Mixed use and/or commercial development application Property details Lot: Property account number: House: Street: Suburb: Owners details: Contact name: Phone/mobile: Address: Applicant details Company name: Contact name: Address: Would you prefer all future correspondence for this application to be e-mailed? If yes, please supply e-mail address: Phone/mobile: Fax: Builder’s job number: Builder’s customer number: Purpose of application State type of proposed development: Estimated start date: (ie.2 residential units & 4 offices. 3 warehouses, factory additions) Estimated construction cost: $ Ex building to be demolished? Est completion date: If so, what date ? Owner to occupy? Water supply Wastewater supply Is there an existing water service ? No. of existing toilets If no, what size and flow rate is required? No. of added toilets Meter Size: mm Flow Rate l/min No. of removed toilets Is an upgrade of the existing water service required? Is a sewer junction req’d? If yes, what size and flow rate is required? Please complete Industrial Waste application if applicable No. Industrial Waste fixtures: Will your discharge rate exceed: Meter Size mm Flow Rate Size: 100/150/225mm _________________ l/min 2 L/sec (150mm sewer) Is the meter required to be installed in a box? Note: Applies to services up to 50mm, provided backflow risk is not classified “high” as determined by the Water Corporation. Conditions apply, see page 3. 3 L/sec (230mm sewer) How many services are to be called for? Estimated wastewater discharge _________ % Is a fire service required? If yes, what size? mm Estimate consumption _______________ kilolitres Will your annual water consumption exceed 8000kL? Mixed use and/or commercial development application Please provide measurement from nearest boundary: Rear of Lot House Front of Lot Due to electrical risks we are prevented from installing the water meter less than 500mm from the centre of an electrical power dome Your privacy Information collected on this form will be used for the purposes directly related to the service you have requested. Information may be shared with local government authorities, government agencies and to service providers in order to provide the service you have requested. Your prior consent will be sought for any other proposed disclosure. For further information on Water Corporation's Privacy Policy visit www.watercorporation.com.au Conditions relating to the provision of a water and sewerage connection for the attached property: • • • • • • • • With respect to this application, I agree and accept the following conditions, and where this form is selected as being read and accepted by the applicant for and on behalf of an owner, the applicant shall inform the owner of these conditions, that: Water Corporation will endeavour to provide a standard water supply connection within 10 working days of receiving a correctly completed application form, and payment of any associated fees. The connection will not be made until all fees associated with this application have been paid. Water Corporation will install the meter 150mm above the ground level. Any alterations you wish to make to the ground level must be completed prior to your application for water supply connection. You will also need a clear space of not less than 300mm horizontally and 1200mm vertically from the meter to ensure easy access by Water Corporation or its contractors. Where services are not pre-laid, and there being no conflict with the above condition, the connection will be laid 500mm from the side boundary you nominate on your application form. (Note: You or your builder will need to ensure that side boundary survey pegs are in position and visible before you apply for a connection. This will ensure your service is provided in the required location.) A water service and standpipe will be installed at the location of your choice. Note: The location of the connection and the meter may be pre-determined, for example, if a pre-laid service, or duct, was installed by the developer at subdivision, or a water service and meter exists from a previous development Where the main is located on the far side of the road reserve, the water supply connection will not be located opposite a T-junction or a private driveway. In all cases, except where it is excluded in the Operating Licence, Water Corporation will provide a minimum static pressure of 15 metres head within the Perth Metropolitan Area and minimum static pressure of 13 metres head within country urban areas. No higher pressure shall be relied upon for any purpose. Customer • • • • The builder or principal contractor shall be responsible for the protection and cost of maintenance of the Corporation’s service and meter (if fitted) until he notifies Water Corporation of the date of practical completion of the works under construction Commercial water service charges are based on the size of the meter serving the property. Any upgrade or downgrade to a water service (meter size) will result in a change to the service charge. You will keep the service or communication pipe and prescribed fittings in good repair and ensure the portion of the Corporation's service on your property and the meter is adequately protected from damage, and accept liability for the cost of repairing any damage or replacing the meter if stolen. You will be required to comply with the relevant Acts and by-laws, and any special conditions that may apply to your connection. Mixed use and/or commercial development application • • • • • • • Any relocation of the service at your request will be at your cost. However, relocation in some cases may not be possible due to the position of electrical domes or other obstacles. The area of land between the proposed position of the water meter and the water supply is to be kept clear of obstruction in order that the connection can be made. You undertake not to remove the standpipe before the final plumbing connection is made to the water meter. You accept ownership and responsibility for all internal reticulation on your side of the meter, including the standpipe. Once a meter is installed, you are responsible for the payment for water used, including water usage vacant land. If required by the Corporation I will have a containment backflow prevention device installed as part of the plumbing system. This will require annual testing and certification by an approved contractor to ensure ongoing function. In all cases, the maximum static pressure is 100 metres head, except where the Operating Licence states that pressures may exceed 100 metres head. Where this occurs, the property owner is responsible for the cost of a pressure reduction valve. I acknowledge that I am responsible for ensuring that the property details provided by me are true and correct and I confirm that the Property Details are true and correct. Meter Boxes All meter boxes are to be installed by the Water Corporation or its approved installers providing it meets all Water Corporation safety requirements. Subject to the customer agreeing to the following conditions the Water Corporation or its approved installer will install the box. Conditions It is the owner/applicant’s responsibility to: • Provide the surround by using either standard brick pavers (230mm x 115mm x 65mm) or a concrete surround (230mm x 230mm x 100mm thick) • Ensure a clearance of 300mm around the entire box and 1200mm above the box is maintained. This includes boundary fences/walls • Ensure that there is no build-up of soil inside the box. Soil build-up can cause problems during reading and maintenance of the meter. • • • • Ensure the internal box is clear of dangerous insects and spiders No part of the box or its supports are to be within 500mm of the centre of any power dome Obtain local authorities written approval if box is to be located in a road reserve If the ground level of the current placement is altered in future the owner will have to make application to the Water Corporation and pay all costs to raise/lower the water meter/box to that level Any future re-instatement of the surrounds due to ongoing maintenance will be the owner’s responsibility unless using standard pavers as per the first dot point above and providing the pavers are in good condition the Water Corporation will relay pavers to an adequate standard • Print Name Signature Date You can submit your request via one of the following options: Online: Email: Fax: Mail: Go to www.watercorporation.com.au and select Buildernet® [email protected] Fax completed form to (08) 9420 2585 Post completed form with copy of plans to: Building Services, Water Corporation, PO Box 100 Leederville WA 6902
© Copyright 2026 Paperzz