New SWM System in Lahore - Lahore Waste Management Company

New Solid Waste
Management System in
Lahore
(Technical Aspects)
Contents of Presentation





Vision Behind New SWM System in Lahore
Formation of Lahore Waste Management
Company (LWMC)
Why was Company needed?
Transition from old to new SWM System
Other Initiatives & Way Forward
Vision Behind New SWM System

To modernize the SWM system in
Lahore

To transform Lahore into one of the
cleanest cities of the world
Impediments

Lack of institutional capacity

Faulty outsourcing model

Financial constraints
Reasons for the Change
Formation of Company
 CM Punjab envisaged establishment
of a company on the basis of Turkish
model.

LWMC established on March 19,
2010
under
section
42
Companies Ordinance 1984.
of
the
 Services And
Asset Management
Agreement (SAAMA) signed on
June 25, 2011
 Assets,
resources and functions
were transferred to LWMC

Residual functions like;

Enforcement, regulation and
levy of tax
Agreement with M/s. ISTAC

Agreement signed on 27th December
2010 for technical support;

Waste characterization study

Capacity building of professionals

Identification and designing of
integrated waste disposal facility

Designing of new waste
management system
Design of New System

Turkish experts of ISTAC identified the
gaps in the existing system

New system was designed to outsource
SWM services to international companies
International Bidding
 Competitive and transparent bidding
process adopted

Tenders floated in Financial Times and
Gulf News

Contractors selected after detailed
technical and financial evaluations
Turkish Companies

The contract was signed on 3rd
November, 2011 for a duration of 07
years with two Turkish companies
namely;
1. M/s Al-Bayark in Zone I.
2. M/s OzPak in Zone II.
Zoning of Lahore
Current System – Street Sweeping

Poor quality of sweeping

Inadequate & obsolete
equipments

No health & safety gadgets
New System – Street Sweeping

Improved quality of sweeping

Improved design of tools and
equipments

Proper health & safety gadgets
and uniforms for workers
Current System – Mechanical Sweeping

Obsolete & inefficient
technology

High emissions of dust

Inadequate coverage

Poor quality of sweeping
New System – Mechanical Sweeping

Modern, efficient technology

Less / no dust emissions

Coverage of all main roads of Lahore

Better sweeping quality
Current System – Waste Storage

Littering & open heaps in the
absence of door to door
collection

Inadequate and improper
storage equipments

Open storage of waste
New System – Waste Storage

Introduction of door to door
collection through bags

Installation of adequate number
of new type of containers &
waste bins
Current System – Waste
Transportation

Open waste transportation

More than 20 years old machinery

Inefficient waste transportation
fleet

Lack of fleet monitoring
New System –
Waste Transportation

No littering during transportation

New, modern & efficient vehicles

Fleet monitoring through advanced
technologies
Current System – Washing

No specialized vehicles for
washing

Manual drainage after washing

Rare washing of squares/
walkways
New System – Washing

Specialized washing vehicles
with high pressure

Very less drainage effort

Regular washing of major
squares / walkways
Role of Citizens in New SWM
System

Follow the waste schedules / timings

Do not throw unwanted materials
(acid, cigarettes etc) in containers

Volunteer for protection of containers
of your area from fire and stealing
Other Initiatives & Way Forward
Sale of Waste to Private Sector

Agreement of sale of waste to private
sector;
1.
DG Khan Cement
2.
PNO Waste Management
Expected Technologies include : Segregation, composting or
energy from landfill Gas, anaerobic digestion or RDF
Development of Model Areas

Local Area Office for
complaint redressal

Waste collection in
commercial areas

Special arrangements after
rains and storms
Integrated Landfill Facility

Establishment of integrated landfill facility

Site identified

Geo technical investigations conducted

NOC from EPD issued

Land procurement in process
Removal of Waste from Open
Plots

Removal of waste from over
2000 open plots

Resolution of complaints
1.
from ECRS (1318), Dengue
surveillance committee (200)
2.
Special Branch

Establishment of waste transfer stations
at suitable locations

Establishment and outsourcing of
integrated waste disposal facility

Development of systems in consultation
with ISTAC for :

Hospital

Industrial

Construction & Demolition waste

Development of a proper legal framework for SWM
System
 Integration of DHAs and Cantonments

Revenue generation through waste streams
DOCUMENTRY ON NEW SOLID
WASTE MANAGEMENT SYSTEM
IN LAHORE
Video
THANK YOU