Hall County Residential Final Plat Planning Department Engineering Division Traffic Engineering Division Fire Services Gainesville Public Utilities Environmental Health 1 2-5 6 7-8 9 10-12 13 Hall County Final Subdivision Plat Checklist Subdivision Name Date Entered: Developer: _______________________________________ _______________________________________ _______________________________________ Phone _________________________________ Surveyor/Engineer __________________________________________ __________________________________________ __________________________________________ Phone:___________________________________ Public water Individual well Site Location Tax parcel number Total Acreage Zoning district Number of lots Individual septic Public sewer Linear feet of road Date Approved ______________________________________________________________________ Approved Road Names Where ** is indicated in column, please add remarks in notation form on the plat. Please place all notes in the order they appear on this review sheet. ________________________________________________________________________ PROVIDE THREE (3) 11 X 17 COPIES OF THE FINAL SUBDIVISION PLAT FOR ADDRESSING. THE ENTIRE SUBDIVISION MUST BE ON ONE (1) SHEET. THIS MUST BE PROVIDED BEFORE THE FINAL PLAT CAN BE PERMITTED AND RECORDED. ________________________________________________________________________ ________________________________________________________________________ Please return this checklist with the original plans 2 1 Total acreage of site 2 Number of lots 3 Minimum lot size 4 Proposed use of each lot 5 Water supply system 6 Sewer system 7 Length of roads in linear feet 8 Phasing of subdivision 9 Estimate time of completion 10 An outline of any proposed organization to control a portion or all of the tract, i.e. Homeowners Association 11 Notice of intent to dedicate any portion of the property to the public 12 Name of subdivision 13 Name and address of owner of record 14 Name and address of subdivider 15 Date of plat drawing, graphic scale, north point, notation as to the reference of bearings to magnetic, true north, or grid north 16 Location of tract (Militia District, Land District and Land Lot), giving area of each individual lot 17 Primary control point to which all dimensions, angles, bearings, and similar data on the plat shall be referred 18 Tract boundary lines, right-of-way lines of streets, easements, and other right-ofway and property lines of all lots with accurate dimensions; bearings or deflection angles, radii arcs, and central angles of all curves 19 Name of each street 20 Minimum setback lines on all lots and other sites 21 Location and description of monuments 22 Names of recorded owners of adjoining unplatted land 23 Reference to recorded subdivision plats of adjoining platted land by record name, date, and number, when known 24 Certification by surveyor as to the accuracy of the survey and plat 25 Lot lines with dimensions and lot area 3 26 When the tract of land to be subdivided abuts on U.S. Government property, then the final plat of the subdivided land shall show a tie r ties of land lot lines conforming to U.S. Government take line descriptions 27 When lots are located on a curve or when side lot lines are at angles other than ninety 90 degrees, the lot width at the building line shall be shown 28 Lots or sites numbered in numerical order and blocks lettered alphabetically. In general, all lots should be numbered in numerical sequence without using block letters 29 When the subdivided property abuts Buford Dam Reservoir property or easement, the 1,070-foot contour line shall be shown and designated “Lake Sidney Lanier—Normal Lake Level” and the 1,085-foot contour line shall be shown and designated “Lake Sidney Lanier—Maximum Lake Level” 30 Location, dimensions and purpose of all drainage structures and of any easements, including slope easements, if required, and public utility right-of-way lines, and any areas to be reserved, donated, or dedicated to public use of sites for other than residential use with notes stating their purpose and limitations; and any areas to be reserved by deed covenant for common uses of all property owners 31 Any creek or stream bank buffer setback shall be noted and indicated on all lots 32 Places for certificates and statements specified in Section 305 33 Attached letter from county commission office verifying zoning and any zoning conditions if applicable 34 Statement that reads: “If during the construction of roads, utilities, etc., the natural topography was altered in such a manner as to significantly change the grade of any building lot, the Hall County Zoning Board of Adjustment shall not deem such alteration a physical hardship if setbacks cannot be met by the ensuing topography” 35 The property’s zoning, building setbacks, minimum house size (if applicable), and any other notes as determined necessary 36 A notation indicating that all requirements as specified in Section 17.280 of the Hall County Zoning Regulation, Tree Protection shall be met upon the building of residential houses 37 A notation that states: “The side and rear setback of corner lots shall be determined by the orientation of the dwelling” 38 If the subdivision is located within the North Oconee Watershed Protection Area, all appropriate creek and stream bank setbacks and lot density requirements shall be noted and/or indicated on individual lots 39 If the subdivision is zoned PRD (planned residential development) all requirements pertaining to the building of residences shall be noted or shown on the plat. Such information would include minimum house size, architectural style, or orientation 4 40 If lots within the subdivision have frontage on an arterial road, the setback from the centerline of the road is noted and shown 5 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION HALL COUNTY, GEORGIA JAMES H. MILLER, P.E. POST OFFICE DRAWER 1435 County Engineer GAINESVILLE, GEORGIA 30503 Phone: 770/531-6800 Fax: 770/531-3945 SUBDIVISION PLAN REVIEW FINAL PLAT CHECKLIST S/D Name: Reviewer: Tammie Walker Date: ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------- S/D Name, Total Acres. Name & Address of owner of record. Date of plat drawing, graphic scale, north arrow. Notation as to reference of bearings to magnetic, true north, or grid north. Location of tract (LL, Land District, G.M.D.) giving area of each individual lot. Tract boundary lines, street R/W lines, easements, & other R/W lines. 30 ft. radius @ intersections, min 60 ft. radius in cul-de-sac. Property lines of lots with accurate dimen., bearings, deflection angles, radii arc, & central angles of all curves. Each street name. Min. setback lines on lots and other sites. Location and description of monuments. Name of recorded owners of adjoining unplatted land. Surveyor certificate-accuracy of survey and plat. When the tract of land to be subdivided abuts on U.S. Govt. property, then the Final Plat of the subdivided land shall show a tie or ties of Land Lot lines. When the subdivided property abuts Buford Dam Reservoir property or easement, Lake Sidney Lanier notes are required. Location, dimensions and purpose of all drainage structures and of any easements, including slope easements, if required, and public utility right -of-way lines, and any areas to be reserved, donated, or dedicated to public use of sites for other than residential use with notes stating their purpose and limitations; and of any areas to be reserved by deed covenant for common uses of all property owners. Places for certificates and statements specified in Section 3.07. Sidewalk and pavement statements and details if not installed. Corrected digital copy of final plat and Stormwater detention facility. Show 5 feet perpetual easement and note Show Construction easements Fire Hydrant locations. Disposal Areas. Check R/W of streets between old and new phases. Make sure R/W from previous phase matches with new phase. As built Stormwater detention facility with state coordinate system and fence detail. Note: No obstruction shall be built, constructed or planted in the access easement (s) to the storm water management facility (ies). Vicinity Map. Bond. Sign Payment. Punch List. James Miller Review. 6 DEPARTMENT OF PUBLIC WORKS TRAFFIC engineering division HALL COUNTY, GEORGIA ___________________________________________________________________________________________________________ SCOTT G. PUCKETT POST OFFICE DRAWER 1435 Traffic Engineer GAINESVILLE, GEORGIA 30503 Phone: 770/531-6800 Fax: 770/531-3945 ACCESS PLAN REVIEW SHEET DEVELOPMENT: ________________________________________________ LOCATION: ____________________________________________________ REVIEW DATE: ________________REVIEWED BY: ___________________ ITEMS: ___ 1. Location sketch map. ___ 2. North arrow. ___ 3. Scale in feet per inch. The scale should be 1”=20’ or larger. If a smaller scale is used on the overall plans, then the access details and work on the roadway right-of-way must be enlarged. ___ 4. Show existing features with dash or “light” lines and all proposed features with solid or “heavy” lines. ___ 5. Show the distance from the centerline of the roadway to the right-of-way line. ___ 6. Show the width of existing roadway pavement, lane lines and lane widths. ___ 7. Show State Route numbers and U.S. numbers (if applicable) and names of all roadways which appear on the plans. ___ 8. Show the distance from one corner of the property, measured along the right-of- way line, to the centerline of the nearest named intersecting roadway or highway. ___ 9. Show the location of existing and proposed structures. ___ 10. Show the posted speed limit of the roadway on which access is desired (note if none posted). ___ 11. Show all existing roadway signs within the frontage being developed (note if none exists). ___ 12. Show the distance between structures or foundations on the property and right-of-way lines. ___ 13. Show the proposed driveway(s) or roadway(s) – include the width to the face of the proposed curb or to the edge of asphalt if no curb is proposed or required. 7 ___ 14. Show the proposed decel lane(s), left turn lane(s), tapers, and lane shifts (if applicable) include lengths, widths, and required pavement markings. ___ 15. Add the following notes: ___ “Contact Hall County Engineering at (770) 531-6800 24 hours (minimum) prior to required inspections. Hall County must inspect subgrade, base, and be present during paving”. ___ “Sawcut required at edge of existing pavement to provide joint uniformity”. ___ “All temporary traffic control must be in accordance with the current edition of the Manual on Uniform Traffic Control Devices.” ___ 16. Show the angle of the proposed driveway(s) or roadway(s) to the roadway alignment. ___ 17. Show the distance between driveway(s) or roadway(s) to the property line measured along the right-of-way line. ___ 18. Show the distance between driveways or roadways if more than one is proposed. ___ 19. Show the radii of all curves on the proposed driveway(s) or roadway(s) measured to the face of the proposed curb or edge of pavement as applicable. ___ 20. Show the sight distances from each proposed driveway or roadway using the standards for intersection sight distance set forth in the current edition of AASHTO’s “A Policy on Geometric Design of Highways and Streets”. ___ 21. Access profile – including all lanes of existing roadway and the proposed access to the right-of-way line. Include percent slope. ___ 22. D.O.T. driveway permit (if applicable) – required prior to Hall County Traffic Engineering approval. ___ 23. Pavement cross section detail. ___ 24. Pavement marking details. ___ 25. Curb and gutter detail (including end taper). ___ 26. Street lighting preliminary letter from electric utility company (Subdivision requirement) NOTE: Items marked with a red “X” must be corrected prior to Hall County Traffic Engineering approval. COMMENTS: 8 Hall County Fire Services Development Comments 1. A water main with hydrants spacing as necessary to facilitate a 300-foot lay of fire hose to any portion of all buildings. This distance is measured ‘as the truck travels’. All fire hydrants shall be capable of providing a minimum flow of 1250 gallons per minute. 2. Hydrants and mains shall be installed and under pressure before any combustible construction is started. 3. Certification and flow tests shall be provided to the Fire Department after installation of the water mains. 4. Every building hereafter constructed shall be accessible to fire department vehicles. 5. Maintain access for emergency vehicles around and to all buildings under construction. i.e.: In times of rain or mud, roads shall be capable of carrying the weight of a fire truck by being paved or having a crushed stone base etc. This emergency access shall be a minimum of 20 feet wide (NFPA 1141). 6. All burning of land clearing debris must be done according to Hall County Fire Services and EPD regulations. Any questions or concerns should be directed to David Kimbrell Hall County Fire Marshal at 770-531-6838. 9 FINAL PLAT / AS-BUILT PLAN REVIEW CHECKLIST Gainesville Public Utilities Department FOR WATER MAINS AND SANITARY SEWERS JANUARY 2003 ************************************************************************ **************************** PROJECT NAME ____________________________________________ PLANS RECEIVED _______________ PLANS REVIEWED _____________________ PLANS RETURNED TO ENGINEER/ARCHITECT WITH CORRECTIONS TO BE MADE _________ REVIEWED BY: _______________________________PHONE#:_________________ ************************************************************************ **************************** COMMENTS:___________________________________________________________ ________________________________________________________________________ _________________________________________________________________ **ORIGINAL RED-LINE COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL. CONTACT PLAN REVIEWEE AND SCHEDULE APPOINTMENT FOR PLAN APPROVAL/SIGN-OFF. ** GENERAL 1)_______ 2 sets of preliminary drawings furnished for initial review. 2)_______ Final plat and/or as-built drawings shall bear the following note: Owners Dedication Certificate City of Gainesville Hall County, Georgia The owner of the land shown on this plat and whose name is subscribed thereto, and in person or through a duly authorized agent, acknowledges that this plat was made from an actual survey and dedicated to the City of Gainesville forever, all water mains, sanitary sewers, easements, and associated appurtenances thereon shown. Owner___________________________________________ Date ____________________________________________ 10 3)_______ Plans stamped by Professional Engineer or Registered Land Surveyor. 4)_______ Legible project location map provided. 5)_______ Elevation data referenced to mean sea level (MSL) and survey referenced to state-plane coordinate system. WATER 1)_______ Label existing perpetual water main easements. 2)_______ Label all pipe sizes and pipe material. (Including casing pipe if applicable) 3)_______ Label all water valve locations and sizes. 4)_______ 5)_______ Include 3 distance references to fixed objects for all valves excluding fire hydrant lead valves. Do not reference valves to one another. If drawing becomes illegible, include enlarged drawing of water valve details. Label tapping sleeves and valves and back tap if applicable. 6)_______ Label all pipe fittings including tees, bends, reductions, etc. SEWER 1)_______ Label existing perpetual sanitary sewer easements. 2)_______ Label all pipe sizes and pipe material. applicable) 3)_______ Label all existing manholes and service line clean-outs. 4)_______ Label manhole deflection angles. 5)_______ Include sanitary sewer profile with following information: Pipe size, material, and slope A. B. C. D. (Including casing pipe if Pipe size, material, and slope Pipe length between manholes Manhole numbers corresponding to plan view numbers Manhole elevations (top, invert in, invert out, outside drop at top and bottom E. Existing utility crossings F. Finished grade 11 BACKFLOW PREVENTION AND PRETREATMENT 1)_______ Show location of existing fire vault and associated appurtenances. 2)_______ Show location and type of existing pretreatment device (i.e. grease trap, lint/hair trap, oil interceptor, muffin monster, etc.) and sample station manhole. 3)_______ Show location and type of existing backflow preventers (i.e. double check valve, double detector check valve, reduced pressure zone (R.P.Z.), etc.) 12 Jim Martin, Commissioner Kathleen E. Toomey, M. D., M. P. H., Division Director Melody A. Stancil, M. D., District Health Director, DHR District 2 Georgia Department of Human Resources - Two Peachtree Street, NW - Atlanta, GA 30303-3142 Division of Public Health - Two Peachtree Street, NW - Atlanta, GA 30303-3142 Division of Public Health - District 2 - 1280 Athens Street, SE - Gainesville, GA 30501 (770 535-5743 Hall County Environmental Health - 450 Prior Street, SE - Gainesville, GA 30501 (770)531-3973 Final Subdivision Checklist Developers must turn in a final plat for review prior to providing copies for signing. Combined on one sheet, the following is required: 1. Proposed lot lines an property line dimensions 2. 2' topography contours 3. Level 3 soil evaluation boundary lines and legend (if a level 3 is done for preliminary review, the soil scientist must complete an update at the time of the final. This will reflect any alterations when the roads are built) 4. Lot sizes exceeding 2 acres must have soil evaluations in the area of development (where the preliminary and secondary sewage systems are to be placed). This soil study area must be a minimum of one acre. 5. 50' drain line setbacks from creeks, rivers, streams and lakes 6. 100' drain line setbacks (radius) from all wells or spring heads located within 100' of property boundaries 7. Location of flood plain if applicable 8. Location of 1085 elevation in association with property located on Lake Lanier 9. All existing and proposed easements needed for lot size calculation in accordance with Hall County Board of Health lot size requirements 10. List of non-restricted area for each lot when calculated by in accordance with the Board of Health requirements 11. Soil boundary lines must be placed on the final plat used for recording (this can be done on the main plat or as a 2nd sheet (e.g. sheet 2 of 2) etc.) Minimum lot size: See attached sheets for lot size calculation (Hall County Board of Health Resolution, Dec., 2001) Developers must turn in a final plat for review prior to providing copies for signing. The HCEHD may require statements to be placed on the final plat that would be specific to the development. Located within the plans: A statement about potable water (individual wells or is public water available to this property) Lot sizes stated according to Board of Health minimum lot size resolution. This includes the total lot square footage, the square footage excluded, and the square footage remaining (total minus excluded) Separate: • Soil legend sheets which include soil names, symbol legend, depth to bedrock, depth to seasonal high water table, % of slope, estimated percolation rate, depth to optimum percolation, provided by soil scientist • If soil map is updated, must submit a copy of the new soil map showing soil boundaries and boring locations • Vicinity map • Must pay $25.00 per lot prior to or at time of approval of preliminary plans. The fee is charged per lot turned in on the initial review The HCEHD may require statements to be placed on the final plat that would be specific to the development. Please refer any specific questions to either Tim Callahan or Patricia Lacey by calling (770) 531-3973. 13
© Copyright 2026 Paperzz