Studies in success Easy installation makes Lennox the preferred solution for NJ Dahl At a glance... The Business Need: A fast rooftop installation and reduced labour time on site. The Solution: The 2100m2 premise was fitted with 2 x Lennox KHA240 Landmark® Reverse Cycle Rooftop Units and 2 x Lennox LGH240 Energence® Gas/Electric Packaged Rooftop Units. Published: November, 2015 The sporting warehouse in Fyshwick, ACT was fitted with both Lennox Landmark and Lennox Energence units, utilising vertical roof curbs. NJ Dahl Heating and Air-Conditioning contractors established in Canberra in 1990. Today they operate as a market-leading Mechanical Contracting business tailored to the Residential apartment, hotel and commercial office space markets. NJ Dahl pride themselves on completing projects to the highest standards, on time and under budget. An association with Lennox began in 1993. Over the years, the company has become an advocate of the brand, installing Lennox Landmark and Energence Rooftop units across multiple commercial sites. Managing Director, Nick Dahl, commented; “I prefer to install Lennox Rooftop units because of the ease of installation, particularly when used with the vertical roof curb.” Two Lennox Landmark Rooftop Packaged Units and two Lennox Energence Gas/Electric Rooftop Packaged Units were recently installed on a Commercial Sporting Warehouse in Fyshwick, ACT. “What impressed me most about this installation was the neatness and simplicity of the installation. It was by far, one of the easiest rooftop installations I’ve done.” The vertical roof curb method of installation is estimated to be approximately 30% cheaper than the conventional exposed ductwork technique. Studies in success Roof curbs eliminated the need for additional penetrations and external ducting “Utilising the roof curb technique removed the need for further external ducting, that would have been exposed to the elements and reduced the efficiency of the system.” “I was also able to eliminate half of the roof penetrations, which meant a quicker installation and the reduced risk of potential leaks. My staff spent minimal time on the roof, with no hot work required. They easily completed the installation in 2 hours.” “Considering time, labour and material saving, I estimate the roof curb method of installation to be approximately 30% cheaper than the conventional exposed ductwork technique.” “I will continue to install Lennox and recommend the roof curb technique as a quality, reliable and cost effective system to my customers.” Energence® Rooftop Units Landmark® Rooftop Units Climate Control Solutions 13 23 50 heatcraft.com.au
© Copyright 2026 Paperzz