Physical Network in Valdespartera for Demonstration Building To defineElectricity the necessary to get adata comprehensive and ENDESA: & gassheets consumption (individual/global) coherent information in an integrated network (Zaragoza, Lyon, Lombardy) UofZ : Network organization with the above to complete data for a. W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis W.P. 2.3 Monitoring and Analysis W.P 2.1 Integrated Energy Networks W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis EVZ: NextDemonstration 18 months: Building Performance (waiting for building c.) Local network, data probes, and Demonstration Building ( center CENER: Electricity & gas consumption data (individual/global) for for a. data storage and presentation on line) will be functioning and UofZ : · Comfort data for and Auxiliary and Renewable data reporting information the different analysis to verify the performance of organization everything planned. · Network with the above to complete data for a. W.P. 2.3 Monitoring and Analysis W.P 2.1 Integrated Energy Networks W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis W.P. 2.3 Common Monitoring and Analysis UofZ: Defining an energy flow and data presentation , revising standards on each community Next 18 months: to share and combine results with W.P. 2.2
© Copyright 2026 Paperzz